Розмір відео: 1280 X 720853 X 480640 X 360
Показувати елементи керування програвачем
Автоматичне відтворення
Автоповтор
It’s almost ready for L Taraval I can’t wait
It’s still back we can take that L Taraval
ur not taking that until September or October
@@SanPabloTransit What will happen to L Taraval Special when they close for 8 days?
@@valeman3 it will run from West Portal to SF Zoo then
@SanPabloTransit No, it'll run from SF Zoo to Church Station. Also I think they won't use LBus Special sign/announcement, instead it'll be normal LBus
i think they in the next stage of testing L TARAVAL for next week. Training the Operators
WITH ME
Does the operator have to exit the train and physically switch the track with a metal rod or a similar object?
@@evanstonbalce9588 yep!
Why is there a turn into 35th? Is it a turnaround point or a new stop?
@@andreistolyarov323 nah it’s just gonna be a backup track, this also existed before the entire construction project started
@@sfmunioperations Ohh, like the one on the N line in a similar place.
@@andreistolyarov323 yes at 30th Ave!
It’s almost ready for L Taraval I can’t wait
It’s still back we can take that L Taraval
ur not taking that until September or October
@@SanPabloTransit What will happen to L Taraval Special when they close for 8 days?
@@valeman3 it will run from West Portal to SF Zoo then
@SanPabloTransit No, it'll run from SF Zoo to Church Station. Also I think they won't use LBus Special sign/announcement, instead it'll be normal LBus
i think they in the next stage of testing L TARAVAL for next week. Training the Operators
WITH ME
Does the operator have to exit the train and physically switch the track with a metal rod or a similar object?
@@evanstonbalce9588 yep!
Why is there a turn into 35th? Is it a turnaround point or a new stop?
@@andreistolyarov323 nah it’s just gonna be a backup track, this also existed before the entire construction project started
@@sfmunioperations Ohh, like the one on the N line in a similar place.
@@andreistolyarov323 yes at 30th Ave!