If our rig was ever that dirty we'd be working a double to clean that mess....that's what a greenhorn is for....to be a gopher and keep the place clean
Hahaha! That is India, the higher ups pocket all the money and engage illiterate labour like that guy with no Safety equipments and HELMET. However the show goes on. Thanks.
I'll tell you this much it's nice to see some roughnecks taking their time on making this connection cousin Texas they would run you off for making a connection so slow you guys got to tighten up your crew look at the rig floor look at all the grime and muck take some pride in your work hands
Reminds me of Poppin New Guinea where we couldn’t get the floor hands to wear their boots. They work the floor barefoot but their feet would like half-inch leather
Muricsns Hootin and hollering , chest bumping each other throwing chains thinking their gods these fellas casually slinging a rope still getting it done 😂😂😂
Nah, the 'one man show' is a clown. Working like a dog to line the pockets of the fossil fuel execs. These lads here are like, 'ok, we'll connect your pipe, but we're doing it at our speed. It takes as long as it takes'. Sensible chaps.
One roughneck disappeared for few minutes while making connections then one showed up besides the driller i suppose he is the pusher then the roughneck showed up again. Whats missing in both of them? This is India.
Mark Griffiths why if half the effort gets the job done who gives a fuck , who u trying to impress , the term busy fool springs to mind when I see people rushing doing tryin to save 20 seconds makes me laugh ,
@@keithy363 busy fools hey . Yeah I guess there a lot of go go go for nothing these days .. but there was reason why making connections was such a hurried event.. there are dangers in a static well..
@@keithy363 actualy floats are so put in string so you can make quick connections. Hence the hole for pressure readings. And bops are last line of defense. First line is proper hole fill and proper well conditioning which is quick connections reducing hole problems ie mud rings. Reducing static well time
These days buddy you can start roughnecking in your 50s easy. As long as you're able to carry about 50 lbs and climb steps. Most equipment is automated these days at all of your big drilling outfits. Patterson uti, precision drilling, nabors, h&p. Those guys have automated equipment. Running levers and scrubbing the rig. It's a good pay though.
Hahaha! The biggest joke is the audacity of the drilling contractor ONGC displaying the Logo ONGC with the slogan follow the SOP to avoid accidents and one the floor man wearing ordinary T shirt, no safety equipments and most importantly NO HELMET. This can happen only in India. Thanks.
Yeah I noticed that also he takes about 10 seconds spraying the box to get it nice and pretty and free of mud to just say fuck it when it comes to dope
Got to be in Pakistan orBangladeshi or some other country not bothered by the EPA DEQ OSHA PETA SIERRA and they really want to pay a lot of overtime and overhead and all workers must bring own food and tents and hashish
What in the flinstone fuck...these clowns have a rope for the slips. Wow. This shit is gold 👌
If our rig was ever that dirty we'd be working a double to clean that mess....that's what a greenhorn is for....to be a gopher and keep the place clean
That's awesome! Cathead rope like its 1945. Hell yeah boys get it!!!
Would you trust these guys with a spinning chain? Moe, Larry and Shemp.
@@rogermcmahon1219lol
Hahaha! That is India, the higher ups pocket all the money and engage illiterate labour like that guy with no Safety equipments and HELMET.
However the show goes on.
Thanks.
I pity these guys. So much lack of everything... and maybe they only get 50$ a month for this job.
Every driller I worked for would have shot us if we had taken half that long.
Fuckin right they would of but still cool to see a rope being used as spinning chain
Yeah, they look pretty wormy
And where in the hell did they get a spinning rope 🤣
Same shit here. I was getting irritated by how slow they moved.
@@rodriga1985 bunch of worms
This is why America is the best..our Roughnecks do it faster, more efficiently, and more accurately.
I'll tell you this much it's nice to see some roughnecks taking their time on making this connection cousin Texas they would run you off for making a connection so slow you guys got to tighten up your crew look at the rig floor look at all the grime and muck take some pride in your work hands
Floorhand rederic
The only thing amazing in this video is that they are wearing boots instead of sandals.
Good to see 2 Pac is alive and well
Hahaha 😂😂😂
Smh silly shit
Kudos...Great team
Reminds me of Poppin New Guinea
where we couldn’t get the floor hands to wear their boots. They work the floor barefoot but their feet would like half-inch leather
Is he working behind a margarita bar ?
Lmao
Stone age working scenario and very much nasty D/F!! Safety remain on the hands of almighty still they are working !! God bless them 🙏
Feels good to see our ( Janki Oil Tool’s , Jodhpur ) equipment running there on the rigs .. ❤
Useless tools
We're they trying to set a record for the slowest connection?
Trying not to die if anything?
The answer is yes..... we'd have 3 joints already down the hole
Hard hats save lifes bröther wear one
Elsewhere in the world he would get run-off along with his driller.
How old is this rig? That seems like a lot of movement for one connection.
Rope? Wow
ok..but WHY ISN'T TUPAC WEARING A HARD HAT?
I’m guessing that’s the construction guy from the YMCA band
Snub lined made with clamps spinning rope how old is this
Muricsns Hootin and hollering , chest bumping each other throwing chains thinking their gods these fellas casually slinging a rope still getting it done 😂😂😂
American Rig hands would make these guys look like worms!
And by the looks of it the machinery they have to work with is much older too.
Just watched a one man show do it all by himself...in better time...he puts these clowns to shame...lol
Yea but that AMERICAN guy has a salary double than all these guys at the same time
@@bogdanenea360for a reason
Nah, the 'one man show' is a clown. Working like a dog to line the pockets of the fossil fuel execs. These lads here are like, 'ok, we'll connect your pipe, but we're doing it at our speed. It takes as long as it takes'. Sensible chaps.
That was stressful to watch
Do AEE also do the same work
Como es que se llama esa llave
No safety. No regs. Long live india
interesting. this would never fly in the middle East, or Texas. but those boys in Qatar and Bahrain are about their money.
Falling asleep watching that
Grandma was slow but she was old!
Work Goood!!!
Where is this location
One roughneck disappeared for few minutes while making connections then one showed up besides the driller i suppose he is the pusher then the roughneck showed up again. Whats missing in both of them? This is India.
Wasn't he the guy operating the cathead for the "chain?" That was painful to watch.
My goodness put out
Mark Griffiths why if half the effort gets the job done who gives a fuck , who u trying to impress , the term busy fool springs to mind when I see people rushing doing tryin to save 20 seconds makes me laugh ,
@@keithy363 busy fools hey . Yeah I guess there a lot of go go go for nothing these days .. but there was reason why making connections was such a hurried event.. there are dangers in a static well..
Mark Griffiths that’s why u have well control (fluid and floats in your string if known problems) plus bop’s
@@keithy363 actualy floats are so put in string so you can make quick connections. Hence the hole for pressure readings. And bops are last line of defense. First line is proper hole fill and proper well conditioning which is quick connections reducing hole problems ie mud rings. Reducing static well time
keithy that 20 seconds could mean being able to continue drilling or getting stuck in the hole.
What’s the oldest that a strong able bodied man can be to do this job?
Even the coveralls and hard hats are tooty fruity 🇺🇸
82
These days buddy you can start roughnecking in your 50s easy. As long as you're able to carry about 50 lbs and climb steps. Most equipment is automated these days at all of your big drilling outfits. Patterson uti, precision drilling, nabors, h&p. Those guys have automated equipment. Running levers and scrubbing the rig. It's a good pay though.
@@hekpgn interesting. Thanks! Don't sound like roughnecking anymore over there eh? lol
@@kennypeshlakai2416that’s what I was thinking straight (actually probably not) YMCA crew lol
Good job abhi
Damn that was a slow connection.
Good safe connection.
Так квадрат разве можно отворачивать? У нас это до первой проверки и тю тю бурильщик- прямиком в помбцры...
Rope was before my time.
Remember for safety first Broww
Right sir
Hi bro plz rig name
I Would fire half the floor hands, all the driller did was wait on his hands
Rope as spinning chain? Jesus
What no spinning chain!!
Moi humabo prem ni ...
Hahaha!
The biggest joke is the audacity of the drilling contractor ONGC displaying the Logo ONGC with the slogan follow the SOP to avoid accidents and one the floor man wearing ordinary T shirt, no safety equipments and most importantly NO HELMET.
This can happen only in India.
Thanks.
With about two table spoons of pipe dope for 22000 lbs of tork? 😧Where is the tool pusher, is he paying for the dope?
Yeah I noticed that also he takes about 10 seconds spraying the box to get it nice and pretty and free of mud to just say fuck it when it comes to dope
😂😂😂😂They all scared
Got to be in Pakistan orBangladeshi or some other country not bothered by the EPA DEQ OSHA PETA SIERRA and they really want to pay a lot of overtime and overhead and all workers must bring own food and tents and hashish
My Lord they sure are very slow.
They .ust be worms😅
Fucking Ooga Booga
Kisi bhi Sir ke pass PDF ho too bejo plz plz sir rig ke bare me
सेफ्टी फस्ट .....हेलमेट नही पहेना
WTF is this country I have seen one hand and a driller make connections faster than this
Отбивать ротором вообще нельзя
They talk more than they work
where is the fucking safety man ????
This is some slow workers and I would have used the chain instead of the old rope. Either way you guys are slow as hell....
Our boys would eat these guys alive.
This kind of rig need to junk this is old way