Not exceeding 30 KMPH with certain conditions i.e. Point indication should be available in the panel & suitable clamps. But in this case Railway Board has directed speed limit over facing point as 15 KMPH, as it is an abnormal condition. I can explain the letter (Unified SR) given by Railway Board. I can’t change their words.
If only LSS failed but Direction of Traffic can be established, then only T/369(3b) & LP will follow 10 KMPH upto next Automatic Signal. But if Direction of Traffic cannot be established then stop Automatic working & One by one train will go on T/D 912 , First train-25/10 KMPH, Subsequent trains Normal Speed.
Thank you Sir for decision, On English understand each and every one.
You are welcome 😊
Very important and useful video for Railway Employees 😊
Yes, you are right😊
In our zone it is amendment slip 50 issued on 30.08.2024
Ok 👍
Sir if you have rules regarding NI work in Automatic signalling territory
Please discuss through your effective video
Sir in automatic block section passed signal at ON position speed plz explain sir
15/10 KMPH 😊
Tq u for ur reply sir
Its only 15 kmph
10 kmph only in tempestuous or sharp curve only
It is not for day and night
Sir ge good morning sir Emargency operation of VDU par Ak video banaye.
Ok 👍
SER me ek amendment hua hai
Kindly uspar ek video laiye sir
What is the Amendment number please?
Amendment no. 17 to G&SR (in SCR)
Sir please what is speed of train NI points , facing, trailing points
Not exceeding 30 KMPH with certain conditions i.e. Point indication should be available in the panel & suitable clamps.
But in this case Railway Board has directed speed limit over facing point as 15 KMPH, as it is an abnormal condition.
I can explain the letter (Unified SR) given by Railway Board. I can’t change their words.
Sir jee sadar pranaam
Sir abhi T/A912 kis situation m diya jayega.plz clear as per usr
That I am going to discuss in my next video i.e. Part-2
It is given during TIC with T/B 602
Here is the link to Part - 2 ua-cam.com/video/6-_-ey0JtPE/v-deo.html
Sir single line automatic section me Lss fail ho to kya authority same hai ya change huaa hai
Plct+T/A 912
Now T/D 912 , First Train 25/10 KMPH,
Second onwards Normal Speed.😊
If only LSS failed but Direction of Traffic can be established, then only T/369(3b) & LP will follow 10 KMPH upto next Automatic Signal.
But if Direction of Traffic cannot be established then stop Automatic working & One by one train will go on T/D 912 , First train-25/10 KMPH,
Subsequent trains Normal Speed.
Sir agar possible ho to as per usr saare authority k baare m ek video banyenge plz in auto section
Ok 👍
Good morning sirr
When the cc rake or premium rake is called overdue
If it is running in graceperiod,, it is called as overdue bpc
Good morning, you are right
Too much stretching the point
For beginners sometimes we need to stretch more 😊