Clearing land for a cabin and cutting in a driveway

Поділитися
Вставка
  • Опубліковано 18 жов 2024
  • This is the first 2 days of this project, pushing in a driveway from the main road, connecting to an existing quad trail, going up to the building site and clearing about a half acre of trees to get it prepared for a cabin to be built. I also get to test out my new ripper to cut into some rock to widen the road and use the rock to make a good road base.

КОМЕНТАРІ • 148