Hi, it connects like any other category 1 3 point hitch attachment does. If you need to see how that works, yes I can provide that. Please let me know if you still want to see it.
I found a tractorbynet website where someone used a 3/4" shackle for the bottom quick hitch pins and they have some pictures, but if I remember correctly YT doesn't allow me to paste a url in here. I'll try it but if you don't see one, you may need to google for it. Botajames TractorByNet.com thread 418527. www.tractorbynet.com/forums/threads/quick-hitch-for-betstco-flail-mower.418527/
I’m having an issue connecting my top point. Should I do that one first. I’ve always used my quick hitch for everything never connected anything without it before. Give me the order such as too mount then both bottom them pto shaft is this correct.
I pull my top link up and out of the way (tie it off somewhere) and I have the pat's easy change on my lift arms. So I connect the lift arms first, then after those are secured then I lower my top link and attach it. I then attach my pto shaft, but I presume you could do the pto shaft and then top link, but that's not how I've done it.
can you show how to attach to compact tractor
Hi, it connects like any other category 1 3 point hitch attachment does. If you need to see how that works, yes I can provide that. Please let me know if you still want to see it.
I found a tractorbynet website where someone used a 3/4" shackle for the bottom quick hitch pins and they have some pictures, but if I remember correctly YT doesn't allow me to paste a url in here. I'll try it but if you don't see one, you may need to google for it. Botajames TractorByNet.com thread 418527.
www.tractorbynet.com/forums/threads/quick-hitch-for-betstco-flail-mower.418527/
I’m having an issue connecting my top point. Should I do that one first. I’ve always used my quick hitch for everything never connected anything without it before. Give me the order such as too mount then both bottom them pto shaft is this correct.
I pull my top link up and out of the way (tie it off somewhere) and I have the pat's easy change on my lift arms. So I connect the lift arms first, then after those are secured then I lower my top link and attach it. I then attach my pto shaft, but I presume you could do the pto shaft and then top link, but that's not how I've done it.
Appreciate for it in there last night. Do you know any quick hit hitch mods I can do to make this work with quick hitch setup.