HITACHI EX1800 Excavator starting new bench

Поділитися
Вставка
  • Опубліковано 26 жов 2018
  • Hitachi EX1800 mining excavator loading CATERPILLAR 777 trucks starting new bench so it can then get trucks down and begin production loading. Listen to how hard this rock is, it sounds like glass shattering as he is digging!
  • Розваги

КОМЕНТАРІ • 26

  • @scruffy6151
    @scruffy6151 5 років тому

    Thank you. Just a wi bit of hard face on that bucket. Nice to see a video from you.

  • @ConstructionMachinesChannel
    @ConstructionMachinesChannel 5 років тому +1

    Awesome power. Super video 👍

  • @dougsmith1166
    @dougsmith1166 5 років тому

    That’s one tuff machine

  • @mpsimonful
    @mpsimonful 5 років тому

    belle vidéo ! merci.

  • @johnnymurff4137
    @johnnymurff4137 3 роки тому +1

    Awesome footage and yes it does sound like glass. What kind of material is and what will it be crushed and then turned into gravel or aggregate or road base material?? Like to see blasted rock or stone being loaded and handled!!

  • @MrWhiseguyy
    @MrWhiseguyy 5 років тому

    Great!!

  • @phillipbonner5215
    @phillipbonner5215 5 років тому +1

    That's a big excavator

  • @DirkCannon
    @DirkCannon 4 роки тому

    I think this is vulcan look how dark that rock is

  • @strangefruit8776
    @strangefruit8776 5 років тому +1

    Why take such deep cuts? I’ve seen a lot of guys do it that way but never really understood it because of the loss of cycle time and the safety factor of working next to such a drop off.

    • @briangardiner1015
      @briangardiner1015 5 років тому +2

      that is how they do it is in benches. What makes the cycle times longer is dumping behind himself. In the description it says they are starting a bench. I think once there is room the trucks will be on the floor of the cut and the cycle times will decrease. If a bench is left not being mined according to OSHA Regs there has to be a berm protecting someone from driving off the edge. I think the berm needs to be 4ft high.

    • @TheRancher250
      @TheRancher250 5 років тому +1

      Brian Gardiner OSHA has no authority on a mine site it falls under MSHA regulations. Yes any place there is a potential for a roll over it must be bermed, however there is no set height in ft., it is mid-axle of the largest piece of equipment working in the area.

    • @DirkCannon
      @DirkCannon 4 роки тому

      @@TheRancher250 took the words out of my mouth

  • @michaelwalker4456
    @michaelwalker4456 5 років тому +1

    Is that at Vulcan?

  • @user-th7yo7kk6v
    @user-th7yo7kk6v 4 роки тому

    쓰레기 라는 말은 곧 다른 사람의

  • @LYEARTHMOVERS
    @LYEARTHMOVERS 5 років тому

    Awesome!!!

  • @robertjackson98
    @robertjackson98 5 років тому

    great video

  • @rickysdiecastmodels3067
    @rickysdiecastmodels3067 5 років тому

    Nice one👍

  • @thunderstormzlightning
    @thunderstormzlightning 5 років тому

    Awesome

  • @canvids1
    @canvids1 5 років тому

    that is some heavy lift. I used to operate a gantry crane that would lift 40 ton. Anyone know how many ton this machine is lifting?

    • @TheDennisZb
      @TheDennisZb 5 років тому

      Specs say max lifting force 60 ton...

    • @samk4369
      @samk4369 3 роки тому

      About 20-30 tonne

  • @DirkCannon
    @DirkCannon 4 роки тому

    Is that Vulcan materials in corona?

  • @donkuhner5541
    @donkuhner5541 5 років тому +1

    Where is this ?