    @paulf4650 2 місяці тому

    Great footage, thank-you for posting! I noticed the traffic backed up on the Dosher cutoff, on my way down 87 toward 211 and was able to avoid it.

  • @jimbriggs1600
    @jimbriggs1600 2 місяці тому

    I hope you will do a few videos of Barnhill's NC 133 overpass construction at NC 211. Would that be possible?

    • @davidfix7340
      @davidfix7340  2 місяці тому

      I’m thinking about doing updates on the entire 211 widening project, and the 133 overpass will be a priority. It will be interesting to see if they finish that one before the Midway overpass.