Bangalore Peripheral Ring Road Finally Happening ! Project Details, Map, Village, Route PRR LA work

Поділитися
Вставка
  • Опубліковано 30 лис 2024

КОМЕНТАРІ •

  • @SunilKumar-zg5hu
    @SunilKumar-zg5hu 2 роки тому +460

    I was in degree college when I heard about this project now I'm nearly 40 God save this state .....

    • @sabihatanveer8494
      @sabihatanveer8494 2 роки тому +35

      Let's see how old you're when it is completely finished 🤔👻

    • @SunilKumar-zg5hu
      @SunilKumar-zg5hu 2 роки тому +9

      @@sabihatanveer8494 LOL

    • @PradeepCRevanna
      @PradeepCRevanna 2 роки тому +6

      It's like interstellar

    • @vikrantmaheshwari6517
      @vikrantmaheshwari6517 2 роки тому +6

      @@sabihatanveer8494 I highly doubt if this will even start at first place. One of my friends own a land in the proposed PRR stretch and there's a very big problem. The govt. is offering them peanuts i.e., 60L per acre, people are not at all ready to accept this price. They should offer at least 7-8 per acre and only then they'll give up their land, but that will simply shoot the land acquisition cost like anything.

    • @debadaspujari5265
      @debadaspujari5265 2 роки тому +2

      Har har shambu

  • @zgeorgem
    @zgeorgem 2 роки тому +39

    my seven year old niece is excited for this because her future child can enjoy this in their college time

  • @MrLADVG
    @MrLADVG 2 роки тому +61

    The 70+KM road between Tumkur and Bangalore is the congestion with just 2 lanes, this needs to be widened to atleast 5 lines

    • @Ranchin697
      @Ranchin697 2 роки тому +8

      Yes agree with you…..almost 20 districts of karnataka and North Indian traffic meets here …I don’t know why still two lanes

    • @yourbff1484
      @yourbff1484 2 роки тому +2

      @@Ranchin697 cost of land acquisition is so high a report told they can lay half of highway in Karnataka 70-80% for land acquisition

    • @kirann6778
      @kirann6778 2 роки тому +3

      @@Ranchin697 True,,, for name sake its 2 lanes on one side. Half the lane is covered by two-wheelers and the cars/trucks overtaking don't want to be on the left side coz frequently they should hop b/w lanes so stick to the right lane irrespective of what speed you want to go and others cant cruise through over taking from left. Also, now potholes are increasing day by day.

    • @chethann2295
      @chethann2295 2 роки тому +2

      Atleast 10years beku. And land tumba costly.

    • @hmmer3471
      @hmmer3471 Рік тому

      It is happening now 3 lanes but the problems remain same once you leave suburb traffic can't be avoided

  • @vijaysrini27
    @vijaysrini27 2 роки тому +37

    Land cost has gone up considerably. Also, many areas have now come within city limits. So, it is no longer limited to farm land, but also well developed building, including highrise ones.

    • @sekharpriyansu
      @sekharpriyansu 2 роки тому

      Government is also collecting tax with respect to current price. They can easily buy with current price.

  • @amazon37mustafa9
    @amazon37mustafa9 2 роки тому +42

    And at same time Hyderabad undergoing RRR 340 km PRR already done a decade a ago . Hyderabad ORR is awesome

    • @vikrantmaheshwari6517
      @vikrantmaheshwari6517 2 роки тому +4

      I totally second you on this. I used to live in Bangalore and I now live in Hyderabad. The roads are amazing.

    • @ishitnayak4396
      @ishitnayak4396 2 роки тому +1

      Absolutely on point

    • @hjr0021
      @hjr0021 2 роки тому +3

      Hyderabad's infrastructure development is very much in sync with the influx of people to the city. ✌️

    • @vikrantmaheshwari6517
      @vikrantmaheshwari6517 2 роки тому +3

      @@hjr0021 Bang on!

  • @nikhilkay1
    @nikhilkay1 2 роки тому +43

    lot of Indian channels lack birds eye view of maps. You have done excellent work.

  • @srujanrated5633
    @srujanrated5633 2 роки тому +14

    Bangalore has railwY stations in
    Yelahanka
    Rajanukunte
    Hebbal
    White field
    Malleshwaram
    Majestic
    Contontment
    Yeshwantpura
    Banaswadi
    Krpuram
    Baiyappanahalli
    Devanahalli
    Doddaballapur
    Nelamangala
    Anekal
    Hosur
    But no local trains to anywhere.

  • @lifeisbeautiful104
    @lifeisbeautiful104 2 роки тому +47

    Infrastructure projects in Bangalore are super delayed. This project will take another 20 years to complete. In Bangalore only apartments & tech parks get completed on time because politicians have shares in real estate companies.

    • @lakshmanprasad2798
      @lakshmanprasad2798 Рік тому

      Now everyone can have share of the pie in infrastructure construction by investing in INVIT bonds! This has opens up opportunities for all creating a level playing field.

    • @paroxymal7688
      @paroxymal7688 Рік тому

      Bs it will never start

  • @nehapappu5059
    @nehapappu5059 2 роки тому +67

    As per latest news - there is still the issue of compensation payment for farmers. BDA is offering 60L per acre whereas the compensation as per 2013 land acquisition law is around 3-4cr per acre. This is not going to start anytime soon. The tender has been issued a second time without any change from the first version.

    • @RandomVideos-xc5sh
      @RandomVideos-xc5sh 2 роки тому +5

      Yes and bitter truth is the land of 2000sqft costs around 60L now depending on area. What about the rest 41560sqft? Pure politics and worst BDA planning. Affecting land owners life by providing pathetic compensation. As one of the affected farmer’s son, I feel so bad about this. I pray that this project should never happen.

    • @funbegins2371
      @funbegins2371 2 роки тому

      its going to start very soon, they will be forcefully evicted and their properties demolished if they don't vacate the land

    • @itdoesntmatter9923
      @itdoesntmatter9923 2 роки тому +2

      @@RandomVideos-xc5sh prices in kogilu right next to nh7 is going for 75 lacs for 30*40 plot.. the prices are sky high and acre goes anywhere around 20-30 cr

    • @RandomVideos-xc5sh
      @RandomVideos-xc5sh 2 роки тому +1

      @@itdoesntmatter9923 Exactly brother. It’s daylight robbery happening, these people talk about affected landlords should accept compensation. But they’ll only know how it feels if they had to lose their land.

    • @banditonehundred
      @banditonehundred 2 роки тому +1

      High quality governance in our High Tech capital 😡

  • @jaycenaidoo7848
    @jaycenaidoo7848 2 роки тому +6

    Building roads and roadside water drainage is design from heaven

  • @mushamajay9486
    @mushamajay9486 2 роки тому +10

    Still it is behind the Hyd ring road in Technology wise even Hyd ORR completed in 2013

    • @narutohenaruto
      @narutohenaruto Рік тому

      Bengaluru was the favorite for investors and companies. But the city's original design wasn't made for all that. Its reactive than proactive here. Metros will compensate.

  • @banditonehundred
    @banditonehundred 2 роки тому +8

    Please come to Hyderabad, we already have a nice ring road, thanks to Mr Naidu 🙏

    • @mahesh7194
      @mahesh7194 Рік тому

      Naidu is a fool he seperated with PM for his greed.

    • @akashnv7403
      @akashnv7403 Рік тому

      Pora **** Bangalore Is The Best ...

  • @arunkumarm18
    @arunkumarm18 2 роки тому +18

    This should have been done 30years ago now buying the land from public and construction of Roads on that, the govt will have to pay huge amount.

    • @narayanaswamytp2965
      @narayanaswamytp2965 2 роки тому

      Yes included nice project

    • @vinayvenkatesh7924
      @vinayvenkatesh7924 2 роки тому

      BDA paying farmers 26years old land price for acquisition, it’s a huge burden to farmers loosing there livelihood . BDA don’t have money, they give private companies to buy n build road for 50yr lease. It’s like government officers making a real estate deal with private parties using our Law loopholes.

    • @swapnilnatu
      @swapnilnatu 2 роки тому

      Tax payers r paying sky high taxes any how, Govv will increase taxes even higher in all possible ways & put entire burdon on common tax payers.

    • @secondaryinbox7548
      @secondaryinbox7548 2 роки тому

      @maverick who else to vote? Honest question. Don't reply with sarcastic smileys crap. Seriously whom to vote?

  • @ArunKumar7
    @ArunKumar7 2 роки тому +3

    Thumbs up for saying all villages 🤩

  • @travelandexplore2411
    @travelandexplore2411 Рік тому +6

    In this segment hyderabad is far ahead... Hyderabad Ring road is a masterpiece

  • @chinnadora5705
    @chinnadora5705 Рік тому +1

    Good information Hussein jee. చాలా బాగా చెప్పారు..

  • @rajeshr7838
    @rajeshr7838 2 роки тому +19

    PRR is one of the bad example to showcase in universities demonstrating how worst one could plan on the development of city with many loopholes that includes political influences, political motivation, farmers agitation, biggest failure on rehabilitation plan for potential land losers, unethical rules and policies, frustrating delays, pathetic outbound communication, lot of unknowns.
    I wish this project was picked by National Highways. This project is really not meant for BDA that is fully under local political pressure. They should simply focus on ongoing road developments that includes STRR, Metro, better road maintenance within/outskirts of city. PRR is destructive in all ways to common people.

    • @hemanthraj5774
      @hemanthraj5774 2 роки тому +3

      Well said sir.. I think some of the politicians pushing it for their own benifits. If they were really interested in city development, they would have probably completed it before 2010 by giving proper compansation to farmers.

    • @hemanthraj5774
      @hemanthraj5774 2 роки тому

      @@shivrajkumar.b.c8075 any source of news?

    • @sathyanarayanakrishnappa6582
      @sathyanarayanakrishnappa6582 2 роки тому

      Also, we are suffering due to hurdles created by then politicians in the implementation of Bengaluru to Mysore Corridor by NICE, but it is still pending, but about a decade ago state government made 4 lane road to Mysore, though the project was to be implemented by NICE. Now same old road being made six lane high way under National High Way Authorities, what a waste of tax payers money.

    • @Kumar-zx8mj
      @Kumar-zx8mj Рік тому

      BDA as an organization should be shut down.... Highly corrupt organization in entire nation....

  • @chethu69
    @chethu69 2 роки тому +5

    This is the need of the hour for Bangalore

  • @satyam-evajayate438
    @satyam-evajayate438 2 роки тому +5

    Thank you. We can avoid purchase of land real-estate in the near by areas, to avoid high costs.

  • @abhinavsrivastava5881
    @abhinavsrivastava5881 2 роки тому +1

    Bhai aapne jagaho ke naam itne asaani se kaise le liye sab..impressive.

  • @sashidharan1192
    @sashidharan1192 2 роки тому +4

    Thank bro for having English subtitles. Which help to understand non Hindi states guys

  • @mytime_is_now
    @mytime_is_now 2 роки тому +4

    Hyderabad is way ahead in terms of infrastructure so it's too late

  • @deepusmiles272
    @deepusmiles272 2 роки тому +4

    Just by hearing this I brought the land in 2011. Till now no updates. Luckily due to other developments around prices hiked.

  • @m.r.raghunath2577
    @m.r.raghunath2577 2 роки тому +1

    This will a blessing as I live close to Byalkere.

  • @DasGaneshRAKESH
    @DasGaneshRAKESH 2 роки тому +3

    The only solution to handle rapid development, is to join 2 cities, Bangalore and Mysore, into 1 big mega city, its happening as we speak

    • @ravicg1070
      @ravicg1070 Рік тому

      I think In future it is going to happen. Distance is about 145 Km. A Giga City will evolve in the future by combining Bangaluru and Mysure.

  • @praj204
    @praj204 2 роки тому +3

    Comprehensive and well researched

  • @vijayagopalvedapudi4100
    @vijayagopalvedapudi4100 Рік тому +2

    Excellent and extremely informative videos of Hussain. Keep it up.

  • @Sanaatananbhaarateeya
    @Sanaatananbhaarateeya 2 роки тому +2

    very much informative , thank you

  • @jaycenaidoo7848
    @jaycenaidoo7848 2 роки тому +2

    Will be a blessing to bangalore The building of roads infrastructure must done in the shortest possible time span. Speed and quality is profitable

    • @vikrantmaheshwari6517
      @vikrantmaheshwari6517 2 роки тому

      One of my friends own a land in the proposed PRR stretch and there's a very big problem. The govt. is offering them peanuts i.e., 60L per acre, people are not at all ready to accept this price. They should offer at least 7-8 per acre and only then they'll give up their land, but that will simply shoot the land acquisition cost like anything.

    • @nandkumarallathadi6495
      @nandkumarallathadi6495 Рік тому

      ​@@vikrantmaheshwari65178

  • @AjayTiwari-en9nz
    @AjayTiwari-en9nz Рік тому +1

    ❤ Bengaluru ❤

  • @shanmugammanickam6997
    @shanmugammanickam6997 Рік тому +1

    Why not ambulance lane separate line in this peri perial ring road mark as emergency road

  • @vasu0870
    @vasu0870 Рік тому +6

    Thanks to Chandra babu Naidu Garu, Hyderabad ORR was envisioned long back and was laid with international standards. What an infrastructure he has built in Hyderabad way ahead than many other cities in India

  • @AjayKumarN-cy3ef
    @AjayKumarN-cy3ef Рік тому +2

    Hussain bro , pls do videos future development on Bidadi ,Bangalore

  • @kalyannnBH
    @kalyannnBH 2 роки тому +3

    Please talk about Hyderabad outer ring road, new service roads , solar cycle track

  • @chandrashekarc8189
    @chandrashekarc8189 2 роки тому +3

    At present the Bangalore development is already reached to this proposed PRR. The state government as to prepare another ring road connecting Doddabalapur, nelamangla, ramnagara, kanakpura, Hosur ,Malur and Doddabalapur and I am very much sure this will happen in future.

    • @karthickselvam9716
      @karthickselvam9716 2 роки тому

      STRR??!! Already in progress.

    • @ashwathbc8816
      @ashwathbc8816 2 роки тому +1

      already STRR under construction 288 km same locations

    • @venureddy5131
      @venureddy5131 2 роки тому

      It takes another 5 to 10 years to complete need to speed up as Hyderabad.. Hyderabad Pandit Nehru Outer ring road was inaugurated in 2010 with 158 km...now they are going a head with Regional Ring Road with 330 Km ..at present with ORR no vehicle need not enter the city if they want to travel from Bangalore to nagpur or from Vijayawada to Bmumbai...apart from this they have pv Narasimha Rao elevated express way from mehidipatnam to aramgarh

  • @jayanthkumar1123
    @jayanthkumar1123 2 роки тому +2

    Nice information dude...👏👏👏

  • @Samuelgatesvideo
    @Samuelgatesvideo 2 роки тому +1

    Really appreciate your available information video🎥

  • @jaycenaidoo7848
    @jaycenaidoo7848 2 роки тому +4

    Bangalore road and rail infrastructure must be people friendly

  • @mrk.reddy.5197
    @mrk.reddy.5197 2 роки тому +3

    🙏 Very Informative, thank you Sir. Keep it up ! Best wishes !

  • @SeekingBuddha21
    @SeekingBuddha21 2 роки тому +1

    I live at Nagondanhalli, and have been hearing about it for 10 years

  • @shivaputrappagarwad3890
    @shivaputrappagarwad3890 2 роки тому +4

    Instead of paying land cost to land owners it is better to treat the land owners as the share holders in the project to the extent of there land contribution . Let them get dividends on their shares for next fifty years.
    Otherwise the ppp with foreign investment for will be burden on India.

    • @Kumar-zx8mj
      @Kumar-zx8mj Рік тому

      Land Owners don't believe in Govt which changes rules as and when. Needed.... Leave aside for 30 years, they won't accept dividend for next 5 years as well.... This project might not take off at all...

    • @shivaputrappagarwad3890
      @shivaputrappagarwad3890 Рік тому

      @@Kumar-zx8mj
      It is all imagination . Our farmers are prudent. So far no farmers were taken as share holders in the project in lieu of their land.

  • @sangannadoddamani4841
    @sangannadoddamani4841 Рік тому +1

    Good information.

  • @prince30
    @prince30 2 роки тому +1

    Vry vry informative video🎥 h bro... ❤❤❤🥰🥰🥰

  • @jeevakarunyen2447
    @jeevakarunyen2447 Рік тому +1

    Any changes in PRR route map near old madras road ?

  • @LetsClarifyIt
    @LetsClarifyIt 2 роки тому +3

    by the time it gets constructed it will be inner ring road in Bangalore not peri pheral

  • @manjunathm3815
    @manjunathm3815 2 роки тому +1

    Good video it's very informative...

  • @ganesh7hillsstereo373
    @ganesh7hillsstereo373 2 роки тому +1

    Very neatly explained

  • @badrinair
    @badrinair Рік тому +1

    Good one, thank you

  • @juejuego7929
    @juejuego7929 2 роки тому +5

    Who has told you that this is happening? Nothing is moving boss, do your research properly, the farmers are not ready to give their as land as BDA proposed compensation as per 2013 rates.

  • @dadapeerdadapeer1857
    @dadapeerdadapeer1857 2 роки тому +2

    Very informative video. Wonderful 😊

  • @yathichandra
    @yathichandra 9 місяців тому

    Please make video on PRR 2 connecting Hosur Road , Mysore Road , Magadi Road , Tumkur Road.. there was a recent tender floated by BDA to prepare DPR..

  • @JaiD0427
    @JaiD0427 2 роки тому +3

    I don’t think this is happening anytime soon.
    Haven’t heard any update on the latest Tender issues (which includes Acquiring land + BOT).
    Latest news is - Farmers have NOT agreed to the SC Decision. Govt will have to part with 14K crore to acquire the land - this is the ONLY SOLUTION!

    • @Kumar-zx8mj
      @Kumar-zx8mj Рік тому +1

      Yes, you are right.... There's no vision by Politicians..... The project could be cancelled once Satellite Town ring road takes off....

  • @sachinoommen9160
    @sachinoommen9160 2 роки тому +3

    Where can we see the exact detailed route map..

  • @sathisham9021
    @sathisham9021 2 роки тому

    Finally what is the conclusion? .. Project is On....

  • @bharindia
    @bharindia 2 роки тому +2

    hi, where did you get this exact maps and areas they are going to pass through? i didnt know it would pass through singena agrahara!!

  • @vaibhavverma2067
    @vaibhavverma2067 2 роки тому +2

    Great explanation man❤️

  • @ashwathbc8816
    @ashwathbc8816 2 роки тому

    289 km STRR, 65 km PRR+51km NR total 405 km road infrastructure + blr,mys 10 line expressway+blr, chennai expressway

  • @SNabeel004
    @SNabeel004 2 роки тому +2

    Varthur ❤️❤️

  • @chethangowdagowda181
    @chethangowdagowda181 2 роки тому +2

    Governments gives the statement of encouraging agriculture, the next day they will plan for the acquisition of fertile agriculture lands for development purposes. This is what the actual fact of our country.

    • @arunsar7893
      @arunsar7893 2 роки тому +1

      And that's a good thing.

    • @hmmer3471
      @hmmer3471 Рік тому

      Road ye illa andre ninu beldidu yen madtya, this road needed very much on growing blore

  • @SunilKumar-zg5hu
    @SunilKumar-zg5hu 2 роки тому +7

    Kumarswamy showed a lot of interest in this project start but he s never been in power Long term , These stupid Environmental activists stop these projects , feel like living in a cage in Bangalore there is soo much of traffic and pollution it has become unbearable

    • @vikrantmaheshwari6517
      @vikrantmaheshwari6517 2 роки тому

      Govt. are offering 60L per acre with 2013 rates, which sane person would accept it at this price?

  • @SayIamYou
    @SayIamYou 2 роки тому +2

    If possible, please add English subtitles. Thank you

  • @Manoj-qi5rb
    @Manoj-qi5rb 2 роки тому +2

    Thank you sir

  • @samarthkulkarni4996
    @samarthkulkarni4996 2 роки тому +1

    Pune to Bengaluru new Highway par video banao please

  • @savinay999
    @savinay999 Рік тому +1

    Finally...blr traffic is mad

  • @rajeevmallikarjuna8443
    @rajeevmallikarjuna8443 2 роки тому +2

    If do with English subtitles or English voice it would be more informative

  • @tejpalsingh8438
    @tejpalsingh8438 2 роки тому

    Metros are the way, can't stress it enough.
    Do it just like the Mumbai where they are making multiple metro lines to decongest the roads

  • @rajanikb
    @rajanikb Рік тому

    This very important to build government need to think very seriously with war foot action

  • @channaiahc8237
    @channaiahc8237 2 роки тому +1

    Always projects are delay due to so many things involved at least now make it fast so that people can utilize the same at the earliest.

  • @fayazpasha907
    @fayazpasha907 2 роки тому +1

    Nice vedio why road ring road nahi hai end nice road se connect horaha hai

  • @swapnilnatu
    @swapnilnatu 2 роки тому +3

    Once this project is over, including Nice Road, all toll charges should be removed at least. If people have to pay income taxes, Road Taxes+ over & above toll charges for next 50 years, people will be left with an option to use only Foot paths..!

    • @sathyanarayanakrishnappa6582
      @sathyanarayanakrishnappa6582 2 роки тому +2

      Sir your views are one hundred per cent correct, I still doubt this project implementation. This was planned 20 years ago, it is moving snail speed.

    • @itdoesntmatter9923
      @itdoesntmatter9923 2 роки тому

      @@sathyanarayanakrishnappa6582 they want to compensate 60l for 1 acre. That's peanuts. a plot of 30*40 close to nh7 goes around 75 lacs.

  • @alamwasim3028
    @alamwasim3028 2 роки тому +1

    Sup work 🔥🔥🔥

  • @nizamali7027
    @nizamali7027 Рік тому +1

    Good video

  • @siddharth0401
    @siddharth0401 7 місяців тому

    While a generation of IT guys hv been sold high rise apartments giving hopes that the apartment has connectivity with this road

  • @SantoshPatwaLive
    @SantoshPatwaLive 2 роки тому +1

    Nice brother

  • @nithins3895
    @nithins3895 2 роки тому +1

    Please make a video on Ongoing Mysore projects

  • @TheIndianYogiBear
    @TheIndianYogiBear 10 місяців тому

    Any updates on this project recently?

  • @jaycenaidoo7848
    @jaycenaidoo7848 2 роки тому +1

    Create a trust account for farmers. Framer’s must benefit by doing good deeds for life.Education and help the poorest

  • @rameshr6827
    @rameshr6827 2 роки тому +1

    It is not going to any light. The cost has increased exorbitantantly it os not feasible also.
    Govt should go for satellite cities atleat 50 or 60 km away from Bangalore outer city limit so that the congestion can be reduced. They can also plan for suburban trains connecting to metro train stations so that the cost can be minimum it will also help to develop the state uniformly

  • @gangadharaiahs2259
    @gangadharaiahs2259 Рік тому

    WHEN THIS PLAN WILL.BE COMPLETED?

  • @harshathanreddy717
    @harshathanreddy717 2 роки тому

    Pls upload the current information of nstrr 948a .

  • @muppiripavan3808
    @muppiripavan3808 2 роки тому

    Hi is there any latest update about the Bangalore chennai expressway?

  • @puliraju9222
    @puliraju9222 2 роки тому

    this route not ending at hebbagudi to huskur

  • @opinonated_soul
    @opinonated_soul 2 роки тому

    First complete koramangla flyover pending from last 10 years....

    • @Kumar-zx8mj
      @Kumar-zx8mj Рік тому

      Simplex infra is bankrupt and people in govt are not interested....

  • @vpk21
    @vpk21 Рік тому +1

    Nothing happened in last one year 😒 The karnataka state government and beuracrats are not good enough to make it happen!! Give it NHAI they will complete it in 2 years !!

  • @yourcareer8977
    @yourcareer8977 8 місяців тому

    Hi can you pls share me shambognahalli bannerghatta road map ... i want to see whether my home cross this road side 😢

  • @RaviVarma-ey5cv
    @RaviVarma-ey5cv 2 роки тому +1

    Nice Presentation... But in reality, this project may never take off.... I have been hearing and reading about this project since my childhood. There are plenty of hurdles, problems, issues, and opposition from all quarters. Political parties and politicians make statements and issue government orders only to fool the people.

  • @SaviourSword995
    @SaviourSword995 Рік тому +1

    One thing is for sure and people will flag me but farmers are the real reason why infrastructure development is taking a slow pace.
    Well some say it effects them. Well what you want to say to those office and factory workers who are contributing to the economy. As long as these farmers will stick to these ridiculous demands, nothing will go forward.

  • @travofood
    @travofood Рік тому

    Is it possible to share the map ? Need to know certain details . This would be of great help.

    • @vinodreddykareti515
      @vinodreddykareti515 Рік тому

      bdabangalore.org/uploads/files/PRR/TUMKURU%20NICE%20ROAD%20TO%20HOSUR%20NICE%20ROAD%20ALIGNMENT-%20Final-06-4-22.pdf

  • @sathyanarayanakrishnappa6582
    @sathyanarayanakrishnappa6582 2 роки тому +1

    By looking at the way in which the previous and current governments initiative, I think this will not take off. This is under planning for more than a two decades and still the ground work yet start. I fully doubt it's implementation in the near future.

  • @beereshgm1013
    @beereshgm1013 2 роки тому +2

    This project commencement will take another 10 years n will be completed after 30 years

  • @hemanthraj5774
    @hemanthraj5774 2 роки тому +2

    This PRR will never gonna happen. Farmers are protesting this from very long time. Until they fix good compansation, it's likely to go hold for another 1 r 2 decades.

    • @Kumar-zx8mj
      @Kumar-zx8mj Рік тому

      Land Owners would agree for 20 to 30 crore per acre... 14000 crore total Land acquisition cost...

    • @Kumar-zx8mj
      @Kumar-zx8mj Рік тому

      Imagine what would be the toll of this happens

  • @ramalingamdara6262
    @ramalingamdara6262 8 місяців тому

    Video does not cover likely vehicle load on this root.

  • @HemanthKumar-lb4xt
    @HemanthKumar-lb4xt 2 роки тому

    The line shown is not PRR its the current outer ring road

  • @IndianSrMan
    @IndianSrMan Рік тому +1

    Good video with detailed information. Modi government doesn't care for Karnataka. So very little progress is made and everything still on drawing board. Bangalore was renamed as Bengaluru long ago . Are you still sleeping?
    Karnataka is not a priority for Modi and gadkari. So don't expect anything but still vote for BJP? So solution is kannadigas should reject both BJP and Congress (who are responsible for the pathetic state of Bengaluru) and elect a kannada party ( not JDS which is just a regional party) to power. Will Kannadigas wake up ( or be fooled by nationalism, Hinduism or castism slogans of these parties )?

    • @a9a9d
      @a9a9d Рік тому

      PRR is a state govt project . How can the central govt interface ? Educate yourself about the federal structure .... State highways come under state govt only .

  • @DecentRavi
    @DecentRavi 2 роки тому +1

    It's Bengaluru....
    Avoid usage of Bangalore word.

  • @harikrishna9672
    @harikrishna9672 2 роки тому +1

    Nice🙏

  • @nehapappu5059
    @nehapappu5059 2 роки тому +1

    STRR will be ready well before this

  • @GovindRajan-n2e
    @GovindRajan-n2e 6 місяців тому

    No trees tall on all roads no cyment blocks large to support in all roads side muds rain will spoil all roads when it happens so start infra rbi

  • @ravikumars5164
    @ravikumars5164 2 роки тому +1

    hope this time it finishes soon. just wondering there is another road planned srr(satellite ring road), not sure they will merge both entirely or in some areas

  • @bguruswamy7099
    @bguruswamy7099 2 роки тому +2

    Bro not Banglore it is Bengaluru