Pt.Willunga Esplanade Sarah Homes Video 3

Поділитися
Вставка
  • Опубліковано 26 чер 2024
  • This video sees the uppers floor frame completed upper wall frame braced
    with the Truss Roof stood up with the required Bracing and Tie Downs.
    Floor and Decking installed
    Lower windows installed and cladding installed, upper windows installed
    with DPC Plastic places on the sides of each window and door install.
    To facilitate this a cyclone Scaffold has been installed for safety of all workers on site.
    Warning this recording was taken with 20-30km onshore winds or more
    which is why is bracing and tiedowns are required.