Water cycles in thermal power plant (Closed loop cooling) Animation || Power Plant Process Animation

Поділитися
Вставка
  • Опубліковано 2 лис 2024

КОМЕНТАРІ • 8

  • @firstknowledge6319
    @firstknowledge6319 3 роки тому

    What is the full form of mal drain?

  • @superintendentengineeroper189
    @superintendentengineeroper189 5 років тому +2

    steam has to enter HP turbine first subsequently IP and LP .

    • @MeenuJainLalitpur
      @MeenuJainLalitpur  5 років тому

      Thanks for suggestion, In the same video, I will definitely make corrections as to put steam arrow in first HP turbine then IP followed by LP to condenser. I am really grateful to you for pointing this.

  • @naveentak2134
    @naveentak2134 5 років тому +1

    Hindi video nhi he kiya