Excavation | RUB | Railway line | Drainage System | Water Logging | Sump | Rain Water Harvesting
Вставка
- Опубліковано 5 вер 2024
- Excavation || RUB || Railway line || Drainage System || Water Logging || Sump Arrangement || Pipe
Civil construction method of rail under bridge and How to drain heavy rain water logging in rail under bridge through 3D Animation. In this video you will go through step by step construction of RUB and it's drainage system arrangement.
Solution:- The traffic of underpass can move easily during heavy rain fall.
@MinistryofRailwaysIndia @INDIANRAILWAYSCANDV @NationalHighways @StatehighwayoneCoNzOfficial
Created by Dessin Solutions Pvt. Ltd.
Contact - +91-9999240306, 9711722997
Good information thank you 👍🏻
Nice information. I think many underpass in India lacks this. Recently there was a loss of life in Bengaluru because of flooding in underpass.
but what about the rubble which is getting settles in the distilation chamber?
so de-silting is the only maintenance required for this system to work and traffic don't get stuck during and after rain.
DFCCIL has constructed two such RUBs near Zeta-2, Greater NOIDA and even before monsoons this drainage system is proving useless.