I like the new logo but I will really miss the 1999 one. I hope the location near me keeps the old one as long as possible. Also what do you do with the old sign after replacing it?
@Hugobosz99 Not too bad. Came out to $1800 after taxes. The equipment was already on site. I charged tgis much because it had to be done the same day they called while I was booked a month out. 🤷♂️
@michaelc9507 I would never eat burger King it's not the same since the 90s. On top of that this burger King was doing a full remodel inside while selling food. Drywall dust everywhere🤢
I like the new logo but I will really miss the 1999 one. I hope the location near me keeps the old one as long as possible. Also what do you do with the old sign after replacing it?
What did you charge for a job like thos
What would your guess be?
No clue. U need that piece of equipment so I'm thinking at least 2k idk I can weld about anything but have no idea how much to charge
@Hugobosz99 Not too bad. Came out to $1800 after taxes. The equipment was already on site. I charged tgis much because it had to be done the same day they called while I was booked a month out. 🤷♂️
@@DannyWeldz
All the burgers and fries 🍟 you can eat?
Nice work keep burning them rods
@michaelc9507 I would never eat burger King it's not the same since the 90s. On top of that this burger King was doing a full remodel inside while selling food. Drywall dust everywhere🤢
Did you keep the old sign or trash it? My local Burger King started remodeling today it was already modern but the exterior is getting remodeled.
The business that contra Ted me called dibs.🤣 I wanted that bitch so bad😭
Is that considered a structural weld?