Terrible Footing Construction Was Not Even Below Frost Line!!!

Поділитися
Вставка
  • Опубліковано 18 жов 2024

КОМЕНТАРІ • 11

  • @hg2.
    @hg2. 2 роки тому +1

    Thank you for making and sharing.
    Minnesota --> Frostline --> 4'. Got it.

  • @retromeatball4402
    @retromeatball4402 3 роки тому +3

    man that sucks..here in California you just kick the ground ans that's already the frost line haha

  • @tompeters4234
    @tompeters4234 6 років тому +7

    I hate having to redo what should have been done right in the fist place. Are you going to confront the contractor with this for some reimbursement ?

    • @BenjaminSahlstrom
      @BenjaminSahlstrom  6 років тому +4

      Yeah that's tough. I don't think I'll bother them about it. Sometimes its not worth souring relations over little things although this was a lot of work to fix. This is one reason I prefer to do things myself whenever possible.

    • @GrimDMasterMind
      @GrimDMasterMind 4 роки тому +6

      @@BenjaminSahlstrom Some relations should be soured. They didn't care enough to do it right, so I would advise against using them again.

    • @1cooltreeguy
      @1cooltreeguy 3 роки тому +3

      Ben. How deep below the frost line do you have to go? ie…if frontline is 24” ….do you have to go 48” or? Thx

  • @akhunter5184
    @akhunter5184 4 роки тому +2

    Backhoes can’t dig holes?