French Valley Parkway Phase 2 Project Overview

Поділитися
Вставка
  • Опубліковано 4 лют 2025

КОМЕНТАРІ • 27

  • @esjeep3952
    @esjeep3952 2 роки тому +10

    The ramp/bridge after the on ramp to the I-15 should be situated on the left and the ramp to the I-215 should be on the right. As a driver/user this makes more sense. I want to go North on I-15 so instinctually I want to be in the left lane (not the right lane). If I want to go North on I-215 I instinctually want to be on the right lane (not the left lane). If people have to think too much than there WILL be accidents.

    • @kareyreuben3869
      @kareyreuben3869 Рік тому +1

      I hope the designers read your comment. Excellent point.

  • @ginamyers8582
    @ginamyers8582 3 роки тому

    Soooo happy to see this is happening!

  • @heavyinkprinting1367
    @heavyinkprinting1367 2 роки тому

    Can't wait fo this to happen.

  • @PapaFoxtrot2002
    @PapaFoxtrot2002 4 роки тому +7

    Completion by 2023?!?!!! What a HUGE bummer. The current interchange adds about 60-90 minutes to my commute EVERYDAY. This project needs fast tracked!!!!

    • @PJproject
      @PJproject 2 роки тому +1

      For sure, cut the red tape and get it done!

    • @GhosTigre
      @GhosTigre Рік тому +1

      @@PapaFoxtrot2002she didn’t? 🤯

    • @GhosTigre
      @GhosTigre 7 місяців тому

      @@PapaFoxtrot2002no reply still? I just passed by rn they working lol

    • @PapaFoxtrot2002
      @PapaFoxtrot2002 7 місяців тому

      @@GhosTigre huh?

    • @christiadaliana3043
      @christiadaliana3043 Місяць тому

      About to be 2025

  • @detectiveawesome3579
    @detectiveawesome3579 4 роки тому

    Can’t wait 👍

  • @johnhughes9019
    @johnhughes9019 Рік тому +1

    Finally renovating the *CA* *71* - *15W* / *15E* junction, eh ?

  • @appleguy1986
    @appleguy1986 4 роки тому

    Yes!!

  • @JefeJeffAlmanza
    @JefeJeffAlmanza 2 роки тому +2

    Please get this fuckin’ shit done. So sick of this traffic.

  • @jimbadazz
    @jimbadazz 2 роки тому

    After phase two, how are you supposed to exit French Valley going North Bound...

  • @Jose-uv2uw
    @Jose-uv2uw 3 роки тому

    When is this project going to start..

  • @JustMe619toby
    @JustMe619toby 2 роки тому

    Any updates on this???

  • @12nbalover
    @12nbalover 5 років тому

    Genius

  • @kellyl1844
    @kellyl1844 2 роки тому

    Is this still happening?

  • @adamjhuber
    @adamjhuber 11 місяців тому

    2024 and phase 2 isn’t even close to being finished. Just a few years behind schedule.

  • @kerrifernandez2946
    @kerrifernandez2946 3 роки тому

    Trucks staying on the 15 will still have to make their way over to the left lanes which adds to the cluster of madness and so far everything done on the southbound side hasn’t helped at all… But great! At least something is being attempted. Should’ve been done soooo many years ago.

  • @vegalucas4664
    @vegalucas4664 Рік тому +1

    They didn’t have to pay for a study they could’ve just asked or drove that area

  • @luvstatus1
    @luvstatus1 3 роки тому

    What's the update?.... I see nothing yet. They haven't even started

  • @PJproject
    @PJproject 2 роки тому +1

    So you’ll have northbound 15 traffic entering from Winchester now merging onto the 15 at the same area where northbound 15 drivers are merging over to exit Murrieta Hot Springs. Sounds like you’re just creating a new bottle net up river.

  • @williamortiz1134
    @williamortiz1134 Рік тому

    😂😂