The captions were much clearer this time (in terms of the information they're trying to convey, not optically), thank you! I can't quite picture how the traffic is going to flow once it's all completed, but I am very much looking forward to when it is, the A3 slips on and off the M25 are appalling at the moment, but it's worth it.
Yes I agree at the moment there is little improvement, as the traffic lights at the roundabout cause traffic to back up and block the exits onto the M25. I’m guessing the traffic flow has been modelled to ensure the new arrangement will work, if not better plan in some flyovers.
Brilliant, looks like slips on are OK joining M25 but coming off from Leatherhead & Heathrow still have to negotiate traffic lights to join A3 southbound at present. I assume you were early this morning, but doesn't show the hard frost we had in Ripley, so maybe not that early!!! Thank you for the update.
Another good video. Lifting beams into place at Cockcrow bridge looks like it's on track for next weekend. Final go/no go will be mid-week but the current forecast for wind speed is well within limits. Still 3 beams to come from Ireland, due this week.
Very temporary I think. Eventually that little existing roundabout will be defunct when the new “giant” roundabout is opened and all the current temporary conflicting road “ stops” will become non-stop merging-in roads..( I hope 😁)..
A3N to M25E is still a nightmare.. We now divert south of Guildford to join at Leatherhead. Tried j10 midmorning early December and took 40 minutes of queuing to get to the roundabout
The captions were much clearer this time (in terms of the information they're trying to convey, not optically), thank you!
I can't quite picture how the traffic is going to flow once it's all completed, but I am very much looking forward to when it is, the A3 slips on and off the M25 are appalling at the moment, but it's worth it.
Yes I agree at the moment there is little improvement, as the traffic lights at the roundabout cause traffic to back up and block the exits onto the M25. I’m guessing the traffic flow has been modelled to ensure the new arrangement will work, if not better plan in some flyovers.
Great video! All of this will be finished this year!
I hope so!
By Summer 2025 It's Gonna Look Amazing Including Cheaking Around The Areas Of Changes For Everyone
Don't know what time this was filmed at? I haven't seen it that quiet since before they started the work.
Just before 11 on Sunday
Now the slip roads off, are now mostly complete. It will reduce the long queues of people leaving the M25.
Brilliant, looks like slips on are OK joining M25 but coming off from Leatherhead & Heathrow still have to negotiate traffic lights to join A3 southbound at present. I assume you were early this morning, but doesn't show the hard frost we had in Ripley, so maybe not that early!!! Thank you for the update.
This actually wasn’t that early it was about 11am there was not much traffic for some reason.
Going to watch this very closely, as I drove past this morning while you were filming. I am here somewhere 🔎
That would be cool if you can find yourself in it.
@@aviewthroughthelens at 2:09 I am in the queue at the red light from M25 to A3(S)
Another good video. Lifting beams into place at Cockcrow bridge looks like it's on track for next weekend. Final go/no go will be mid-week but the current forecast for wind speed is well within limits. Still 3 beams to come from Ireland, due this week.
Thanks again. I saw the beams in the old compound this morning while filming a Wisley video.
Not ever seen traffic move like this there and i go through there at all hours
I wish I was that good at AI to make it up
When is it going to be complete? I thought it was spring 2025
Feb I think
How come every video, the traffic is flowing all directions? Everything i go through there it's at a standstill! 😂
I have no idea, this was just before lunch on a Sunday and the m25 and a3 were both quiet.
Very temporary I think. Eventually that little existing roundabout will be defunct when the new “giant” roundabout is opened and all the current temporary conflicting road “ stops” will become non-stop merging-in roads..( I hope 😁)..
So you're to blame?
There’s a definite improvement on the A3 slip road onto the M25 west bound. From frequent Heahthrow traveler 😊😊😊😊
A3N to M25E is still a nightmare.. We now divert south of Guildford to join at Leatherhead. Tried j10 midmorning early December and took 40 minutes of queuing to get to the roundabout
so basically they have spent millions to build a bigger roundabout. What happened to idea of a sweeping bridge from A3 to M25(E)?
Time to stop this nonsense the world is literaly on fire Stop for your children and grand childrens sake. Please.