Big improvements. I can appreciate the initiatives of the higher ups. But sorry to observe the workmanship is of pathetic quality. Almost childlike. An embarrasment. Poorly trained and motivated lower level factory floor labor to blame? I understand this is a product of a PSU/Gov. undertaking. But still. This needs to be improved. Some of the things that can be done. 1. Design for manufacturing and maintenance - when designing, pay attention to make it easier to assemble and maintain. This may even be cheaper in the long run. 2. Strengthen/implement better QA processes and management 3. Improve supervision of assembly workers 4. Better training and motivation of assembly workers, and make them take pride in their work ( somehow) 5. More mechanization of assembly processes and better equipment for the assembly workers. - I often see picture/videos of assembly workers with outdated hand tools banging on things - I am talking about providing them with better tools, basic things like up to date power tools like drills, saws, grinders and such. Just a well wisher.
@@railmaintenance7651 a local uses 5 ft 6 in gauge. Metro uses 4 ft 8.5 in gauge. And since a metro uses underslung electrical components, this ac local becomes a metro train plus version or pro version whatever you like to call it...
😊😊😊😊😊😊😊😊😊❤❤❤❤❤❤❤
I want to travel at this rake one time
Sir, please come in Mumbai
@railmaintenance7651 I'm in Mumbai bro
Okay 👍🏻
I request to local peoples who travel on this train. Don't mess and don't throw pan masala thing in train. We need clean 🇮🇳
Very good for knowledge 👍
Very nice look
Nice 👍
In which line this bombardier ac emu run In cr,wr
This is Meha AC Under-Slung EMU
@@railmaintenance7651 Which line this service will start????
Western
@@railmaintenance7651 Ok thanks 😊
When they will add this rake to service?
Service start from 19/12/2022
@@railmaintenance7651 had a ride today in this emu very nice space inside the emu
Aaj se service start
Big improvements. I can appreciate the initiatives of the higher ups. But sorry to observe the workmanship is of pathetic quality. Almost childlike. An embarrasment. Poorly trained and motivated lower level factory floor labor to blame? I understand this is a product of a PSU/Gov. undertaking. But still. This needs to be improved. Some of the things that can be done.
1. Design for manufacturing and maintenance - when designing, pay attention to make it easier to assemble and maintain. This may even be cheaper in the long run.
2. Strengthen/implement better QA processes and management
3. Improve supervision of assembly workers
4. Better training and motivation of assembly workers, and make them take pride in their work ( somehow)
5. More mechanization of assembly processes and better equipment for the assembly workers. - I often see picture/videos of assembly workers with outdated hand tools banging on things - I am talking about providing them with better tools, basic things like up to date power tools like drills, saws, grinders and such.
Just a well wisher.
Quality check is pretty poor.
Quality of finish has always been really poor with our products, unfortunately
Beautiful combination of Kolkata Metro and Mumbai AC Local Train in the 8001-8004 rake
Because Manufacturers of both trains are the Same
Medha rake??
@@railmaintenance7651 Yes
Is it in Mumbai?
Yes
That's Virar Carshed
Yes, Virar carshed
Metro Pro Max
This is AC EMU local train in Mumbai
@@railmaintenance7651 a local uses 5 ft 6 in gauge. Metro uses 4 ft 8.5 in gauge. And since a metro uses underslung electrical components, this ac local becomes a metro train plus version or pro version whatever you like to call it...
Yes, true. 😂