Wow, looks like just the opposite with the pedestrian/bike path . Still not open after months of just sitting there ready to go. Why won't they open this?
There's something wrong on the Staten Island side. There is no entrance from the street. It is fenced in with permanent fencing. Rumor is it opens June 2019, but don't hold your breath. It was originally supposed to open August 2018.
Nice... I seen this all the time going from NYC to Alantic city... really nice bridge
Luv the new bridge....amazing engineering
A lot of cable stayed bridges these days are replacing all other types of bridges.
why does this look like the crescent city connection?
I say that by the year 2050, it will cost 45 dollars to cross that bridge for a normal passenger car.
Wow, looks like just the opposite with the pedestrian/bike path .
Still not open after months of just sitting there ready to go.
Why won't they open this?
There's something wrong on the Staten Island side. There is no entrance from the street. It is fenced in with permanent fencing. Rumor is it opens June 2019, but don't hold your breath. It was originally supposed to open August 2018.
Now only if it really happened that quick!
These new bridges all look the same: Boring.
There cheap easily manufactured design.