If Sholinganallur Bus Stand And Bus Depo Comes, Then It Will Be Very Useful For Surrounding People, Easy To Switch Between Bus Stand And Metro Station...
Station ,pier cap and girder work thaan most ah remaining. But good progress by next year end almost all construction(except flyover parts) ending stage ku poitu signalling and track work start pannidalam,intha speed la ponna.
@@rraja345 Recently travelled from Maduravoyal to Koyambedu. Barricades are almost removed in the median. As of now work is not happening in this stretch.
Stoplam kandippa panna matanga bro.. Metro work start panradhuku munnadila irundhey andha road congested ah than irukum bro.. Metro vandha piragu than konjam free agum bro..
@@sureshkrishna0507 Today i travelled from Maduravoyal to Koyambedu noticed all barricades ( Double decker Expressway ) removed in the median. So work is not happening in this section. May be i will try to capture some other spot
Metro Work Update Vera Level Capture
@@pg4832 Thanks
நம்பி வளவன் உங்களுடைய மன உறுதியை பாராட்டுகிறேன். சப்ஸ்கிரைபர் இல்லையென்றாலும் தொடர்ந்து வீடியோ போடுகிறீர்கள். நன்றி.
நன்றி
If Sholinganallur Bus Stand And Bus Depo Comes, Then It Will Be Very Useful For Surrounding People, Easy To Switch Between Bus Stand And Metro Station...
Thank you brother.. 🙏
@@gabrielleraul488 Thanks
Bro., Nambi Vallavan, very nice compilation.
@@ramakrishnansethuraman2068 Thanks
Station ,pier cap and girder work thaan most ah remaining. But good progress by next year end almost all construction(except flyover parts) ending stage ku poitu signalling and track work start pannidalam,intha speed la ponna.
@@saikrishnathiwakarrk Yes
Nice Coverage! Can't wait till 2027 to witness this.
@@Thiruprakashcb Thanks
Good updation congratulations
@@Karalmarks_Pvm Thanks
Excellent👍
@@joobypaul2913 Thanks
Vanakkam
Fantastic
@@skumaran7192 Thanks
🎉🎉🎉
Bro Maduravoyal port expressway video podunga
@@rraja345 Recently travelled from Maduravoyal to Koyambedu. Barricades are almost removed in the median. As of now work is not happening in this stretch.
What is SRP Tools meaning
I think it is company name dealing with automobile spare parts located in OMR road
which city is this?
@@ss-416 Chennai
@@NambiValavanoh nice chennai is so clean and mighty and chennai metro looking very nice
Bro ippadiya Medavakkam to solingnalur project shout down panna nalla irukkom bro
@@S.lokesh1111 Will do
@@NambiValavan mudiyala bro waste of time and money romba traffic aguthu
@@NambiValavan stopped Ana romba use full irukkom
Stoplam kandippa panna matanga bro.. Metro work start panradhuku munnadila irundhey andha road congested ah than irukum bro.. Metro vandha piragu than konjam free agum bro..
@@sureshrs145 mudiyala bro Medavakkam thukku irundha alage pochu, yevan idea kudhuthanutherilla.
Its not tcs stop. They changed it to kcg college long ago
@@samuelabisheik357 Ok
Maduravoyal double decker flyover work status podunga bro
Currently work has slowed down
But work panra status video capture
Panna nalla erukom thonuchi just sonna bro..@nambivalavan
@@sureshkrishna0507 Today i travelled from Maduravoyal to Koyambedu noticed all barricades ( Double decker Expressway ) removed in the median. So work is not happening in this section. May be i will try to capture some other spot
@@NambiValavanok
Update kuthambakkam bus stand
@@thameemansari9678 Will try
Metro work eppo mudiyum innum 10 years aaguma.😂😂😂😂
@@LokrajG.V Phase 2 entire corridor complete aga 3 to 4 years agum nu ninaikiren.
Sure 2029 or 2030 aydum
1st like view 😊