I always believe sharing knowledge has greater emphasis than serving a meal or donating some money. Because this knowledge can help a person earn his own bread for the rest of his life. I hope the nature will give you back in 100X positive for the service you're doing🤝👏
Risk based inspection is the process of developing a scheme of inspection based on knowledge of the risk of failure. The essential process is a risk analysis. This is the combination of an assessment of the likelihood (probability) of failure due to flaws damage, deterioration or degradation with an assessment of the consequences of such failure. But , Fitness-For-Service (FFS) assessment procedures provide standardised routes to assess the residual properties of an in-service structure in order to aid decisions regarding whether continued operation is acceptable, or whether repair or replacement is needed. So, all option is incorrect.
@@Samir-Saad noted with thanks, excellent clarification, your videos are really of the highest quality, an excellent degree of professionalism, I have seen and liked each of the videos of ASME VIII, API-572 and API-510. I congratulate you, thank you for your contribution
جزاك الله خيرا دكتور سمير على ماتقدمه من خدمات للمفتشين
وجزاكم اخي الكريم ❤💐❤
Mr. Samir Saad, I passed the 510 exam last month. This lecture series was of great assistance. My sincerest thanks. Good luck to all others.
Thanks for wishing us good luck
You are welcome brother ❤️
Me too ❤️
Congrats bro , Bro I want your mob no , please give your mob no , i want your guidance
I always believe sharing knowledge has greater emphasis than serving a meal or donating some money. Because this knowledge can help a person earn his own bread for the rest of his life. I hope the nature will give you back in 100X positive for the service you're doing🤝👏
Thanks a lot brother ❤️💕
Jazak Allah khair
Thanks ❤️
Superb presentation.... Thank you very much...
You are welcome 🙏❤
Thanks, Sir for your valuable Guidance
You are welcome brother ❤ 🙏
Thanq so much for your videos sir . I so much debt for youu
You are welcome brother ❤️
ربنا يكرمك يا دكتور ...كل الحب و التقدير من الجزائر
اللهم آمين 🌺🌷كل الحب والتقدير والاحترام لأهل الجزائر ❤🌺🌷
Thank you so much for your support and guidance sir 💓💓💓💓
You are welcome ❤️
تشكر يا دكتور كلك ذوق و ربنا يبارك فيك .
اللهم آمين 🌷🌺العفو يا جميل ❤
Thank you sir for guidance..
You are welcome 🌺❤🌹
Thanks Sir
You are welcome 🌺🌷❤
Dr do you have pdf material for this series?
مساء الخير استاذ , جهد مشكور جزيت عليه خيرا , بس لو سمحت وين ممكن احصل السلايدز لكل السلسلة؟
مساء الخيرات يا جميل. تسلم. السلايدز ما رافعتها لحد الآن لأي سلسلة ❤️
tqvm.
💐
So, how to deeply and fully understand this code
💐💐🌺🙏
I just wonder If I watch all this videos? Can I apply API510 Test? I don't have any knowledge about API510.
Yes ,you can. If you need any help and support, please communicate with me through WhatsApp 00966540787077
Question 12 is very confused,’ the proper answer is C in accordance with the question recognized RBI must be c, otherwise is try to confuse
Risk based inspection is the process of developing a scheme of inspection based on knowledge of the risk of failure. The essential process is a risk analysis. This is the combination of an assessment of the likelihood (probability) of failure due to flaws damage, deterioration or degradation with an assessment of the consequences of such failure.
But , Fitness-For-Service (FFS) assessment procedures provide standardised routes to assess the residual properties of an in-service structure in order to aid decisions regarding whether continued operation is acceptable, or whether repair or replacement is needed.
So, all option is incorrect.
@@Samir-Saad noted with thanks, excellent clarification, your videos are really of the highest quality, an excellent degree of professionalism, I have seen and liked each of the videos of ASME VIII, API-572 and API-510. I congratulate you, thank you for your contribution
You are welcome ❤
from where i ll get this notes in pdf format??
Sorroy, Not available
Q- 11 can you explain