8ft Polytunnel | Setting Up Timber Base Rails & Screen | M0823

Поділитися
Вставка
  • Опубліковано 31 лип 2024
  • Find out about 8ft polytunnel setup with our detailed video, focusing on the critical component of side ventilation system installation.
    We begin with the installation of 8ft polytunnel timber side rails, providing a sturdy and reliable foundation for your structure. These timber rails aid in supporting the entire setup and ensuring durability and strength.
    A key section of this tutorial is the 8ft polytunnel ventilation gearbox setup. This system is a game-changer in managing the internal climate of your polytunnel. With this setup, you'll be able to easily adjust the airflow, ensuring that your plants receive the perfect amount of ventilation. This not only aids in temperature control but also significantly reduces the risk of disease and pests, promoting healthier plant growth.
    Throughout the video, we emphasise the importance of the side ventilation system installation. This feature is essential for creating an optimal growing environment inside your 8ft polytunnel, allowing for effective temperature regulation and ensuring that your plants have access to fresh air.
    By the end of this tutorial, you'll be well-equipped with the knowledge and skills to successfully complete your 8ft polytunnel setup, from laying the timber side rails to installing the ventilation gearbox. Be sure to stay until the end to learn about contact information for our construction services team, readily available for all matters regarding the building of your polytunnel.
    Chapters:
    0:00-0:13 - Introduction
    0:14-0:21 - Timber Base Rail Measurements
    0:22-2:15 - Measuring, Marking, and Adding Q Clips Around Corner Clamp
    2:16-2:43 - Securing Side Rail
    2:44-3:25 - Adding Another Section
    3:27-4:43 - How To Fit Side Rail From Door Post to Corner Hoop
    4:44-5:52 - Install Side Ventilation and Screen Ventilation
    5:53-7:05 - Fit Corner Polythene Panels
    7:06-7:14 - Important Info About Fitting Cover To A Timber Rail
    7:15-7:47 - Timber Post Measurements
    7:48-10:58 - Assemble Gearbox Winding System
    10:59-12:16 - Fix Ventilation Net and Corner Polythene Panels
    12:17-13:03 - Secure Ventilation Net to Base Rail
    13:04-13:43- Fixing Corner Polythene Panel to Doorpost and Corner Base Rail
    13:44-14:07 - Construction Services and Outro
    Stay connected with us for more valuable gardening and polytunnel construction tips through our social media channels:
    Facebook: / polytunnels
    Instagram: / firsttunnels
    X: / firsttunnels
    Visit our website: www.firsttunnels.co.uk/
    Explore our blog: blog.firsttunnels.co.uk/
  • Навчання та стиль

КОМЕНТАРІ •