Please enter the required details for your submission. We will review and provide feedback in the next video docs.google.com/forms/d/e/1FAIpQLSc5oa5dt01WvUuCiwjdeesMFeHAYzVJQxoBCFUF-jSn_mfzyQ/viewform ನಾನು ತಂತ್ರಜ್ಞಾನವನ್ನು ಮೂಲಭೂತ real estate ನೀತಿಗಳೊಂದಿಗೆ ಸಂಯೋಜಿಸಿದ ಚಾನಲ್ ಪ್ರಾರಂಭಿಸಿದ್ದೇನೆ. Support madi :) ನಂತರ subscribe madi ಮತ್ತು bell button click madi.
@@RupayiRaja Saw many commenting PRR2 is useless as nice road already exist.. But on a broader vision PRR 2 is important because: 1. It connects industrial areas of Anekal, E city extensions, kumbalgod(mysore road) , kachohalli(magadi road).. 2. Nice road is plagued with litigations since inception and govt has no control on any development.. 3. the land adjacent to nice road is owned by BMIC and KIADB.. it can be good for industrial hubs and PRR 2 can be suitable for commercial and residential hubs(50k planned layouts) 4. PRR 2 is not a recent idea. its part of RMP(revised master plan) and CMP(comprehensive mobility plan).. even metro is planned according to RMP.. 5. If 2nd airport is finalised at Nelamangala(extending till magadi road) PRR2 with some parts of magadi road till tavarekere will be alternate route to connect airport just like hennur-bagalur road.. 6. Circular rail project also planned parallel to PRR 2 and IRR 7. MAR 10.6km already 90% completed which is part of Kempegowda Layout(NPKL) and will be part of PRR 2 only.. 8. Overall good for job creation around the sub-urbs with good metro connectivity(hosur road yellow line, Banneghatta road pink line, Kanakpura road green line, Mysore road challaghatta station, Magadi Road phase 3 silver line kadabagere cross) and peaceful reasidential away from city hustle.. 9. Affordable sites with planned infastructure as compared to north(hebbal airport) and east bangalore(Whitefield) where city infra is unplanned and messed up..
Very informative, you are sincere in helping Bangalore people, I too don't like hilly areas, too much ups and downs. Please tell the developments of Sarjapur and nearby places, especially chikka tirupati area, Godrej and many big builders are making buildings and plots
Saw many commenting PRR2 is useless as nice road already exist.. But on a broader vision PRR 2 is important because: 1. It connects industrial areas of Anekal, E city extensions, kumbalgod(mysore road) , kachohalli(magadi road).. 2. Nice road is plagued with litigations since inception and govt has no control on any development.. 3. the land adjacent to nice road is owned by BMIC and KIADB.. it can be good for industrial hubs and PRR 2 can be suitable for commercial and residential hubs(50k planned layouts) 4. PRR 2 is not a recent idea. its part of RMP(revised master plan) and CMP(comprehensive mobility plan).. even metro is planned according to RMP.. 5. If 2nd airport is finalised at Nelamangala(extending till magadi road) PRR2 with some parts of magadi road till tavarekere will be alternate route to connect airport just like hennur-bagalur road.. 6. Circular rail project also planned parallel to PRR 2 and IRR 7. MAR 10.6km already 90% completed which is part of Kempegowda Layout(NPKL) and will be part of PRR 2 only.. 8. Overall good for job creation around the sub-urbs with good metro connectivity(hosur road yellow line, Banneghatta road pink line, Kanakpura road green line, Mysore road challaghatta station, Magadi Road phase 3 silver line kadabagere cross) and peaceful reasidential away from city hustle.. 9. Affordable sites with planned infastructure as compared to north(hebbal airport) and east bangalore(Whitefield) where city infra is unplanned and messed up..
KAR KONGRESS doesn't work GOOD. Instead does only plans. Planning and looting businesses and Won't do good implementation of any kind of projects 😒 Always Dy. CM is busy planning useless and unwanted Skydeck project and other infeasible projects like Tunnel roads and other useless project planning as listed out below, that too sitting in AC ROOMS. Many projects work are delayed like Widening of Herbal flyover, Millions of Potholes, Parking lots. Koramangala flyovers, Widening of Drainage, Build more water bodies and lakes, etc. This City is a Chaos City with all kinds of haphazard and hazardous ways of development and build 100s of different kinds of CRISIS. The Bengaluru was executed by Congress, since 60 years of haphazard Governance model. Land mafia, encroachment of Rajkaluve and drainage leads to flooding during rains . Water crisis n Flood crisis Public transport crisis i.e. No Suburban Railways network, since 60 years of govt in central govt. 🙄 Diminishing 2 thousands of Lakes and Parks. Haphazard development n World worst infrastructure in road infrastructure n Many millions of Corruption spoiling and killing the Bengaluru city. Road infrastructure has been completely chaos and messed up in the whole world by Congress party. Need of the hour is 1000s of circles needs Bridges or Subways instead they plans useless tunnels which will messy the traffic issues. Congress ideas are worse . They stopped the higher end infrastructure project like NICE ROAD PROJECT. They even stopped PERIPHERAL RING ROAD for 3 to 4 decades . This is mindset of theirs idea 💡 😳 All the projects of CONGRESS projects which are senseless and nonsense as follows: 1. FYI, Metro tunnel connect to entire city. So Tunnel roads are not conducive or not feasible for entire city. Tunnel road is not conducive to one main road as well. whereas entire city road infrastructure is worst of worst. 2. Tunnels roads are meant to use only a few for certain smaller distances and smaller areas . Still it is not feasible to the avoid traffic jams. 3. FYI, Metro Train's tunnel doesn't not create bottleneck in the corner. Unlike Road tunnels manifests choas and messy jams in the corner of the tunnel roads. Tunnel roads creates messy in the tunnel road corners. complete traffic jam in the Tunnel corners. 4. The most Foolish project Skydeck project is completely waste and most Useless project which will increases chaos in the Road and manifests messy jams and Traffic jams. 5. There is highest numbers of one ways roads which indicates the most messed up road infrastructure. 6. There are many more thousands of manifested issues without any feasibility study. One of the Best SOLUTION are: Need to develop new AIRPORT outside Bengaluru. Instead Development a new bangalore n 3 more ring road. Apart from exitsting Satilette rings road. Summary: All the plans of the Congress is manifested chaos in city. Water clogging during rains and highest number of encroachment of patks and lakes in the world. The Congress wants only old bangalore. Why new AIRPORT within Bangalore. the Congress plans to squeeze another 4+ crore population in this same old congested city of Bangalore. Utter nonsense n newsense of ideas of Congress New paper Deccan Herald reports that, the BBMP i.e. Corporation will spend Rs 9.45 crore on preparing the Detailed Project Report (DPR) for the tunnel project. In contrast, the cost of the DPR for Namma Metro is significantly lower. The Bangalore Metro Rail Corporation Ltd (BMRCL) spent just Rs 1.56 crore on preparing the DPR for the 37-km Sarjapur-Hebbal line, which was submitted in June this year.. Congress ideas are worse City without RING ROAD. 1. Electronic city without Ring road. 2. Bengaluru city without Ring road 3. Kwin city without Ring road . 4. In future, Any new city plans and development will be without Ring road. They stopped All RING ROAD PROJECTS. 1. NICE ROAD PROJECT. 2. Peripheral ring road. They even stopped peripheral ring road for 3 to 4 decades . Now the point on Tunnel roads. 1. Fyi Metro tunnel connect to entire city. 2. Whereas Tunnels roads are meant to use only a few for certain smaller areas . 3. Metro tunnel doesn't not create bottlenecks in the corner, unlike tunnels n tunnel roads, which creates bottlenecks. 4. there are many more issues of feasibility Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore. they will squeeze another 2+ crore population in this same old bangalore. uther nonsense n newsense.
2.Congress Ideas n City Plans are worse and chaotic City without COMPREHENSIVE TRANSPORTATION INFRASTRUCTURE like RING ROAD or COMPREHENSIVE TRANSPORTATION INFRASTRUCTURE PLANS. completely messing and completely chaotic citiy plans . For example in Bengaluru was messed up by Congress party since 60÷ years. Eg. 1. Electronic city without Ring road. Eg.2. Whitefield without Ring road. Eg.3. Bengaluru city without Ring road Eg.4. Kwin city without Ring road . Eg.5. In future, Any new city plans and development will be without Ring road. They stopped All the INFRASTRUCTURES PROJECTS. Most important RING ROAD PROJECTS. 1. NICE ROAD PROJECT. 2. Bangalore Mysore freeway. 3. Peripheral ring road. They even stopped peripheral ring road for 3 to 4 decades . All the Worse projects are only paperwork And slowest in the entire world 🌎. Currently, Now the point on Tunnel roads. 1. Fyi Metro tunnel connect to entire city and it is public transport system. 2. Whereas Tunnels roads are meant to use only a few for certain smaller areas . 3. Metro tunnel doesn't not create bottlenecks in the corner, unlike tunnels n tunnel roads, which creates bottlenecks. 4. there are many more issues of feasibility Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore. they will squeeze another 2+ crore population in this same old bangalore. Utter Nonsense n NEWSENSE THINKING and PLANS of Congress. . HEIGHTS of Arrogant Hegemonic agenda n Dictatorship Governance model with FAKE FREEBIES Policy and FAKE FREEBIES POLITICS. Cheapest double standards and lowest level of administration. Lowest level of looting POLITICS and Appeasement governance model. No rankings or no democracy to highly educated persons 🤔. Only CURRUPTION to the core level.
You are making amazing videos! 😊👍🏻 Please continue the same. Namma Kannadatigaru Olle Kade Investment maadle. Ella Andre Bere avaru bandu invest maadi hogathe. It will be too late for locals.
Very good information Sir, thanks for sharing the link of maps as well, need your support in confirming one of the survey no 78 located at Kommagatta, near Kengari whether, it is going to be acquire by BDA or de notified from BDA, pls share your thoughts on the same, as Kempaegowda layout is situated next this area.
Hi, Please share the details of toll plaza 10 details under PRR phase 2 covered survey nos and no of guntas. Because, I have seen the map released in BDA website on 6/4/2022. Requesting you provide more details of toll plaza 10. Our survey 8.1 of Bidere Agrahara.
KAR KONGRESS doesn't work GOOD. Instead does only plans. Planning and looting businesses and Won't do good implementation of any kind of projects 😒 Always Dy. CM is busy planning useless and unwanted Skydeck project and other infeasible projects like Tunnel roads and other useless project planning as listed out below, that too sitting in AC ROOMS. Many projects work are delayed like Widening of Herbal flyover, Millions of Potholes, Parking lots. Koramangala flyovers, Widening of Drainage, Build more water bodies and lakes, etc. This City is a Chaos City with all kinds of haphazard and hazardous ways of development and build 100s of different kinds of CRISIS. The Bengaluru was executed by Congress, since 60 years of haphazard Governance model. Land mafia, encroachment of Rajkaluve and drainage leads to flooding during rains . Water crisis n Flood crisis Public transport crisis i.e. No Suburban Railways network, since 60 years of govt in central govt. 🙄 Diminishing 2 thousands of Lakes and Parks. Haphazard development n World worst infrastructure in road infrastructure n Many millions of Corruption spoiling and killing the Bengaluru city. Road infrastructure has been completely chaos and messed up in the whole world by Congress party. Need of the hour is 1000s of circles needs Bridges or Subways instead they plans useless tunnels which will messy the traffic issues. Congress ideas are worse . They stopped the higher end infrastructure project like NICE ROAD PROJECT. They even stopped PERIPHERAL RING ROAD for 3 to 4 decades . This is mindset of theirs idea 💡 😳 All the projects of CONGRESS projects which are senseless and nonsense as follows: 1. FYI, Metro tunnel connect to entire city. So Tunnel roads are not conducive or not feasible for entire city. Tunnel road is not conducive to one main road as well. whereas entire city road infrastructure is worst of worst. 2. Tunnels roads are meant to use only a few for certain smaller distances and smaller areas . Still it is not feasible to the avoid traffic jams. 3. FYI, Metro Train's tunnel doesn't not create bottleneck in the corner. Unlike Road tunnels manifests choas and messy jams in the corner of the tunnel roads. Tunnel roads creates messy in the tunnel road corners. complete traffic jam in the Tunnel corners. 4. The most Foolish project Skydeck project is completely waste and most Useless project which will increases chaos in the Road and manifests messy jams and Traffic jams. 5. There is highest numbers of one ways roads which indicates the most messed up road infrastructure. 6. There are many more thousands of manifested issues without any feasibility study. One of the Best SOLUTION are: Need to develop new AIRPORT outside Bengaluru. Instead Development a new bangalore n 3 more ring road. Apart from exitsting Satilette rings road. Summary: All the plans of the Congress is manifested chaos in city. Water clogging during rains and highest number of encroachment of patks and lakes in the world. The Congress wants only old bangalore. Why new AIRPORT within Bangalore. the Congress plans to squeeze another 4+ crore population in this same old congested city of Bangalore. Utter nonsense n newsense of ideas of Congress New paper Deccan Herald reports that, the BBMP i.e. Corporation will spend Rs 9.45 crore on preparing the Detailed Project Report (DPR) for the tunnel project. In contrast, the cost of the DPR for Namma Metro is significantly lower. The Bangalore Metro Rail Corporation Ltd (BMRCL) spent just Rs 1.56 crore on preparing the DPR for the 37-km Sarjapur-Hebbal line, which was submitted in June this year.. Congress ideas are worse City without RING ROAD. 1. Electronic city without Ring road. 2. Bengaluru city without Ring road 3. Kwin city without Ring road . 4. In future, Any new city plans and development will be without Ring road. They stopped All RING ROAD PROJECTS. 1. NICE ROAD PROJECT. 2. Peripheral ring road. They even stopped peripheral ring road for 3 to 4 decades . Now the point on Tunnel roads. 1. Fyi Metro tunnel connect to entire city. 2. Whereas Tunnels roads are meant to use only a few for certain smaller areas . 3. Metro tunnel doesn't not create bottlenecks in the corner, unlike tunnels n tunnel roads, which creates bottlenecks. 4. there are many more issues of feasibility Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore. they will squeeze another 2+ crore population in this same old bangalore. uther nonsense n newsense.
2.Congress Ideas n City Plans are worse and chaotic City without COMPREHENSIVE TRANSPORTATION INFRASTRUCTURE like RING ROAD or COMPREHENSIVE TRANSPORTATION INFRASTRUCTURE PLANS. completely messing and completely chaotic citiy plans . For example in Bengaluru was messed up by Congress party since 60÷ years. Eg. 1. Electronic city without Ring road. Eg.2. Whitefield without Ring road. Eg.3. Bengaluru city without Ring road Eg.4. Kwin city without Ring road . Eg.5. In future, Any new city plans and development will be without Ring road. They stopped All the INFRASTRUCTURES PROJECTS. Most important RING ROAD PROJECTS. 1. NICE ROAD PROJECT. 2. Bangalore Mysore freeway. 3. Peripheral ring road. They even stopped peripheral ring road for 3 to 4 decades . All the Worse projects are only paperwork And slowest in the entire world 🌎. Currently, Now the point on Tunnel roads. 1. Fyi Metro tunnel connect to entire city and it is public transport system. 2. Whereas Tunnels roads are meant to use only a few for certain smaller areas . 3. Metro tunnel doesn't not create bottlenecks in the corner, unlike tunnels n tunnel roads, which creates bottlenecks. 4. there are many more issues of feasibility Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore. they will squeeze another 2+ crore population in this same old bangalore. Utter Nonsense n NEWSENSE THINKING and PLANS of Congress. . HEIGHTS of Arrogant Hegemonic agenda n Dictatorship Governance model with FAKE FREEBIES Policy and FAKE FREEBIES POLITICS. Cheapest double standards and lowest level of administration. Lowest level of looting POLITICS and Appeasement governance model. No rankings or no democracy to highly educated persons 🤔. Only CURRUPTION to the core level.
Sir Servey No 28 kanakpura road, Ashraya yojane Adi manegalu nirmana agidave , Can you tell will PRR road will effect on this servey number Asap reply kodi
Bro actually I need details of PRR-2 which starts from hebbagodi(husker gate) to bannerghatta toll , I need details of veerasandra survey no 75 land map.
Please enter the required details for your submission. We will review and provide feedback in the next video docs.google.com/forms/d/e/1FAIpQLSc5oa5dt01WvUuCiwjdeesMFeHAYzVJQxoBCFUF-jSn_mfzyQ/viewform?usp=sharing
Explain very well but I have one doubt about this video in Periprl 2 road will come on Machohalli also it will cross that village because there Metro work going and 3 km distance nice road there so again periprl rod coming or not @kindly answer on this question
Brother please explain PRR-2 in that kaggalipura Area like uttari and mainly banjarapalya and agara.. and also we have layout in banjarapalya in that we have one site.. there is a chance to loss that site...
Sir, Please suggest which area would be good to buy a land for house construction and How to go about getting the land from BDA the process that BDA follows for allotment
I have one site in SRY Layout.. I checked map 3.20(d) Bannerghatta.. any scope for BDA layouts nearby or price increase in SRY Layout(Mylasandra)?? Please reply
thanks a lot for your research sir. I am planning to buy a site in dodderi near big banyan tree and they claim that STRR is planned. Can you make a video on STRR please
If a family is living in the place where BDa site is coming. Then what will happen for the house where the family is living. Will it be acquired by government
@ I am not sure about project name. There is a kml file circulating. In that its mentioned Bangalore Ring rail as below. Benguluru Ring Rail ACAD-SWR Ring rail AOI But circular railways goes via Hilalige and Chandapur. Attibele is 10 km away from that. I am not sure why they are marking land.
Please enter the required details for your submission. We will review and provide feedback in the next video docs.google.com/forms/d/e/1FAIpQLSc5oa5dt01WvUuCiwjdeesMFeHAYzVJQxoBCFUF-jSn_mfzyQ/viewform?usp=sharing
Sir I have site near Agara village survey number :36/8 and 36 BM kaval village now they are saying KHB acquired for housing please give me correct information I took loan and bought it actually please help me sir
Please enter the required details for your submission. We will review and provide feedback in the next video docs.google.com/forms/d/e/1FAIpQLSc5oa5dt01WvUuCiwjdeesMFeHAYzVJQxoBCFUF-jSn_mfzyQ/viewform
ನಾನು ತಂತ್ರಜ್ಞಾನವನ್ನು ಮೂಲಭೂತ real estate ನೀತಿಗಳೊಂದಿಗೆ ಸಂಯೋಜಿಸಿದ ಚಾನಲ್ ಪ್ರಾರಂಭಿಸಿದ್ದೇನೆ.
Support madi :) ನಂತರ subscribe madi ಮತ್ತು bell button click madi.
Link not working
@@RupayiRaja Saw many commenting PRR2 is useless as nice road already exist.. But on a broader vision PRR 2 is important because:
1. It connects industrial areas of Anekal, E city extensions, kumbalgod(mysore road) , kachohalli(magadi road)..
2. Nice road is plagued with litigations since inception and govt has no control on any development..
3. the land adjacent to nice road is owned by BMIC and KIADB.. it can be good for industrial hubs and PRR 2 can be suitable for commercial and residential hubs(50k planned layouts)
4. PRR 2 is not a recent idea. its part of RMP(revised master plan) and CMP(comprehensive mobility plan).. even metro is planned according to RMP..
5. If 2nd airport is finalised at Nelamangala(extending till magadi road) PRR2 with some parts of magadi road till tavarekere will be alternate route to connect airport just like hennur-bagalur road..
6. Circular rail project also planned parallel to PRR 2 and IRR
7. MAR 10.6km already 90% completed which is part of Kempegowda Layout(NPKL) and will be part of PRR 2 only..
8. Overall good for job creation around the sub-urbs with good metro connectivity(hosur road yellow line, Banneghatta road pink line, Kanakpura road green line, Mysore road challaghatta station, Magadi Road phase 3 silver line kadabagere cross) and peaceful reasidential away from city hustle..
9. Affordable sites with planned infastructure as compared to north(hebbal airport) and east bangalore(Whitefield) where city infra is unplanned and messed up..
Please check now , i wil give feedback this weekend
Awesome Content 👍
Kannadigas plz explore our own resources. Don't let others exploit our land.
Okay saar 🙌
ಕನ್ನಡದಲ್ಲಿ ಅರ್ಥ ಪೂರ್ಣ ಮಾಹಿತಿ ನೀಡಿದ್ದೀರಿ ಧನ್ಯವಾದಗಳು ಸರ್ ❤❤
ಥ್ಯಾಂಕ್ ಯು ಬ್ರೋ ಕನ್ನಡದಲ್ಲಿ ಮಾಹಿತಿ ನೀಡಿದ್ದಕ್ಕೆ ಧನ್ಯವಾದಗಳು
ತುಂಬಾ ಚೆನ್ನಾಗಿ ವಿವರಿಸಿದ್ದೀರಿ. Peripheral ring road 1 ವೀಡಿಯೋಗೋಸ್ಕರ ಕಾಯುತ್ತ ಇದೀವಿ.
Very informative video. All the best for your UA-cam channel 😊
Nicely Explained sir, Good information to all who wanted to buy new sites in Bangalore South
Thanks a lot
Good work Rupayi sir, consistent aagi videos upload madi.
17:31 ಖಂಡಿತ ನಮ್ಮ ಸಪೋರ್ಟ್ ಇದೆ ಬ್ರದರ್ 🎉🎉🎉
or any details of Vasudevapura which is in kagglipura. Need info weather BDA is aquisition.
ಒಳ್ಳೆದಾಗಲಿ ಬ್ರದರ್ ♥️
ನಮ್ದು ರೆವೆನ್ಯೂ ಸೈಟು ಹೋಗ್ತಾ ಇದೆ
❤❤ ಸುಪ್ಪರ್ ಬ್ರೋ..
Good work sir,
Can you please share 3.01 map(d)- Kengeri.
We have a site near kambipura, wanted to check if it will get into BDA land aquisition
Very helpful bro..appreciate your efforts..do for STRR phase 2 also in coming days
i have details i will share
Very informative, you are sincere in helping Bangalore people, I too don't like hilly areas, too much ups and downs. Please tell the developments of Sarjapur and nearby places, especially chikka tirupati area, Godrej and many big builders are making buildings and plots
So nice of you , thanks for comment , i will try to explain my best
Saw many commenting PRR2 is useless as nice road already exist.. But on a broader vision PRR 2 is important because:
1. It connects industrial areas of Anekal, E city extensions, kumbalgod(mysore road) , kachohalli(magadi road)..
2. Nice road is plagued with litigations since inception and govt has no control on any development..
3. the land adjacent to nice road is owned by BMIC and KIADB.. it can be good for industrial hubs and PRR 2 can be suitable for commercial and residential hubs(50k planned layouts)
4. PRR 2 is not a recent idea. its part of RMP(revised master plan) and CMP(comprehensive mobility plan).. even metro is planned according to RMP..
5. If 2nd airport is finalised at Nelamangala(extending till magadi road) PRR2 with some parts of magadi road till tavarekere will be alternate route to connect airport just like hennur-bagalur road..
6. Circular rail project also planned parallel to PRR 2 and IRR
7. MAR 10.6km already 90% completed which is part of Kempegowda Layout(NPKL) and will be part of PRR 2 only..
8. Overall good for job creation around the sub-urbs with good metro connectivity(hosur road yellow line, Banneghatta road pink line, Kanakpura road green line, Mysore road challaghatta station, Magadi Road phase 3 silver line kadabagere cross) and peaceful reasidential away from city hustle..
9. Affordable sites with planned infastructure as compared to north(hebbal airport) and east bangalore(Whitefield) where city infra is unplanned and messed up..
@@yathichandra noted, upcoming video i will highlight this
Please make a separate video to explain how you are doing Overlay of Master plan and Google Earth.
Already nice road ede thane ,sumne connect mado badlu ,extra road yakke. Prr 1 still haven't started lamd acquisition only which was planned 2008
Bangalore developement have forgotten to construct flyovers , many projects pending from 2-8 years ,fooling people showing metro construction.
Future beku sir, nice ali bari truck hey iruthe n PRR 2 is toll free
Inondu bekaguthe 100%
KAR KONGRESS doesn't work GOOD.
Instead does only plans.
Planning and looting businesses and Won't do good implementation of any kind of projects 😒
Always Dy. CM is busy planning useless and unwanted Skydeck project and other infeasible projects like
Tunnel roads and other useless project planning as listed out below, that too sitting in AC ROOMS.
Many projects work are delayed like Widening of Herbal flyover, Millions of Potholes, Parking lots.
Koramangala flyovers,
Widening of Drainage,
Build more water bodies and lakes, etc.
This City is a Chaos City with all kinds of haphazard and hazardous ways of development and build 100s of different kinds of CRISIS.
The Bengaluru was executed by Congress, since 60 years of haphazard Governance model.
Land mafia,
encroachment of Rajkaluve and drainage leads to flooding during rains .
Water crisis n Flood crisis
Public transport crisis i.e.
No Suburban Railways network, since 60 years of govt in central govt. 🙄
Diminishing 2 thousands of Lakes and Parks.
Haphazard development n
World worst infrastructure in road infrastructure n
Many millions of Corruption spoiling and killing the Bengaluru city.
Road infrastructure has been completely chaos and messed up in the whole world by Congress party.
Need of the hour is 1000s of circles needs Bridges or Subways instead they plans useless tunnels which will messy the traffic issues.
Congress ideas are worse .
They stopped the higher end infrastructure project like
NICE ROAD PROJECT.
They even stopped PERIPHERAL RING ROAD for 3 to 4 decades .
This is mindset of theirs idea 💡 😳
All the projects of CONGRESS projects which are senseless and nonsense as follows:
1. FYI, Metro tunnel connect to entire city.
So Tunnel roads are
not conducive or not feasible for entire city.
Tunnel road is not conducive to one main road as well.
whereas entire city road infrastructure is worst of worst.
2. Tunnels roads are meant to use only a few for certain smaller distances and smaller areas .
Still it is not feasible to the avoid traffic jams.
3. FYI, Metro Train's tunnel doesn't not create bottleneck in the corner.
Unlike Road tunnels manifests choas and messy jams in the corner of the tunnel roads.
Tunnel roads creates messy in the tunnel road corners.
complete traffic jam in
the Tunnel corners.
4. The most Foolish project Skydeck project is completely waste and most Useless project which will increases chaos in the Road and manifests messy jams and Traffic jams.
5. There is highest numbers of one ways roads which indicates the most messed up road infrastructure.
6. There are many more thousands of manifested issues without any feasibility study.
One of the Best SOLUTION are:
Need to develop new AIRPORT outside Bengaluru.
Instead Development a new bangalore n 3 more ring road.
Apart from exitsting Satilette rings road.
Summary:
All the plans of the Congress is manifested chaos in city.
Water clogging during rains and highest number of encroachment of patks and lakes in the world.
The Congress wants only old bangalore.
Why new AIRPORT within Bangalore.
the Congress plans to squeeze another 4+ crore population in this same old congested city of Bangalore.
Utter nonsense n newsense of ideas of Congress
New paper Deccan Herald reports that,
the BBMP i.e. Corporation will spend Rs 9.45 crore on preparing the Detailed Project Report (DPR) for the tunnel project. In contrast, the cost of the DPR for Namma Metro is significantly lower. The Bangalore Metro Rail Corporation Ltd (BMRCL) spent just Rs 1.56 crore on preparing the DPR for the 37-km Sarjapur-Hebbal line, which was submitted in June this year..
Congress ideas are worse City without RING ROAD.
1. Electronic city without Ring road.
2. Bengaluru city without Ring road
3. Kwin city without Ring road .
4. In future, Any new city plans and development will be without Ring road.
They stopped All RING ROAD PROJECTS.
1. NICE ROAD PROJECT.
2. Peripheral ring road.
They even stopped peripheral ring road for 3 to 4 decades .
Now the point on Tunnel roads.
1. Fyi Metro tunnel connect to entire city.
2. Whereas Tunnels roads are meant to use only a few for certain smaller areas .
3. Metro tunnel doesn't not create bottlenecks in the corner,
unlike tunnels n tunnel roads, which creates bottlenecks.
4. there are many more issues of feasibility
Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
they will squeeze another 2+ crore population in this same old bangalore.
uther nonsense n newsense.
2.Congress Ideas n City Plans are worse and chaotic City without COMPREHENSIVE TRANSPORTATION INFRASTRUCTURE like
RING ROAD or COMPREHENSIVE TRANSPORTATION INFRASTRUCTURE PLANS.
completely messing and completely chaotic citiy plans .
For example in Bengaluru was messed up by Congress party since 60÷ years.
Eg. 1. Electronic city without Ring road.
Eg.2. Whitefield without Ring road.
Eg.3. Bengaluru city without Ring road
Eg.4. Kwin city without Ring road .
Eg.5. In future, Any new city plans and development will be without Ring road.
They stopped All the INFRASTRUCTURES PROJECTS.
Most important
RING ROAD PROJECTS.
1. NICE ROAD PROJECT.
2. Bangalore Mysore freeway.
3. Peripheral ring road.
They even stopped peripheral ring road for 3 to 4 decades .
All the Worse projects are only paperwork And slowest in the entire world 🌎.
Currently,
Now the point on Tunnel roads.
1. Fyi Metro tunnel connect to entire city and it is public transport system.
2. Whereas Tunnels roads are meant to use only a few for certain smaller areas .
3. Metro tunnel doesn't not create bottlenecks in the corner,
unlike tunnels n tunnel roads, which creates bottlenecks.
4. there are many more issues of feasibility
Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
they will squeeze another 2+ crore population in this same old bangalore.
Utter Nonsense n NEWSENSE THINKING and PLANS of Congress. .
HEIGHTS of Arrogant Hegemonic agenda n Dictatorship Governance model with FAKE FREEBIES
Policy and
FAKE FREEBIES POLITICS.
Cheapest double standards and lowest level of administration.
Lowest level of looting
POLITICS and Appeasement governance model.
No rankings or no democracy to highly educated persons 🤔.
Only CURRUPTION to the core level.
You are making amazing videos! 😊👍🏻 Please continue the same.
Namma Kannadatigaru Olle Kade Investment maadle. Ella Andre Bere avaru bandu invest maadi hogathe.
It will be too late for locals.
thanks bro ,
ನೆಕ್ಸ್ಟ್ ವಿಡಿಯೋನಲ್ಲಿ ದೇವನಹಳ್ಳಿ ಮತ್ತು ಹೊಸಕೋಟೆ ಜಂಕ್ಷನ್ ಕವರ್ ಮಾಡಿ. ಧನ್ಯವಾದಗಳು ಬ್ರೋ. .
sure i will do
Good content . Suggestions - It should be more organised and section wise.
Noted!
Tq brother good information
Your video is really informative and I like your content & presentation. Keep it up, we expect more videos from your end. Videos must be cut short.
Thank you for your comment. i will keep next videos below 10mins.
Super content Sir, google map PRR ALIGNMENT CF file share madabahuda?
Bro super video ❤. Kempegowda layout bagge video madi. Alli ast jasti yake ide rate antha.
Interesting topic
Super bro ♥️✨
Very good information Sir, thanks for sharing the link of maps as well, need your support in confirming one of the survey no 78 located at Kommagatta, near Kengari whether, it is going to be acquire by BDA or de notified from BDA, pls share your thoughts on the same, as Kempaegowda layout is situated next this area.
Good information
Hi,
Please share the details of toll plaza 10 details under PRR phase 2 covered survey nos and no of guntas.
Because, I have seen the map released in BDA website on 6/4/2022.
Requesting you provide more details of toll plaza 10. Our survey 8.1 of Bidere Agrahara.
Bro suggest any budget friendly sites with clear documents in north Bangalore side
Hi... Amazing :) Can you also explain about second proposed airport?
Tomorrow coming
please enhance your voice, its overlapping with BGM
yes. exactly
KAR KONGRESS doesn't work GOOD.
Instead does only plans.
Planning and looting businesses and Won't do good implementation of any kind of projects 😒
Always Dy. CM is busy planning useless and unwanted Skydeck project and other infeasible projects like
Tunnel roads and other useless project planning as listed out below, that too sitting in AC ROOMS.
Many projects work are delayed like Widening of Herbal flyover, Millions of Potholes, Parking lots.
Koramangala flyovers,
Widening of Drainage,
Build more water bodies and lakes, etc.
This City is a Chaos City with all kinds of haphazard and hazardous ways of development and build 100s of different kinds of CRISIS.
The Bengaluru was executed by Congress, since 60 years of haphazard Governance model.
Land mafia,
encroachment of Rajkaluve and drainage leads to flooding during rains .
Water crisis n Flood crisis
Public transport crisis i.e.
No Suburban Railways network, since 60 years of govt in central govt. 🙄
Diminishing 2 thousands of Lakes and Parks.
Haphazard development n
World worst infrastructure in road infrastructure n
Many millions of Corruption spoiling and killing the Bengaluru city.
Road infrastructure has been completely chaos and messed up in the whole world by Congress party.
Need of the hour is 1000s of circles needs Bridges or Subways instead they plans useless tunnels which will messy the traffic issues.
Congress ideas are worse .
They stopped the higher end infrastructure project like
NICE ROAD PROJECT.
They even stopped PERIPHERAL RING ROAD for 3 to 4 decades .
This is mindset of theirs idea 💡 😳
All the projects of CONGRESS projects which are senseless and nonsense as follows:
1. FYI, Metro tunnel connect to entire city.
So Tunnel roads are
not conducive or not feasible for entire city.
Tunnel road is not conducive to one main road as well.
whereas entire city road infrastructure is worst of worst.
2. Tunnels roads are meant to use only a few for certain smaller distances and smaller areas .
Still it is not feasible to the avoid traffic jams.
3. FYI, Metro Train's tunnel doesn't not create bottleneck in the corner.
Unlike Road tunnels manifests choas and messy jams in the corner of the tunnel roads.
Tunnel roads creates messy in the tunnel road corners.
complete traffic jam in
the Tunnel corners.
4. The most Foolish project Skydeck project is completely waste and most Useless project which will increases chaos in the Road and manifests messy jams and Traffic jams.
5. There is highest numbers of one ways roads which indicates the most messed up road infrastructure.
6. There are many more thousands of manifested issues without any feasibility study.
One of the Best SOLUTION are:
Need to develop new AIRPORT outside Bengaluru.
Instead Development a new bangalore n 3 more ring road.
Apart from exitsting Satilette rings road.
Summary:
All the plans of the Congress is manifested chaos in city.
Water clogging during rains and highest number of encroachment of patks and lakes in the world.
The Congress wants only old bangalore.
Why new AIRPORT within Bangalore.
the Congress plans to squeeze another 4+ crore population in this same old congested city of Bangalore.
Utter nonsense n newsense of ideas of Congress
New paper Deccan Herald reports that,
the BBMP i.e. Corporation will spend Rs 9.45 crore on preparing the Detailed Project Report (DPR) for the tunnel project. In contrast, the cost of the DPR for Namma Metro is significantly lower. The Bangalore Metro Rail Corporation Ltd (BMRCL) spent just Rs 1.56 crore on preparing the DPR for the 37-km Sarjapur-Hebbal line, which was submitted in June this year..
Congress ideas are worse City without RING ROAD.
1. Electronic city without Ring road.
2. Bengaluru city without Ring road
3. Kwin city without Ring road .
4. In future, Any new city plans and development will be without Ring road.
They stopped All RING ROAD PROJECTS.
1. NICE ROAD PROJECT.
2. Peripheral ring road.
They even stopped peripheral ring road for 3 to 4 decades .
Now the point on Tunnel roads.
1. Fyi Metro tunnel connect to entire city.
2. Whereas Tunnels roads are meant to use only a few for certain smaller areas .
3. Metro tunnel doesn't not create bottlenecks in the corner,
unlike tunnels n tunnel roads, which creates bottlenecks.
4. there are many more issues of feasibility
Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
they will squeeze another 2+ crore population in this same old bangalore.
uther nonsense n newsense.
2.Congress Ideas n City Plans are worse and chaotic City without COMPREHENSIVE TRANSPORTATION INFRASTRUCTURE like
RING ROAD or COMPREHENSIVE TRANSPORTATION INFRASTRUCTURE PLANS.
completely messing and completely chaotic citiy plans .
For example in Bengaluru was messed up by Congress party since 60÷ years.
Eg. 1. Electronic city without Ring road.
Eg.2. Whitefield without Ring road.
Eg.3. Bengaluru city without Ring road
Eg.4. Kwin city without Ring road .
Eg.5. In future, Any new city plans and development will be without Ring road.
They stopped All the INFRASTRUCTURES PROJECTS.
Most important
RING ROAD PROJECTS.
1. NICE ROAD PROJECT.
2. Bangalore Mysore freeway.
3. Peripheral ring road.
They even stopped peripheral ring road for 3 to 4 decades .
All the Worse projects are only paperwork And slowest in the entire world 🌎.
Currently,
Now the point on Tunnel roads.
1. Fyi Metro tunnel connect to entire city and it is public transport system.
2. Whereas Tunnels roads are meant to use only a few for certain smaller areas .
3. Metro tunnel doesn't not create bottlenecks in the corner,
unlike tunnels n tunnel roads, which creates bottlenecks.
4. there are many more issues of feasibility
Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
they will squeeze another 2+ crore population in this same old bangalore.
Utter Nonsense n NEWSENSE THINKING and PLANS of Congress. .
HEIGHTS of Arrogant Hegemonic agenda n Dictatorship Governance model with FAKE FREEBIES
Policy and
FAKE FREEBIES POLITICS.
Cheapest double standards and lowest level of administration.
Lowest level of looting
POLITICS and Appeasement governance model.
No rankings or no democracy to highly educated persons 🤔.
Only CURRUPTION to the core level.
@@mks2942 Noted i will add this next days , and explain my view
@@RupayiRaja Thanks.
Appreciate your views 🙏
PLEASE MAKE Vedio for areas near Hoskote and Whitefield and share the Plans
Suggestion: Please reduce the Background Music or use some Non distracting music.
Bro MAR road abruptly ends near magadi road macho Halli please share the end side or the Start side of the road
its will be acquired next days
Super
Sir Servey No 28 kanakpura road, Ashraya yojane Adi manegalu nirmana agidave , Can you tell will PRR road will effect on this servey number Asap reply kodi
Madnayakahalli near domrahalli i need information sir
Kwin city and swift city update kodi sir❤
Anekal aria bagge swalpa heli Sir
Kaggalipura uttari hatra survey no haki.. Thank u
Sorry Sir., background music volume swalpa kammi kodi.
Hi sir, I think you have missed kanakapura road attachment, there are only file for anjanapura
I will update
Modlu peripheral 1 complete madli heavy traffic in north
Sir our site is 100 meters next to the ppr 2 in electricity we are planning to build house will it effect in future or not
Hi sir our site is also 100 meter next to pp2 please suggest
BENGALORE south BASAVANAPURA sy 8/3
Namaskara 🙏🙏🙏
Casual Talk
We should appreciate
BGM Title
Bro actually I need details of PRR-2 which starts from hebbagodi(husker gate) to bannerghatta toll , I need details of veerasandra survey no 75 land map.
Kaggaliputra athra thagolrappa ille scope ide sadyakke rate kadime ide.... Adre thumba fast aagi change agthide costs...
Does margondanahalli survey no 18/2 is included peripheral ring road?
Can you please tell me the actual survey numbers affected in Maragondanahalli village (Hulimangala Main Road) for construction of PRR2?
Very good sir. Can you pl share Gudimavu, Kengari hobli, layout 6, village sy no (with podi) details please.
Please enter the required details for your submission. We will review and provide feedback in the next video
docs.google.com/forms/d/e/1FAIpQLSc5oa5dt01WvUuCiwjdeesMFeHAYzVJQxoBCFUF-jSn_mfzyQ/viewform?usp=sharing
Explain very well but I have one doubt about this video in Periprl 2 road will come on Machohalli also it will cross that village because there Metro work going and 3 km distance nice road there so again periprl rod coming or not @kindly answer on this question
Survey number and hobli and taluk mention madi I will explain in next video
Bro music astond hakbedi focus disturb agute
aithu i will reduce or remove
Background music too loud, dont put those background music
Sir Bannerghatta’s Basavanapura area near forest where it will pass
Shivaram karanth layout bagge details kodi
Agara survey number 6 BDA aquer agutada swlpa tilisi
Brother please explain PRR-2 in that kaggalipura Area like uttari and mainly banjarapalya and agara.. and also we have layout in banjarapalya in that we have one site.. there is a chance to loss that site...
I will try to do
Can you tell what survey numbers road pass in kaglipura it will be help full
Bro that kaglipura village not good quality map
BM kaval survey no 31 &32 ediya sir
Hlo sir next to proposed PRR ring road there is our property, will that land will be acquired in future.
Anna Byyandahalli sy no 69 swalpa check madi
Sir, Please suggest which area would be good to buy a land for house construction and How to go about getting the land from BDA the process that BDA follows for allotment
Sir nam site 50 m dura ede ppr 2 alle Nange problem aguthe edu house construct madboda
Sir kaglipura mathe mysoor road elelli barutte thorsi
Bannerughatta alli map akki bro near all villages
Arkathi layout nali BDA sait by madabahudha babusi pallya back said pl Reply sir
Madam ataman shall I near Doombarahalli ( Kaderanahhli ) Sy No.. Details & Proposal Peripheral raod map ...
Pls provide details for Intermediate ring road
noted: i have the data
Can you please share the plan for B M Kaval survey no. 82
Aluru survey no 42 applicable to ring road, please confirm sir.
Sir give me information madanayakanahalli, siddana hosalli, tumakura road to magadi road
Hello ,sir already i have constructed home and staying in HULLAHALLI 53/1 KATHA number , road is coming on my home. What is the best solution?
Pls update on Strr also
ಚೆನ್ನಾಗಿ ನಿವಾರಣೆ ಕೊಟ್ಟಿದ್ದೀರಿ ಬನ್ನೇರುಘಟ್ಟದಲ್ಲಿ ಎಲ್ಲಿ ಬರುತ್ತೆ
I have one site in SRY Layout..
I checked map 3.20(d) Bannerghatta.. any scope for BDA layouts nearby or price increase in SRY Layout(Mylasandra)??
Please reply
thanks a lot for your research sir. I am planning to buy a site in dodderi near big banyan tree and they claim that STRR is planned. Can you make a video on STRR please
Land buy madi ali dont buy Site why site , it wont grow quickly
@ ok Dhanyavadagalu sir
What about somanahalli?
Makali map upload maadi bro
If a family is living in the place where BDa site is coming. Then what will happen for the house where the family is living. Will it be acquired by government
I need details agara village 171 survey number this area aquired for bda
Sri can u share the gulakamele village
Hi brother
Macho halli yava survey no baruthe bro please help me
In attibele marking is done. It looks like railway project. Could you please confirm which project it is?
For which project attibele ? Circular ring railway ? 🛣️ I am preparing for it actually I am new so it’s takes time! Make videos
@ I am not sure about project name. There is a kml file circulating. In that its mentioned Bangalore Ring rail as below.
Benguluru Ring Rail
ACAD-SWR Ring rail AOI
But circular railways goes via Hilalige and Chandapur. Attibele is 10 km away from that. I am not sure why they are marking land.
@@VinodKumar-gu1st getrichvibeskannada@gmail.com
Please share here kml file thanks
Prr1 project alli yaavudhella survey numbers mela road baruthe anno details idhiya?
Weekend
Thank you👍
Make video on metro to Bidadi?
@RupayiRaja - Gudimavu survey no 6 is impacted due yo this BDA layout for 3000 site preparation?
I have noted your survey number and I will highlight in next video
Hi sir, could you please share the details about uttari survey no 122
122 will come under prr phase 2
@meghashyam5006 yes
Hullegowdana Halli on sondekoppa road nelamangala.....we have a land, can please confirm near to that village
Please enter the required details for your submission. We will review and provide feedback in the next video
docs.google.com/forms/d/e/1FAIpQLSc5oa5dt01WvUuCiwjdeesMFeHAYzVJQxoBCFUF-jSn_mfzyQ/viewform?usp=sharing
No clarity in your voice.
Next days it will improve
ದಾಬಸ್ ಪೇಟೆಯಿಂದ ಮಾಗಡಿ ರಾಮನಗರ ಕನಕಪುರ ಆನೇಕಲ್ ರಿಂಗ್ ರೋಡ್ ಬಗ್ಗೆ ತಿಳಿಸಿ
Next barthe
Innu namma side amount kottilla sir .. swalpa janakke matra bandide..innu work late agbodu
Please share the map B M kaval survey number that marked UNDER PRR2
i will make each video one file about PRR2
can you please share me survey numbers of gulkamale, kagglipura and tharulu. it will be helpfull....
Yes next video Dali
Sir I have a site near bannerghatta nesr AMC college could you please share the periheral ringroad map for bannerghatta
I have a site at Gollahalli village please mention survey number and also embose on maps
Sir 10.7 kms major arterial road .
But at Mysore road end and at magadi road end ,any flyover or under pass plan , how signal free done please explain
Complete signal free eruthe
Sir I have site near Agara village survey number :36/8 and 36 BM kaval village now they are saying KHB acquired for housing please give me correct information I took loan and bought it actually please help me sir
Sir, we have site in kanakapura road , Agara, tathaguni khata no 73 , can you pls update on this
i think its not part of PRR2 , dont needed
@RupayiRaja Any BDA plan nearby?