Clair Ridge - topsides installation

Поділитися
Вставка
  • Опубліковано 20 лип 2015
  • 16,000 combined tonnes of weight. 3 modules. 75km out to sea. Watch this incredible ‪‎timelapse‬ of the topsides being installed on our Clair Ridge platform, offshore UK
  • Авто та транспорт

КОМЕНТАРІ • 9

  • @ungseopshin8822
    @ungseopshin8822 9 років тому +2

    I'm very proud to join this project as a HHI Construction team.
    Cheers.

  • @offshor
    @offshor 7 років тому +3

    honored to be involved into the LQ design

  • @opsinputlimited4083
    @opsinputlimited4083 8 років тому +1

    Operations captured on video like this are really powerful communication aids for those that lack offshore experience....thank you BP

  • @rolandnassar9865
    @rolandnassar9865 8 років тому +1

    Amazingly done and put together like a LEGO :)

  • @markcrawford1944
    @markcrawford1944 9 років тому +7

    Great video showing HMC expertise but sad thing is that BP chose to build these modules in south east asia rather than give contracts to uk oil and gas yards nothing to do with expertise all to do with costs. Uk yards struggle on as major companies like BP get the jonbs built abroad another sell out by the government and a major uk oil and gas company......

  • @jrarends1541
    @jrarends1541 9 років тому +1

    Proud that we are part of the final installation project supporting the Thialf with our CTV Seazip 4 (the small blue boat) www.seazip.com

  • @Pipexpx
    @Pipexpx 9 років тому

    What a great video! The yellow handrails that you see are phenolic FRP composite Multi Angular Rapid Railing Systems (MARRS®), designed & fabricated by us! You can find out more info here www.pipexpx.com/products/marrs-offshore-handrails/26/

  • @alisdairharrison
    @alisdairharrison 8 років тому

    David, are you involved in Claire Ridge? Alisdair

  • @ianwalton5156
    @ianwalton5156 9 років тому +2

    Build it Anywhere But Britain Petroleum strikes again.