COST LOADING FROM BOQ IN PRIMAVERA P6 || PRIMAVERA P6 TUTORIALS

Поділитися
Вставка
  • Опубліковано 2 гру 2024

КОМЕНТАРІ • 30

  • @engineerkhan6458
    @engineerkhan6458 3 роки тому +1

    Excellent piece of work. 👍👍👍

  • @Mahrash
    @Mahrash 3 роки тому +1

    Please explain when you are creating the material resource when entering values for price/unit Default units/time and Max units/Time you are putting values as 1 unit also budgeted material units are equal to budgeted cost, Budgeted cost = budget units x price/unit, how and why you are considering budgeted units = Budgeted Cost

  • @leadconsulting
    @leadconsulting 3 роки тому +1

    Hello Sir, It is very informative. Pls also explain how to load BOQ item and its rate to get budgeted cost. Company financials / performance are manage like this only.

  • @technical_wazir
    @technical_wazir 9 місяців тому

    if there is large difference in Civil work of GF and FF then how to add cost. I mean Civil works are not always same at each floor

  • @vvvv631
    @vvvv631 10 місяців тому

    Im facing a duration change while adding the resourse. Do you have a solution for it?

    • @SuryanarayananRevathi
      @SuryanarayananRevathi 9 місяців тому +1

      Check your Duration Type , it will be in fixed units or fixed units/time so duration is changing wen you add resource .

  • @s.bhaskar1736
    @s.bhaskar1736 3 роки тому

    very clear explanation! Just curious, will this work with labor resources? As I understand that the unit %-age completion will roll-up to WBS level for labor resources only.

  • @isfhahanachmaddzulqarnain
    @isfhahanachmaddzulqarnain Рік тому

    Thanks!

  • @officialjoramkoloriang5200
    @officialjoramkoloriang5200 3 роки тому +3

    Please make more videos on primavera with much more details,
    Specially on budget cost and cost control.
    This video is not much easy to understand please also focus on that treat us as non knowing people.🙏🙏🙏

  • @ahmadaltayeb1983
    @ahmadaltayeb1983 2 роки тому

    Dear Sir
    I had a problem in Primavera P6, the problem is Performance % Complete and Schedule % Complete, can not roll up to Project level, but it is already rolling up to WBS Level, and please note that I already assign materials on activities.
    Please anyone can give advice, to solve this problem, I use Ver. 19.12 and Ver. 21.12.
    Thanks

  • @AtulSingh-kl6tg
    @AtulSingh-kl6tg 3 роки тому +1

    Bhai, pls make some video on planning/scheduling scope in BIM, What are the softwares and how this Primavera integrate on that.. Construction industries is moving very fast on BIM modelling especially infra

  • @nazirahmad4712
    @nazirahmad4712 3 роки тому

    Hi, sir, you have great videos with real time topics. How do we put commodities in P6 and progress them. Can you add a video with commodities? If possible please.
    Please advise
    🙏

  • @imdadhsheik138
    @imdadhsheik138 2 роки тому

    Hai sir firstly thank you soo much in this video u have shown how to import from excel to p6 could u make the video on cost loading for atleast 4k activities.....

    • @dptutorials
      @dptutorials  2 роки тому

      Thanks a lot. Could you please share the raw files for showing it up.

  • @xplorooo
    @xplorooo 3 місяці тому

  • @ShoaibKhan-ep1iv
    @ShoaibKhan-ep1iv 3 роки тому +1

    great work dear but it is not understandable in this short video. plz make a complete video that how we will import all activities from BOQ into P6 and schedule it within budgeted cost

  • @sameralhafez6991
    @sameralhafez6991 7 місяців тому

    What do u mean by BOQ ILis nothing

  • @ravindrankrishnan2964
    @ravindrankrishnan2964 2 роки тому

    Good explanation. The same pls put for MS project also....

  • @Aryanss5743
    @Aryanss5743 2 роки тому

    How to distribute cost for big projects and how to load on p6 if we have 1000s of activities

  • @mahansor8295
    @mahansor8295 3 роки тому +1

    🙏🙏👍

  • @rakeshranjan7525
    @rakeshranjan7525 2 роки тому

    Sir, video is not visible...