Thanks for the video. Pls correct the calc error of no 8 & 9 (1.881 - 1.911) = -0.03 (fall) but u wrote 0.110. That affects the answer in calculation check which both must have same answer as 0.821
you have no idea how much this helped me. i dont know why it seemed so confusing when my lecturer was teaching it but i understood the first moment you explained it! thank you.
@@Sulimankhanacademy i got it in a question at my university and couldnt find anything on it, the question was "Why does the sum of rises equal the sum of falls in a closed levelling traverse?"
Now as you mentioned closed traverse So remember (Sum of fall - sum of rise =0) Turn sum of rise to other side then (Sum of fall = sum of rise) That means in order to close a traverse the sum of rise and fall must equal
Hi bro 😎 iam not understand 😔 this rise and fall method urs video see I perfectly understandable this rise and fall method 😎😎😎😎🙏🏻🙏🏻🙏🏻🙏🏻🙏🏻 thanks 😊 for completely speech
can u plz explain the how I take off for new road. it includes 7 cross sections on a particular chainage. chainage - 0+010. (LHS)15. 10. 5. 0. 5. 10. 15(RHS) and tell me also how I shift my instrument from 0+010 to 0+200. and after changing the instrument how do I start work again. and how I take backside and foreside coz there are 7 cross section.
In some situations the value of BS for point 1 and value of RL point 1 isn't given. What should we do then?? Ty for the video, it's ez to understand this way rather just looking at books.
I really appreciate the kindness you have man, thanks for sharing!
most welcome dear
Learn here more
This is so helpful. Thank you so much. We are having end semester exams with out even having any classes. In this situation this is really helpful. 💐
Glad it was helpful!
It is dear.See here more
Hii
GD morning
🌹
I thought this was difficult, but you made it real simple and beautiful.....................Thank you
welcome dear... enjoy
Sir your calculation one mistake in is -fs
1.881-1.911=0.030 noted in fall
Your explanation awesome sir I am big fan
thank you sir, you made my exam so easy
hey
welcome dear. thank you for joining us
Thanks for the video. Pls correct the calc error of no 8 & 9 (1.881 - 1.911) = -0.03 (fall) but u wrote 0.110.
That affects the answer in calculation check which both must have same answer as 0.821
Hey. Thank you. I know its typing mistake.
I also want to write it but I saw your comment....😊
U already introduce that right
Watch more here dear
Thank you sir ..your way of explaining things fluently is very good
most welcome dear.. enjoy
i wont even lie thank u helped me so much to prepare for a question in my exam at the middle of may
Thats great. Thank you for compliment
Walakumassalam
Assalamualaikum
Thank U Bhaijaan share this video
good explaination sir...easy and clear..thumbs up
Thank you for watching
Wooow very good
Explained beautifully
thank you dear. enjoy
simply great....such nice teaching helps to understand concept deeply....nic sir
thank you dear....... welcome
you have no idea how much this helped me. i dont know why it seemed so confusing when my lecturer was teaching it but i understood the first moment you explained it! thank you.
Enjoy dear ❤️
You are very Good Teacher bro keep it up ..
Thank you dear
U just saved me! Thanks a lot
Good
Thank you sir for your good explanation 👍👍👏👏
Most welcome dear
Very helpful! Thanks.
Glad it was helpful!
Wow great 👍😊,,, i really i understood everything
Thank you for compliment
Thank you sir you just explained it so nicely......
Welcome dear
Good helpful video sir
Enjoy dear ❤️❤️
Superb sir ji
This is very detailed and help a lot!
thank you
This video is amazing. Thank you. I’m only watched 2 and a half minutes and i get it. It’s simple, and you made it so. Thank you
Most welcome dear ❤️
It is dear
Thanqq sooooo much i understood very well after seeing ur video
MAY GOD BLESS U
most welcome bro.... also read 1st comment for more details
thank you sir, please do more videos on civil engineering
be in touch dear.
Great video. Thank you
Welcome to my channel
THANK U SIR FOR TO EXPLAIN NEATLY THIS PROBLEM
welcome dear
Der mehrabani sir g
Thank you so much sir it's very useful to me bcz I handle this survey for my students this video cleared my all doubt once again thank you sir
most welcome dear
Very nice
Expertise your knowledge of engineering here!
thank you for watching
Superb
Wonderful🎓you contributed more to my engineering surveying based skills
Thank you infinite
Thanks for sharing! May I ask how to calculate difference in elevation between two points?
Thank you for watching. Yes just watch bench mark shifting video in this channel
May Allah grant u jannah brother
ameen.. thank you
nicevideo
Enjoy dear
you are a legend man thank you!
You too.... thank you dear
Wa alaikum Salam thank U bro😊
🥰😍
Great sir g ,plz upload more videos
thank you for watching.. stay here soon i will bring videos
this was so helpful.. thanx a lot
Glad it was helpful!
thank you sir and please a video on estimation and shuttering quantity
good job sir
thank you dear
Awesome ✌️
thanks
very simply explain Sir 🙏🙏🙏
thank you for joining us... enjoy dear
Well presentation
thank you dear
VERY HELPFUL VIDEO.
THANKS
you are strongly welcome
Very helpful reconsidering the last fall it's a mistake.
It should be 0.030
Yes you are right. This problem is listed in video description
2nd calculation check is also wrong, i think....
-.901 is not =.901
Beautifully explained
thank you dear
Thanks for explaining the calculations. However, I noticed you have a mistake on the Fall last value. It should be 0.030 not 0.110.
Thank you for compliment. Yes this matter is been answered in first comment
I have adopted the lot of knowledge
happy to see your comment
SL Khan Sir ek aur video release karo naa missing table
thank you...it helps me a lot
welcome dear... search this channel in detail you will find more interesting videos
Holy shit man youre a legend, you made it so simple
Enjoy dear
@@Sulimankhanacademy i was just wondering why does the sum of rises equal the sum of falls?
Who said that?
@@Sulimankhanacademy i got it in a question at my university and couldnt find anything on it, the question was "Why does the sum of rises equal the sum of falls in a closed levelling traverse?"
Now as you mentioned closed traverse
So remember
(Sum of fall - sum of rise =0)
Turn sum of rise to other side then
(Sum of fall = sum of rise)
That means in order to close a traverse the sum of rise and fall must equal
Thanks I'm ready for Geomatics test Tomorrow
Good luck
SIR ,THANK YOU.NOQ I UNDERSTAND ALL THINGS ABOUT LAND SURVEY :D
Welcome dear
Thank you sir.. Its helps me lot..
welcome dear... and thank you for subscribe
Thank you soo much for very good explanation. :-))))
Welcome dear
Thank you... You have really helped me
welcome dear.. thank you for like and share
Hello from Malaysia. My lecturer told me to watch this video as reference. Hahahah. Stay at home😂
OMG, thats great . Stayhome 😍😍
Watch more here to learn
The last calculation: I.S-F.S is not -0.110. The correct value is: 1.881-1.911=-0.030
Check video time: 3:28
yes dear thank you. thats typing mistake other wise the process is ok....
check the video description i have mentioned this error
Nice...Thanks sir
most welcome dear
Nice video
thanks
Sir you are great
most welcome dear
Thats great.... please make a a video on stress strain curve
thats simple i will try soon..
make it soon
Awesome 👍
Welcome dear and enjoy
Thanks u sir we can understand easily
most welcome dear
Nyc
thank you dear
Thanks 👍
Welcome dear
Thanks very much.
most welcome dear/ enjoy
Bro what is 0.901 @7:30. Is it final road level???
Superb explanation
thank you dear... enjoy
Super thank you very much
most welcome dear
Nice
supper class
Thank you so much
could you please make a video about inverted staff readings
Very helpful video
yes dear sure
Thanks..great
welcome dear,,,,,,,,,,,,,,,, enjoy
Nice sir
Thank you very much sir.
welcome dear
many many many thanks
many many welcome
awesome
Hi bro 😎 iam not understand 😔 this rise and fall method urs video see I perfectly understandable this rise and fall method 😎😎😎😎🙏🏻🙏🏻🙏🏻🙏🏻🙏🏻 thanks 😊 for completely speech
Happy it helped you ❤️❤️
thanks sir
welcome dear....
Thank God there were subtitles
Enjoy dear ❤️
can u plz explain the how I take off for new road.
it includes 7 cross sections on a particular chainage.
chainage - 0+010.
(LHS)15. 10. 5. 0. 5. 10. 15(RHS)
and tell me also how I shift my instrument from 0+010 to 0+200.
and after changing the instrument how do I start work again.
and how I take backside and foreside coz there are 7 cross section.
Watch here more
Thank you so much sir
most welcome dear
Well video tanx bro
most welcome
thank so much
enjoy dear........
Beautiful sir
thanks Sir 👌👌
Sir how to prepare a spreadsheet of rise and fall methods showing calculations by using formula plz update vit sir tomorrow
See here
Last RL apny galt lia ha 0.110 ki jaga 0.030 ata ha
Yes, explained in 1st comment
Thanks man u helped me
thank you
welcome dear
Thank you so much!
welcome dear... thank you for joining us.
It has mistake on calculation check.the check should be last RL -first RL but video is effective thanku sir.
your are right and i am also right..... thats not the mistake
thank you for subsribe
Tqs it’s easy method
thanks for ur lecture keep it up
welcome dear. enjoy
In some situations the value of BS for point 1 and value of RL point 1 isn't given.
What should we do then??
Ty for the video, it's ez to understand this way rather just looking at books.
There are different types of benchmarks. You can assume value for point 1 , which is then known by temporary benchmark
Thanks so much