Thank you. There is some issue with 16:9 ratio of video for Opal block. Seems the digging is for HT pole shifting, hope they install the new slim round shaped HT pole. Thank you for sharing this O72-O93 lane, i have been asking on many channels but Noone has shown even once this lane due to HT line.
Yes. There is some progress on HT line shifting, the digging you see is for new HT line pole. The foundation work was being done over the green belt for tbe pole. The new pole will be on the green belt in front of this lane. For the lane O73-O92, for most the work is done for basement only as work cant move up due to HT line. Hopefully they shift it soon over tbe green belt as now tbere is some work done for the new HT pole.
@@parveenkaishav1900 No it wont be underground ever though builder mentioned it will be underground while selling, it will be shifted only over the green belt. If has to be underground, it would have been underground by now in Signature proxima and Orris market 89 from where is passes through as well. The green belt is for this purpose only....Not for Green in the society.
@@Amit-li2gi That’s very surprising as they charged PLC for that green area….Do you know what will be the solution as living there with those wires will be impossible…
@@Amit-li2gi also can you confirm what’s the current status of this in Signature Proxima and orris market that you mentioned.Is it shifted or it is still there…
Sir Video Sahi nahi bana, Vertical mobile ghuma ker apne video ghuma diya...
Kisi editor ker bol ker theek kerwa ker fir se upload ker dijiye..
O 1 to 32 ka kya status hai .. konse floor tak ban gaya .. kuch pta nahi chal raha.. please bataiyega
O-01 to O-36 work currently at Stilt ( check video at 11:53)
Thank you. There is some issue with 16:9 ratio of video for Opal block.
Seems the digging is for HT pole shifting, hope they install the new slim round shaped HT pole. Thank you for sharing this O72-O93 lane, i have been asking on many channels but Noone has shown even once this lane due to HT line.
Yes. There is some progress on HT line shifting, the digging you see is for new HT line pole. The foundation work was being done over the green belt for tbe pole. The new pole will be on the green belt in front of this lane. For the lane O73-O92, for most the work is done for basement only as work cant move up due to HT line.
Hopefully they shift it soon over tbe green belt as now tbere is some work done for the new HT pole.
Ok and how about long term.Will it still remain there or the plan is to shift is completely…..I visited today and it is still there….
@@parveenkaishav1900 No it wont be underground ever though builder mentioned it will be underground while selling, it will be shifted only over the green belt. If has to be underground, it would have been underground by now in Signature proxima and Orris market 89 from where is passes through as well. The green belt is for this purpose only....Not for Green in the society.
@@Amit-li2gi That’s very surprising as they charged PLC for that green area….Do you know what will be the solution as living there with those wires will be impossible…
@@Amit-li2gi also can you confirm what’s the current status of this in Signature Proxima and orris market that you mentioned.Is it shifted or it is still there…
What's the update about shifting HTW? HTW was already there over O block..what is new here? Is there any change in position of HTW?
Back side road kitne mitre ka hai
5 meter, one way road.