SAP Work Center Classification | What is work center classification | SAP Demo | Easy to understand

Поділитися
Вставка
  • Опубліковано 24 січ 2025

КОМЕНТАРІ • 41

  • @msreddy41
    @msreddy41 3 роки тому +4

    Mate, very detailed explanation with easy to understand illustration. Your channel is absolutely a guide for SAP PP consultants and others who are after cross functional knowledge. Keep rocking… 👍

    • @SAPwithIK
      @SAPwithIK  3 роки тому +1

      Thank you..this is really motivating.

  • @shivans3204
    @shivans3204 3 роки тому +2

    Nice explanation sir 👍👍🙏

  • @sambasivareddy1392
    @sambasivareddy1392 2 роки тому

    Thanks for the detailed explanation. very useful video.

  • @sujathainturu5304
    @sujathainturu5304 3 роки тому +1

    Nice explanation 👌👌

  • @akshaykulkarni069
    @akshaykulkarni069 3 роки тому +2

    Nice explaination sir 👌👌👌
    Please do more videos on Process industry sir

    • @SAPwithIK
      @SAPwithIK  3 роки тому

      Sure..will do. Thank you 😊

  • @naveen318
    @naveen318 Рік тому +1

    Very Helpful video , is the above process same for discreet industry ?

    • @SAPwithIK
      @SAPwithIK  Рік тому

      Appreciate your feedback. This is not available for discrete.

  • @mahendran8888
    @mahendran8888 3 роки тому

    We can change the workcenter in capacity dispatch also right

    • @SAPwithIK
      @SAPwithIK  3 роки тому +1

      Yes, we can which is part of capacity levelling and orders dispatch.

    • @mahendran8888
      @mahendran8888 3 роки тому +1

      @@SAPwithIK appreciating all your videos, good stuffs, I am also SAP PP QM VC consultant thanks for all your videos.

    • @SAPwithIK
      @SAPwithIK  3 роки тому

      Thanks for your encouragement..glad you liked them. Nice talking to you.

  • @nikhils06
    @nikhils06 Рік тому

    Hi Ik, thanks for explaining so nicely. How would this work with Production order? Because we don’t have resource selection criteria in CA02.

    • @SAPwithIK
      @SAPwithIK  Рік тому +1

      That’s correct. Work centre classification is not available in production orders. Instead, you may define alternative sequence in the routing with all available work centres.

    • @nikhils06
      @nikhils06 Рік тому

      Thanks for the reply

  • @1964SUNDAR
    @1964SUNDAR Рік тому

    Nice explanation. Pls share the details for control key selection process

  • @umapathy3143
    @umapathy3143 2 роки тому

    Nice vedio, Please share end to end process for MPS

  • @shubhankarmandal8332
    @shubhankarmandal8332 2 роки тому

    Very good explanation! Please continue posting new video. It is going to help all PP/QM expert. Quick question for this topic - can we skip plant as characteristic or why plant characteristics is needed? Because at the end we need to assign it to master recipe which is plant dependent.

    • @SAPwithIK
      @SAPwithIK  2 роки тому +1

      Thanks for watching. I’ve included the plant as a characteristic in case of a scenario where the same work center exists in two different plants. However it depends on the scenario where the work centre is unique.

    • @shubhankarmandal8332
      @shubhankarmandal8332 2 роки тому

      @@SAPwithIK Thanks for your reply. if we have same work center name in different plants then without plant as characteristics will not work. Interestingly in CL24N in the assignment we need to provide plant and work center although Plant as characteristics is not added to the class. Please consider to create another video to explain the APO part of resource classification. how this functionality works with APO. thanks a lot.

    • @naveenreddymuppana1
      @naveenreddymuppana1 6 місяців тому

      In the same scenario, can we control the system to choose the work center automatically on quantity based? If we can do then no need of multiple task lists

    • @SAPwithIK
      @SAPwithIK  6 місяців тому

      @naveenreddymuppana1 auto selection of work centre is not feasible in standard. You should go with multiple production versions with various combinations of WC in Tasklist.

  • @nikhildhivare4409
    @nikhildhivare4409 3 роки тому +2

    Please make video on trigger point

  • @nileshbansod4646
    @nileshbansod4646 2 роки тому

    Nice video

  • @umapathy3143
    @umapathy3143 2 роки тому

    Please confirm in serial number profile managed material production (or) process order goods issue happen only through MIGO, or we can do through CO11 & CO11N. Please confirm

    • @SAPwithIK
      @SAPwithIK  2 роки тому

      Serialised materials can’t be consumed in CO11n. You will have to use MIGO.

    • @umapathy3143
      @umapathy3143 2 роки тому

      @@SAPwithIK for both goods issue and goods receipt correct

    • @umapathy3143
      @umapathy3143 2 роки тому

      @@SAPwithIK recently I saw your vedio it is well explained, keep continue. Please post the vedio for material quantity calculation concept and trigger point and MPS

    • @SAPwithIK
      @SAPwithIK  2 роки тому

      Correct

    • @umapathy3143
      @umapathy3143 2 роки тому

      @@SAPwithIK Hi, I need some clarification for some topics.
      1. Please post a vedio for different type of BOM.
      2.What is the use of MRP-Area level planning.
      3.Which condition PI sheet need to be used.
      4.In Production process PI sheet to be used or not.
      4.

  • @ravivarma899
    @ravivarma899 6 місяців тому

    how to execute same thing in production order (discrete industry ), please tell me

    • @SAPwithIK
      @SAPwithIK  6 місяців тому

      This is not available for discrete manf.

    • @vallepumahesh9335
      @vallepumahesh9335 3 місяці тому

      Alternative option for this in discrete manufacturing?

    • @SAPwithIK
      @SAPwithIK  3 місяці тому

      You can use work center selection through alternative sequence

    • @vallepumahesh9335
      @vallepumahesh9335 3 місяці тому

      Is it possible to make a video(short)on this for detailed understanding...

  • @dhirajdua3071
    @dhirajdua3071 2 роки тому

    Good lecture...I think the concept of resource network and resource classification has been mixed here.

  • @nikhildhivare4409
    @nikhildhivare4409 3 роки тому

    please make on video on trigger point