In the year 2357, shortly after the Eglinton Crosstown LRT opens, Metrolinx will turn its attention to electrifying this line and adding double track in more places, to allow all-day two-way service on this line. It should be ready for its grand opening by about December 2923.
Great capture
I'm really going to miss the LRCs, I wish I had ridden them when they still tilted.
青空の下を走る列車が素敵。
チャンネル登録をしました。🐱
thanks Steve, I really like that new Siemens loco
What do you think the future of Richmomd Hill GO line will be? Tracks owned by CN in the north
In the year 2357, shortly after the Eglinton Crosstown LRT opens, Metrolinx will turn its attention to electrifying this line and adding double track in more places, to allow all-day two-way service on this line. It should be ready for its grand opening by about December 2923.
@@notsmoothsteve double plus good!
Is there a slow order here? I thought this section is 45mph?
Every GO or VIA train I see at this spot is going slowly - and this isn't a new thing. It's been that way for at least a few years.