The Real Cost to Build 875' Driveway into the Woods

Поділитися
Вставка
  • Опубліковано 21 січ 2025

КОМЕНТАРІ • 468

  • @OutdoorsWithTheMorgans
    @OutdoorsWithTheMorgans  6 місяців тому +12

    Good stuff I use
    Bosch Rotary Laser amzn.to/4dQZy14
    3M Bluetooth Headphones amzn.to/44L038M
    Doyle Log Rule amzn.to/3wJoO8X
    Chemical Guys Foam Cannon and Soap amzn.to/4bGlv0V
    Sure Can 2.5 Gallon Gas amzn.to/3WGWiiR

  • @onthefritzfarm
    @onthefritzfarm 6 місяців тому +101

    I watched all of Tyler’s throws this past weekend. I was rooting for him and talking to the tv cheering him on. 10th in the nation is quite an accomplishment. I’m proud of his dedication.

    • @rogermoore8977
      @rogermoore8977 5 місяців тому

      Has anyone tried soil cement? It doesn’t work everywhere, but it might save money in the right places.

  • @michaelblair2370
    @michaelblair2370 6 місяців тому +22

    If you will back your skid passed the pile instead of turning around twice for every scoop, each cycle will be a total turn of about 30 degrees instead of 360 degrees...you will get an extra 200 to 300 hours on a set of tracks and your machine will last considerably longer before drive components need replaced.

  • @freidrichnietzsche6643
    @freidrichnietzsche6643 6 місяців тому +5

    Great video sir.
    Architect/builder here, & we're blessed to have a lot (but never enough) of land in WV that I'm redeveloping (has been "wilding" for about 40 years) and we're fighting this fight. Good thing is my retired pops has a small excavation company and according dump trucks so we don't have to manually move the stone like you're doing here unless we want to or need to touch up a certain area. I've realized that I definitely need a small dump trailer like you have for other misc chores around the tract. Those trailers are handy "like a pocket on a shirt!"
    I know you know this, but for the price of delivered stone, you could have them "tailgate" it for you then touch it up with the other equipment you have like the land plane. Will save you a LOT of time. FWIW, for newly cut roads, we almost always put down some type of typar membrane then #1 (or other course aggregate/rip rap) then layer our smaller crushed stone on top of that. Depending on how much water the uphill ditch will have to handle, we may or may not shape large aggregate/rip rap in the ditch with the excavator & skid steer which helps with erosion. Then we liberally sow fescue seed on any fresh cut that remains which usually starts to sprout in as little as a few weeks and further keeps the erosion in check.
    Land planes are a godsend for working with that small stone. Also, out in the country like this, put in more culverts than you think you'll need, when one gets blocked you have some redundancy and can avoid road washouts when the boomer storms come.
    If you really want to get deeper into the rabbit hole, USGS has some tools that can help you calculate potential rainfall and affected runoff areas/totals for your ditch/culvert sizing (a good place to start ~ water.usgs.gov/edu/activity-howmuchrain.html) 🍻

  • @charlessabinjr7661
    @charlessabinjr7661 6 місяців тому +31

    Good morning, OWTM. From north-central Idaho.
    When I saw this title, I was glad to see this project reach a final stage. Then I thought how this 😮 more than just a road.
    During this build, you have taken us on a journey that includes daily home life, successful business expansion and operation.
    And, as icing on the cake, moved forward significantly on the development of your West Virginia property.
    I salute you and your family for perseverance and endurance, and for what my father would have called internal fortitude - gumption. At 70 years old, I commend you to ours and younger generations as a fine example of living as a free man.

  • @jeffroberts6585
    @jeffroberts6585 6 місяців тому +16

    Another great video. About two years ago we needed to replace the drain field for our septic system and here in north Florida we got 4 quotes ranging from 8000.00 to 12000.00 . Being a contractor for 26 years I decided to do it myself and with machine rental and materials I spent right at 3000.00 . There is not a better feeling than doing it yourself

  • @jasonlohorn268
    @jasonlohorn268 6 місяців тому +77

    12k or so to build your road , 40k if you hired it out … but then factor in how much revenue 175 trees might bring in , in terms of firewood or lumber. I think your in better shape than you think .

    • @4wheelliving132
      @4wheelliving132 6 місяців тому +15

      I was thinking along those same lines, plus UA-cam content revenue

    • @DebDeBoop
      @DebDeBoop 6 місяців тому +5

      I was wondering about that as well!

    • @Pterodactyl-kn3ve
      @Pterodactyl-kn3ve 6 місяців тому +8

      12k is a great price.

    • @dougsmith9099
      @dougsmith9099 6 місяців тому +4

      I'm pretty sure to hire someone to bring there machine and do it they will charge for the machine by the hour and then the operator also

    • @gregrussell6081
      @gregrussell6081 6 місяців тому +5

      Last year I rec'd a quote of $42K to put in an 850 ft gravel road and clear the trees on one acre in south western NC.

  • @TomTalley
    @TomTalley 6 місяців тому +24

    Love the mix of action/music, commentary, and conversation. And the choice of music is great. Thanks for all the hard work

  • @toshayonguard4253
    @toshayonguard4253 6 місяців тому +10

    I feel your Driveway cost my Driveway is 1320 feet and we love it. We lined our Driveway with blooming pear tree’s and everyone that see’s our Driveway tell’s us it is Amazing and they want to know what tree’s are lining our Driveway. When I mow I have had people stop and ask what are the tree’s. Amazing how beautiful tree’s can bring people together. 🤘🏼🇺🇸🇺🇸🇺🇸

  • @L46C3
    @L46C3 6 місяців тому +11

    Good stuff Mike!
    2024 comparison Southwest Mass on the CT border. I contracted out a 375 foot road with no gravel/stone just a gravel/sand base mixture, compacted (gravel and stone to come). Tree removal. Small mouse clearing and a turn around area. Trees removed, branches chipped $18000!

  • @genedingmann3931
    @genedingmann3931 6 місяців тому +7

    Impressive!!! Side boards still intact.

  • @matthewward631
    @matthewward631 6 місяців тому +8

    It’s always a great feeling at the end of the day to be able to see what all your hard work has accomplished. Definitely a testament to a good old work ethic. Great job!

  • @Z-Bart
    @Z-Bart 6 місяців тому +7

    Must have been fun driving the Big Ford and trailer on your new road to Morgan Park!

  • @johnsandell4501
    @johnsandell4501 6 місяців тому +12

    The progress on the Morgan Highway is fantastic and the number of episodes made on it is a YT success. Melissa's shopping math was how my mother in law thoughts were. You are doing a wonderful job contenting this property improvement. 👍👍👍

  • @robertdunaway9872
    @robertdunaway9872 6 місяців тому +8

    That road is looking really good! I think it makes your property look better. You do great work Mike Morgan! Love the channel!

  • @lorallamb2673
    @lorallamb2673 6 місяців тому +5

    Thanks for the numbers on making the road! Hi to Hunter!! 32 years old!

  • @lucasstenovitch2280
    @lucasstenovitch2280 6 місяців тому +7

    Mike, I love this channel because you do my favorite things. Splitting wood, doing anything with wood, digging dirt, and expanding your property. Me and my dad did that at our property years ago with our small kubota b7500 tractor and backhoe, then bought a kubota rtv 1100 and used it as our mini dump truck to move fill around and then borrowed my uncles skidd steer and kubota kx121-3 mini excavator to do the work as well. We live in Cumberland Rhode Island and we don't have much land where we are, but it feels like we cleared lots of dirt and rocks. Shout out to you. I was here when you had your Polaris ranger and kubota l3901.

  • @garymixson687
    @garymixson687 6 місяців тому +3

    I still believe that spot would make a great homesight!!! Nice driveway

  • @billyladner3062
    @billyladner3062 6 місяців тому +5

    When I built my house I installed a gravel driveway but every time we had a hard rain I had to boxblade the gravel back on the driveway. About 25 years ago we had a chance to asphalt it. The driveway was 10 ft wide 1 1/2 in thick a d 600 ft long and cost $4000. I think you came out good on your cost. Have fun and stay safe!

  • @ChuckKalish
    @ChuckKalish 6 місяців тому +6

    I've been watching your road project through your videos. Thanks for the tips and technique discussions along the way. They are very helpful for a novice equipment operator. I've been working on a similar project, building an access road/trail through my woods and across a pond bank that separates the two settling ponds on my property. Your videos have given me ideas on how I approached various portions of my project. I can't say my grades are quite as nice as yours; however, I can now get my machines around the ponds to do maintenance and deal with downed trees and branches. Anyway, thanks for the cost analysis discussion. Your road project turned out great. I'll be interested to see the final installment after the last load of limestone is down.

  • @JRLawhorne
    @JRLawhorne 2 місяці тому

    Looks great! I like to have the dump drivers tailgate it on then clean it up.

  • @paulmollise1856
    @paulmollise1856 6 місяців тому +2

    Mike, I had a rough estimate from a local builder in our area in our talks about a new home , he said they charge $4sq ft, so 4sq ft x 12 feet wide x 875 feet long your at 42,000, my driveway I’m looking to put in is 1200’ and I’m doing it myself 1/3 of it through woods and the other 2/3 through two fields, I’m following your theories owning my own equipment

  • @sr4169
    @sr4169 6 місяців тому +2

    Beautiful new road driveway. That’s about if work. For those who have or want to do similar, research “recycled crushed concrete”. Where I live it’s about 40 percent less expense and results in cement fines in the backfill. Once it rains crushed concrete aggregate gets very firm.

  • @G.I.JeffsWorkbench
    @G.I.JeffsWorkbench 6 місяців тому +3

    Glad you’re near the finish line w/ your new road. It should be a lot more convenient getting to the meadow. I appreciate your cost estimate. We have a similar job ahead of us establishing our new homesite. No way I’d want to pay someone to do this. Like you, I want to do this job right, and put the saving to building our barndominium. Thanks for putting this together. Very helpful.

  • @keithbeynon3878
    @keithbeynon3878 6 місяців тому +3

    Congratulations on a job well done, so gratifying that you completed it yourself.

  • @zeebeefpv2273
    @zeebeefpv2273 6 місяців тому +5

    Get some 1/8” acrylic sheet scraps and make a seatbelt-buckle template to plug in while you’re on-property to shut up the dinger!

  • @donaldkennedy5604
    @donaldkennedy5604 6 місяців тому +4

    I sure do like the way you do things Mike.

  • @Step-n-Wolf
    @Step-n-Wolf 6 місяців тому +2

    My driveway through the woods is over 2000'. Lots of cutting, stump pulling and loads of gravel.

  • @gaylecharpentier8097
    @gaylecharpentier8097 21 день тому

    Gayle Charpentier, You two are the purfix couple ,love watching .

  • @fit4ya1975
    @fit4ya1975 6 місяців тому +2

    I have approx 700ft of driveway I did back in 2020. Its 12" thick in some spots and it was about 12K. Thats with a friend hauling the gravel in with his dump and using his skid and my tractor. I also topped it with clean 3/4 in Limestone. So id say in today prices thats a great deal. Who's Denali Mike?

  • @jamesadkins9988
    @jamesadkins9988 6 місяців тому +4

    Your comment about keeping the road on grade reminds me of a job interview for a dozer longtime ago. The applicant asked the boss that was overseeing tryouts What is the pay?
    The boss told him $18-20+ an hour depending on skill level.
    He goes to the bulldozer starts it proceeds to grade a road the boss had described he wanted him to build. He left from where the machine was sitting and about one third speed and blade was up and down to entire time till the end of the road.
    Returning back he spins the machine around applying about three quarters throttle engages the road and leveling all the rowing material making a perfect surface for the road.
    Gets off the machine going to the boss telling him “That was $18 going and $20 coming back. Your choice”.

  • @wyattearp1418
    @wyattearp1418 6 місяців тому +4

    I enjoyed that video, think I watch it again. Looks Good Mike!

  • @vicinalvictor6612
    @vicinalvictor6612 6 місяців тому +2

    Here in Michigan you pay anywhere from 150-175 dollars per hour for a heavy equipment operator to work on your property.

  • @garygarner9007
    @garygarner9007 6 місяців тому

    It's about 6:00 Wednesday morning great job on your road looks real good have a great 4th of July from North Carolina be careful be safe and have a great weekend

  • @paulfrew6291
    @paulfrew6291 6 місяців тому +1

    Wow that is a great looking road pride in your work manship is a simple thing even if the job is for someone else
    Cheers Paul

  • @stephenebertrand5727
    @stephenebertrand5727 6 місяців тому +1

    I live in Chipley florida, about 35 mile north of Panama City. The cost for #57 or #57 stone is $90 a ton delivered $1800 a truck load 20-22 ton

  • @billk8780
    @billk8780 6 місяців тому +9

    Using Melissa's "shopping math" absolutely loved it!

  • @johnp6886
    @johnp6886 6 місяців тому +9

    All that hard work on the road will pay off when you build the barndominium !

  • @charlesfoleysr6610
    @charlesfoleysr6610 6 місяців тому +1

    Doug have bbn you trained Levi to run your sawmill. I know he has operated all the firewood equipment. I've only seen you run the sawmill. If he hasn't run the mill yet, you should get him on it as your backup. Just the ramblings of an old man feeling his mortality. I love your videos and your opinions on things.

  • @matteberry58
    @matteberry58 6 місяців тому +1

    You're great at using the machines to build the road. You make it look easy.

  • @peteatthefarm4459
    @peteatthefarm4459 6 місяців тому +3

    Morning Mike, sunny and warming up in Ontario.... enjoy YOUR day....
    Pete 🇨🇦

    • @OutdoorsWithTheMorgans
      @OutdoorsWithTheMorgans  6 місяців тому +2

      Morning!

    • @davidmorse8432
      @davidmorse8432 6 місяців тому +2

      Hi Pete, Hot and humid here today. High of 95° F.

    • @peteatthefarm4459
      @peteatthefarm4459 6 місяців тому +2

      ​@@davidmorse8432Morning David, not that hot here, upper 80s, looks like a fine day to sit at the pond after working a bit...

    • @johnsadler8637
      @johnsadler8637 6 місяців тому +1

      Howdy Pete! Clear and mild here in NCNC this morning - 54F/12C. A treat for 2 July for sure.

  • @johnkirby6547
    @johnkirby6547 6 місяців тому +1

    Good morning Mike, Hope you get some rain to help settle that rock. Almost perfect timing in between, as you near the end it rains..

  • @zeebeefpv2273
    @zeebeefpv2273 6 місяців тому +1

    Get some 1/8” acrylic sheet scraps and make a seatbelt-buckle template to plug in the truck while you’re on-property to shut up the dinger! Same for canam sxs!

  • @fricknjeep
    @fricknjeep 6 місяців тому +1

    hi there nice input , good show , best to all john

  • @billloutzenheiser5397
    @billloutzenheiser5397 6 місяців тому +1

    Since you are loosing the tracter and box plane have you looked at the grader atachment made by Spartan, makes the skid a small road grader, Just a thought for all the road you work on AND we enjoy your show

  • @jimconnor8274
    @jimconnor8274 6 місяців тому +1

    Nice job Mike. A Huber road maitainer would be nice to dress up the stone once a year.

  • @Duncangonefishin
    @Duncangonefishin 6 місяців тому +1

    Good morning y'all !!! Have a fantastic day and hello from British Columbia !!!

  • @Big-John
    @Big-John 6 місяців тому +1

    When you're doing that heavy slow work you should be in 4 low! Your transmission will thank you!keep up the great work 👍

  • @gregwitkamp5583
    @gregwitkamp5583 6 місяців тому +3

    Mike what I have found out when grading with a small piece of equipment is to keep at least a 1/2 bucket of materials in the bucket to stabilize the bucket, helps to take the slack out of the pins, bushings and linkage , any slop so to speak . You do a great job teaching bye the way that should be very beneficial to these youngsters, especially the one out here ramen the town pile 😊

  • @ronwhite6719
    @ronwhite6719 6 місяців тому +2

    Hi Hunter, always great to see you.

  • @Shippusher
    @Shippusher 6 місяців тому +10

    GOOOOOOD
    MAAAAAAAAWNIN EVERYONE & wishing all y’all a HAPPY & SAFE INDEPENDENCE DAY!!!….Looking good! Nice video work Melissa. Always enjoy seeing Hunter.
    Have a day
    HELLOOOOOOO
    HUNTER 😊

    • @johnsadler8637
      @johnsadler8637 6 місяців тому +4

      Good maaawnin back, Jack!
      Ditto to all your points, on Melissa’s video work and Hunter too!

    • @Shippusher
      @Shippusher 6 місяців тому +3

      @@johnsadler8637 great minds think alike

  • @wallbawden5511
    @wallbawden5511 6 місяців тому +1

    Very fair estimate on the coasts and materials machine hours and such also your music is getting better has a beat to it now well done i and as i have seed this is me i would rather not have it but i think you are an honest man doing his own thing on his land and loving it well done to you my friend Cheers road is looking real good

  • @stevenkukene9970
    @stevenkukene9970 5 місяців тому

    Nice job!

  • @marciam6224
    @marciam6224 6 місяців тому

    Hi Hunter!!! Always nice to see your smiling face.

  • @jamespritchett1886
    @jamespritchett1886 6 місяців тому +1

    R u going to have some what of a parking lot at the end of the road to the left side to park vehicles.

  • @barryhoneycutt3894
    @barryhoneycutt3894 6 місяців тому +1

    This was a very informative video Mike. I was awaiting to see what you came up with on the costs, knowing your a numbers, math guy, i was really surprised at how much you saved, i mean you can be well on your way to paying for equipment with those kind of savings, and i think you really enjoy doing that type of work as well, so its a win win win, Enough saved Melissa may just get her pool :) ❤💯🙏

  • @MikePagenkopf
    @MikePagenkopf 6 місяців тому +1

    Good morning Mike and Melissa have a good day road project looks awesome nice job enjoy your day have fun be safe 🚜🙂

  • @jeffhennings6579
    @jeffhennings6579 6 місяців тому +1

    Looking real nice and the Cost not bad for what you have done good deal

  • @free_at_last8141
    @free_at_last8141 6 місяців тому +1

    I wish that I could handle a trailer like that. Good stuff.

  • @jimsears2434
    @jimsears2434 6 місяців тому +1

    Looks like a nice road you have going...good job! I've run those track machines since they hit the market way back when. I would recommend stone pile placement and trailer loading spotting to eliminate all the 180 degree spinning. It really does wear parts/tracks prematurely when rocks get in-between guides... rollers. It's always best to eliminate that excessive spinning by spotting your trailer at a 45 degree angle backed up close to the pile. That eliminates all the track wear spinning and all ya have to do is stab the pile..back out with slight angle turn and then approach the trailer. It's faster .....less wear....and less clean up. The tracks and rollers are not cheap..and since these are your machines I'm sure you want the tracks to last all the way to normal replacement. Good Job on the road!

  • @it26b
    @it26b 6 місяців тому

    MIke, I was a fellow Pa man. worked in York over 30 years as Mech Eng. Retired in SW Virginia. Been watching your videos for several years and enjoy them. Noticed your conversation with wife
    I saw a Yankee Candle "Jar " hanging from mirror with Midsummer night scent. Wow, had that in my vehicles for over 25 years. Best scent for men eh. Good to know we have something in common, HaHa Have a day friend. JES

  • @jeoinaforest
    @jeoinaforest 2 місяці тому

    We built right at 900’ off the road. Gravel alone to get a truck ready stable driveway was right at $30,000 over 4 years. Southern Indiana.

    • @jeoinaforest
      @jeoinaforest 2 місяці тому

      Oh, I did all the work myself. That was gravel only but includes the 40x80 warehouse site. Shocking how quick $700 of stone spreads…

  • @1944chevytruck
    @1944chevytruck 6 місяців тому +1

    WOW! AWESOME!

  • @danshields3654
    @danshields3654 6 місяців тому

    On top of the cost to build the road you also will have a bit of income be it lumber or firewood from the trees that you took down. Good breakdown of the cost to build it.

  • @russellbowman8051
    @russellbowman8051 6 місяців тому

    That's Shaping Up To Be An Awesome Job!!
    Keep Smiling On!!
    😅👍👊❤️

  • @andyrobinson339
    @andyrobinson339 6 місяців тому

    It's a nice little road and all but somewhere along the line I missed what the clearing and the road are actually for.

  • @georgeniebergall7074
    @georgeniebergall7074 6 місяців тому +2

    If you read what I said the other day you could’ve had the truck that delivered the stuff to exactly what you’re doing. You have the box greater I don’t know why you did it this way anyway you’re the boss

    • @obedcasillas3404
      @obedcasillas3404 6 місяців тому +1

      They had a lot of rain, and the turnaround was very soft. So he played it safe and had them dump it. Smart move Mike.

  • @1guyin10
    @1guyin10 6 місяців тому

    The Morgan expressway is looking good!

  • @jimmywarren6685
    @jimmywarren6685 6 місяців тому +2

    Great job on the road!!!

  • @matthewsims359
    @matthewsims359 6 місяців тому +4

    The road build project has been fun to watch and also educational. I also think that you could deduct some of your cost due to the lumber and firewood that you got from the trees that you removed. Hope everybody is having a good week. Stay safe everybody

  • @steveashworth6707
    @steveashworth6707 6 місяців тому +1

    Mike you explained grading your stone perfectly!, i use my bobcat only starting out level and always having stone in the bucket going forward. If you work it to much it segregates.
    With equipment cost as they are a lot of people couldn't afford to have work like this done. Definitely a must to invest in your own equipment.
    Great job on your road!, being particular is a good thing im the same way!.

  • @garysuderman174
    @garysuderman174 6 місяців тому

    Mike, did you figure in the profits from firewood and lumber you hauled out from the road/field job? Not to mention the food you'll supply for the deer. I'd say with all the work you've done around your land since you bought any and all of the equipment, and calculated paying yourself, all your equipment and maybe some vehicles are paid for already. Thanks for the lessons you gave us all for free, knowledge is devine.

  • @TKCL
    @TKCL 6 місяців тому +13

    Interesting breakdown and way of looking at it. Long story short, I crave the satisfaction of a job well done. The savings of doing it yourself is huge, as well as the quality of the work. I do it for the enjoyment of it and looking back years down the road saying "I built that". In today's world of mundane and unsatisfied work environments, people don't get many opportunities to see the fruits of their labor.

    • @davidmorse8432
      @davidmorse8432 6 місяців тому +6

      Yes, what you are saying is so true. There is such a value to having something you had a part in creating and that you are proud of.

    • @johnsadler8637
      @johnsadler8637 6 місяців тому +6

      I’ll echo that sentiment. As someone who worked in the abstract world (ag research), my product was new information in published journal articles. There’s not much personal feedback from that. On the other hand, I have derived great satisfaction from the work on our farm improving the facilities, clearing and rebuilding fences, generally making things better. Feels good!

    • @TKCL
      @TKCL 6 місяців тому +4

      @@johnsadler8637 it does feel good! Very healthy for the physical body and mind. I love nothing more than a hard days work on our property. Nature is a wonderful healer that less and less ever get to experience.

  • @jonathannelson3348
    @jonathannelson3348 6 місяців тому

    Great info and videos would be cool to see the old dump trk in action .what yr is the old roller .I like and enjoy old equipment was raised on old stuff liked that

  • @ericfluty3257
    @ericfluty3257 6 місяців тому

    Looks like a good job for Blueford! Nice work on the road!

  • @tomscott3939
    @tomscott3939 6 місяців тому

    i see the clear lumber stacked and stickered and i kook back forty five years ago and i paid 10 dollars a ft. for a peace of 1x12 x8ft. 80 dollars !!!! nice stack of lumber you have there Mike

  • @dirtgreaseoutdoorpeace6637
    @dirtgreaseoutdoorpeace6637 6 місяців тому

    It’s coming out great Mike. Was looking for Tyler on tv last week.

  • @wyattearp1418
    @wyattearp1418 6 місяців тому +1

    Was even better the second go around, thanks for Sharing.

  • @BuceGar
    @BuceGar 6 місяців тому

    Asphalt millings are going to $18.00 a ton, delivered, here in central Ohio.

  • @buckeyefarmer6259
    @buckeyefarmer6259 6 місяців тому +1

    I got prices to install geothermal system. Then I bought a new kubota with backhoe, and did it myself and saved money over the contractor cost, and ended up with a new tractor. However, for my remote VA property, I got quote of $12K for a 300 ft driveway, flat area, 3 trees to come down and 1 culvert. Been debating renting equipment and doing it myself. Normally I do things my self.

  • @582ChevelleSS
    @582ChevelleSS 6 місяців тому

    Wow Tyler did an amazing job placing 10th in the nation. Great work as I was very impressed. Definitely something to be proud of :) Driveway is looking great. Here in the Toronto area that would cost way way more than $40,000

  • @ricklane471
    @ricklane471 6 місяців тому

    Your numbers are spot on. My neighbor here in N Idaho relocated our road (private) to get it further away from his house. It was about 330 feet or so, and though we got a few bucks from the local sawmill for some of the big firs that had to come down; it cost him around 30K for the work.

  • @TheFabled1
    @TheFabled1 6 місяців тому +2

    What was the stone total for 2023?

  • @richardbritton5280
    @richardbritton5280 6 місяців тому +1

    great job ty

  • @dmorgan28
    @dmorgan28 6 місяців тому

    The road and everything look great Mike. Good job!👍❤️

  • @shartne
    @shartne 6 місяців тому

    Kool the Huntman he knows he needs to travel to make sure he feels like he got something done today.

  • @LeoBias
    @LeoBias Місяць тому

    Which one of your videos did you finish that building that you drilled the holes and set those 6-6 poles and you were proud of that laser you bought to get it all strait.

  • @KPVFarmer
    @KPVFarmer 6 місяців тому

    Thanks for the breakdown on costs and estimating what it would cost to hire it out is good too.

  • @shane7133
    @shane7133 5 місяців тому

    Im in western Illinois. I put in a 500', 15' wide driveway in my woods for 4k. Removed around 100 trees and hauled in roughly 285 tons of 2" rock base and CA-6 crusher pack.

  • @patrickhobbs976
    @patrickhobbs976 6 місяців тому

    Very impressive!

  • @calvinjohnson7806
    @calvinjohnson7806 6 місяців тому

    Thanks again for all your videos

  • @bryanlloyd1099
    @bryanlloyd1099 6 місяців тому

    The new road is looking great!

  • @johnholm8175
    @johnholm8175 6 місяців тому +4

    Had 4.8 inches of rain just southwest of Kansas City yesterday morning in 5 hours

  • @OutdoorsEngineer
    @OutdoorsEngineer 6 місяців тому

    Mike - would you ever be open to chatting on the side regarding the logistics of what you do? I'm reconsidering my "business" and also my YT channel and how they tie together, and you obviously have this figured out. Would love to learn from an expert in this community. I appreciate your time and effort in sharing what you love to do.

  • @luisrodriquez6358
    @luisrodriquez6358 6 місяців тому

    Mike your road through the woods looks really good. Nice to see a someone like you take pride in the work you do. I’m sure you would probably do the same, if you were doing this on a job for someone else. I try to find Tyler’s throws this past weekend. All I could get was the track and field girls running and gymnastics.

  • @Ttow49
    @Ttow49 5 місяців тому

    Look at those tailgate skills !

  • @BigSwede58
    @BigSwede58 6 місяців тому

    I’ve been watching Your videos for about 2 1/2 years now and I’ve looked forward to your 4th of July fireworks show! But I remember that you said you probably weren’t going to do 1 this year because of the which ever firework got You last year.And that’s great,but please wish the “ Huntman” a Happy Birthday from Me ! Happy 4th of July also !

  • @davidhuffine5084
    @davidhuffine5084 6 місяців тому

    Road is looking good .

  • @georgeoconnell8370
    @georgeoconnell8370 6 місяців тому

    great sense of satisfaction . well done . good to see lady m. quietly buckey up . quit a lady . outstanding amily god bless go hunter go

  • @kearnsey64
    @kearnsey64 6 місяців тому +1

    Mike, up here in Taxachussetts, excavator with an operator is $150 per hour average. 😮