NCCCO EXAMS: YOU NEED TO SEE THIS COMPLICATED LOAD CHART QUESTION!

Поділитися
Вставка
  • Опубліковано 8 вер 2024
  • WORK THROUGH THIS NCCCO LOAD CHART SAMPLE QUESTION WITH ME TO PREPARE FOR YOUR EXAM!
    #NCCCO #LOADCHART #crane #craneoperator #CCO

КОМЕНТАРІ • 31

  • @Crane-1
    @Crane-1 Рік тому +13

    You know I’ve been a nccco ever since since this started to be the norm
    The first thing as a operator you find out is what your heaviest load is going to be and rig the crane for that, then your path of travel for over head and underground hazards!
    Why would you 4part a block when 2 parts is all that is required
    You run the boom out with 4 part block you would assume it’s going to be a heavy load, in the real world heavy load means max boom angle 4 part block you run out of cable before your hook gets to the ground
    But in the world the people that came up with these tricky questions, you have plenty of new cable I’ve been doing hook work for over 40 years when I started the operator’s job was fun and highly respected
    I guess what I’m trying to say is for you new guys and gal’s pay attention to the questions you’re being asked and make sure you are using the right load chart
    They are trying to trick you right out of your job
    Just saying
    It’s still a good trade and most likely close to being the highest paid on the job site
    Remember this if something goes wrong it’s always the crane operator’s fault

    • @RLoose9494
      @RLoose9494 Рік тому

      Agree 100%. The test really isn’t set up for learning it’s set up to trick you and fail you for a retest all about the cash.

  • @ArmandoGarcia-do9bz
    @ArmandoGarcia-do9bz Рік тому +5

    Don't you have to deduct only two part of the main,since you are using two for the lift.

    • @tieronecrane
      @tieronecrane  Рік тому +2

      Yes sir that’s correct and exactly how it was done. Go to mark 5:38 and it will show that portion.

    • @mitchescobar1060
      @mitchescobar1060 Рік тому +2

      Okay confused on the parts of line? Two parts excessive, so why or where do we come up with multiplying times four is it because it’s a total of four parts per line?

    • @tieronecrane
      @tieronecrane  Рік тому +3

      @@mitchescobar1060 because the rope is two pounds per foot. If the rope were one pound per foot we pile just multiply by two.

    • @RLoose9494
      @RLoose9494 Рік тому +2

      By multiplying by four you just skipped a step. However in the video you fail to explain that.

    • @maxriboss
      @maxriboss 13 днів тому

      That makes sense​@@tieronecrane

  • @manuelslp7264
    @manuelslp7264 Рік тому +3

    Very helpful video. I’m gonna try to get my Crain certification later this month do you know any webpage that I could go and study for my written exam

    • @tieronecrane
      @tieronecrane  Рік тому

      Hello, I offer online mobile crane prep courses at tieronecrane.com you can reach me via call or text at 210-400-9868 for more details. Thank you.

  • @noahday8642
    @noahday8642 3 місяці тому

    Fantastic thank you keep up the amazing work brother

    • @tieronecrane
      @tieronecrane  3 місяці тому

      Hey, I really appreciate that. I sure will. Thanks a lot.

  •  3 місяці тому

    you did 159 x all right 4

  • @jobster26
    @jobster26 11 днів тому

    My revised load chart for TLL does not look like that. Says revised on 12/22 but this video was posted a year ago.

    • @tieronecrane
      @tieronecrane  11 днів тому

      @@jobster26 this is not any part of the new load charts for cco. This is actually the old charts for the LBT cert cco doesn’t offer anymore. Still good information on load charts which is why I posted it years ago. All of my courses are up to date with all the current cco charts.

  • @jeremysisk1489
    @jeremysisk1489 10 місяців тому +1

    Do you have any practice materials to buy

  • @leesmith9942
    @leesmith9942 Рік тому

    Pretty sure you were supposed to go to 160' of line in the range diagram, instead of trying to guess it. That way you know your not gonna be under weight on your calculations. That's the way it was taught in school and on most other videos.

    • @tieronecrane
      @tieronecrane  Рік тому

      You definitely could do it that way. Just like to be precise!

  • @coachmannymh
    @coachmannymh Рік тому +1

    Hi I would like to seek some professional help on the new TLL load charts?

    • @tieronecrane
      @tieronecrane  Рік тому +1

      Of course. Shoot me an email at tobrien@tieronecrane.com I will be happy to assist.

  •  3 місяці тому

    You deducted for 4 parts I don't understand

  • @jeremysisk1489
    @jeremysisk1489 Рік тому

    Can you buy practice materials with these new ncco load charts

    • @tieronecrane
      @tieronecrane  Рік тому

      You sure can. All of the material is updated with the new load charts.

    • @jeremysisk1489
      @jeremysisk1489 10 місяців тому

      Where are the study materials at to order

    • @tieronecrane
      @tieronecrane  10 місяців тому

      @@jeremysisk1489 go to tieronecrane.com/shop/
      From there add whichever courses you need, purchase and create an account, then access the courses. You can use code osha20 for 20% off.

    • @jeremysisk1489
      @jeremysisk1489 10 місяців тому +1

      I’m looking for the new linkbelt load charts

    • @tieronecrane
      @tieronecrane  10 місяців тому

      @@jeremysisk1489 you can find the new generic TLL load charts on cco’s website. Just go to certifications, then written exam, then there will be a link for all of the load charts including the TLL charts you’re needing.

  • @maxriboss
    @maxriboss 13 днів тому

    You lost me on multiplying 4xparts of line if you only needed 2 parts.. why bother looking at all if you were just going to multiply all 4 parts