Ademsan Machinery Zanyar Tower AST-70 BMU Test

Поділитися
Вставка
  • Опубліковано 21 вер 2024
  • In this video we test our Building Maintenance Unit after the first installation. This procedure is applied to all BMUs. We use full capacity for the cradle and the GRU.
    Time stamps:
    0:00 General overview
    1:55 Hoist and GRU Test
    2:40 Balancer Test
    2:56 Drive System Test
    3:23 Slew System Test
    4:06 Jib In/Out Test

КОМЕНТАРІ • 1

  • @sandeepthorvat6395
    @sandeepthorvat6395 2 роки тому

    We are Building Maintenance Unit(BMU) Service Provider based in UAE.
    We have seen the challenges faced by the industry very closely & have developed a system to over-come some of these challenges.
    The main challenges faced by these industries are the following:
    1) High costs of conductor wire ropes
    2) Limitations on voltage
    3) Large battery size
    4) Wireless communication challenges such as Line Of Sight (LOS) Issues.
    5) Communication Breakages
    We have developed a 24 Channel Wireless Transmission System catered to B2B which can be incorporated in any BMU system and also branded as OEM’s for your new as well as existing projects as the need may be.
    It is a product developed after a lot of research keeping in mind the problems faced by the BMU industry, such as signal interference, line of sight, cost factor etc