Aspen Plus in English | Part 1 | 12 | Regression using experimental data

Поділитися
Вставка
  • Опубліковано 26 гру 2024

КОМЕНТАРІ • 15

  • @ramin8024
    @ramin8024 2 роки тому +1

    Hi and thanks,
    The STD deviation of the data is needed to calculate the STD deviation of the results of the regression so one knows the uncertainty of the estimated parameters (results) based on the uncertainty of the experimental data input.

  • @panoskb9405
    @panoskb9405 Рік тому

    How is it possible to use the results from this regression in our simulation and not the values from the data bank?

  • @RitaAlves27
    @RitaAlves27 2 роки тому +1

    Hi! I believe the standard deviation is there because of the regression method "maximum likelihood", which requires this information to minimize the objective function. Do you think this could be it?
    Thanks, Rita

    • @MGMohammed
      @MGMohammed  2 роки тому

      Hi! This sounds like a very good reason, I have not thought of it.
      Thanks for sharing it!

  • @r2whitebeard
    @r2whitebeard Рік тому

    BROOOOO you dont know how much i love u for this video!!!

  • @camillecastelain9997
    @camillecastelain9997 Рік тому

    Why is the STD % bigger for methanol Y (1%) than for methanol X (0,1%)?

  • @saluteyanomaly7628
    @saluteyanomaly7628 2 роки тому

    Hi, Mohammed. Do you know why my regression is giving me a warning that one parameter is at its upper/lower bound? And why the regression is working for one temperature but not the other?

  • @shuchenzhou1730
    @shuchenzhou1730 5 місяців тому

    Dude, how can you just copy and paste data from excel, my aspen not allows me do that at all!

  • @daelimefive
    @daelimefive 3 роки тому +1

    Good Video. Aspen Analysis seems to struggle with certain mixtures, especially when applying cubic-EOS for binary system of compounds, that have totally different properties, for instances alkanols and permanent gases.

  • @snehlatakumari2481
    @snehlatakumari2481 Рік тому

    Thank you so much. I finally got one of the things I was looking for. Hope to get other things in your other videos.

  • @upasanasingh4190
    @upasanasingh4190 3 роки тому +2

    hello it was very informative I wanted to know about procedure regarding regression using UNIFAC and unifac interaction parameter

  • @arvildasgupta7412
    @arvildasgupta7412 3 роки тому +1

    Sir, how to prepare for the Aspentech exam ?

  • @bhavikpatel6474
    @bhavikpatel6474 3 роки тому +1

    Hi can you make video on detailed batch distillation simulation

  • @felixwetzig2565
    @felixwetzig2565 3 роки тому

    Thanks for the content you provided. Especially the clarification on the element numbers was very helpful.
    I tried to evaluate regressed parameters aswell as build-in parameters with the "evaluate"-button located in the regression-input-sheet. But the resulting residuals are much higher than the residuals shown in the result-sheet of the regression. Changing the parameter-values of the inspected method seems not to affect the results of the evaluate-function aswell. The Aspen manual is not helpful about this issue either.
    Therefore I would greatly appreciate a any tips about this.
    Keep up the good woork!