Lean Construction Scheduling Using Last Planner® System to better control projects

Поділитися
Вставка
  • Опубліковано 20 гру 2024

КОМЕНТАРІ • 7

  • @cirilloz
    @cirilloz 3 роки тому

    Thanks for uploading. Gave me a much better understanding of the process.

    • @TomStephensontraining
      @TomStephensontraining  3 роки тому +1

      Great glad it helped, yes I believe there are great opportunities for the construction industry to improve utilizing Lean

  • @TomStephensontraining
    @TomStephensontraining  3 роки тому

    Thanks Jacob R. for your comments, for some reason I can’t respond directly, i now updated the lean links in the description. Good idea about a project run through, when i get time ill look into it, thanks for the feedback!!!!

  • @pradiptanugraha6841
    @pradiptanugraha6841 Рік тому

    Hi, do you have a video showing how to update LPS board/schedule into takt plan schedule?
    Like the schedule transition from using Ms.Project and then changed into takt ?

    • @TomStephensontraining
      @TomStephensontraining  Рік тому

      Not yet but I’m pondering the best way to display the transition. Check out Janson schroeders youtube and linkedin lots on takt but no likely the MS Project connections. He has great content though on that topic and others.

  • @xTheEAKx
    @xTheEAKx 3 роки тому

    thank you, helped a lot.