T4 work | SILL WELDING | SUSPENSION | STEERING | SERVICING

Поділитися
Вставка
  • Опубліковано 30 січ 2025

КОМЕНТАРІ • 9

  • @scottwalker6792
    @scottwalker6792 2 місяці тому

    Nice work mate.

  • @DavidCarrington-jr7ur
    @DavidCarrington-jr7ur 2 місяці тому

    Top Job 💪😁

    • @russwalker78
      @russwalker78  2 місяці тому

      @DavidCarrington-jr7ur thanks David, appreciate it.

  • @Gary002
    @Gary002 2 місяці тому

    Jeez tou certainly crack on, you've done the jobs in a few weeks that ive needed done for a year 😂

    • @russwalker78
      @russwalker78  2 місяці тому

      @Gary002 😂 Rome wasn't built in a day, you got time!
      It's my daily work van mate so needs to be ready to go with minimal down time.

  • @jamesward5721
    @jamesward5721 Місяць тому

    Did pretty much the same list (plus driveshafts) for a customer, last 2 days. Have to say it was a fair mission between dicking with the shaft boots & freeing off the stuck-fast torsion bar tensioners. The welding work was straightforwards but for me, replacing the inner tie-rods or more so persuading the new rubber boots into position was a right pita - access to the steering rack to get the seal on & over is rubbish.

    • @russwalker78
      @russwalker78  Місяць тому +1

      @jamesward5721 feel your pain dude! Inner tie rods and wheel bearings are my nemesis!

  • @LordFlashheart1
    @LordFlashheart1 2 місяці тому

    Great work, did you prime and paint over the stone chip?

    • @russwalker78
      @russwalker78  2 місяці тому +1

      @LordFlashheart1 primed, then seam sealer then stone chip. No need to prime the Red Stripe Sealer before stone chip after reading the can 👍