The ramp/bridge after the on ramp to the I-15 should be situated on the left and the ramp to the I-215 should be on the right. As a driver/user this makes more sense. I want to go North on I-15 so instinctually I want to be in the left lane (not the right lane). If I want to go North on I-215 I instinctually want to be on the right lane (not the left lane). If people have to think too much than there WILL be accidents.
Completion by 2023?!?!!! What a HUGE bummer. The current interchange adds about 60-90 minutes to my commute EVERYDAY. This project needs fast tracked!!!!
Trucks staying on the 15 will still have to make their way over to the left lanes which adds to the cluster of madness and so far everything done on the southbound side hasn’t helped at all… But great! At least something is being attempted. Should’ve been done soooo many years ago.
So you’ll have northbound 15 traffic entering from Winchester now merging onto the 15 at the same area where northbound 15 drivers are merging over to exit Murrieta Hot Springs. Sounds like you’re just creating a new bottle net up river.
The ramp/bridge after the on ramp to the I-15 should be situated on the left and the ramp to the I-215 should be on the right. As a driver/user this makes more sense. I want to go North on I-15 so instinctually I want to be in the left lane (not the right lane). If I want to go North on I-215 I instinctually want to be on the right lane (not the left lane). If people have to think too much than there WILL be accidents.
I hope the designers read your comment. Excellent point.
Soooo happy to see this is happening!
Can't wait fo this to happen.
Completion by 2023?!?!!! What a HUGE bummer. The current interchange adds about 60-90 minutes to my commute EVERYDAY. This project needs fast tracked!!!!
For sure, cut the red tape and get it done!
@@PapaFoxtrot2002she didn’t? 🤯
@@PapaFoxtrot2002no reply still? I just passed by rn they working lol
@@GhosTigre huh?
About to be 2025
Can’t wait 👍
Finally renovating the *CA* *71* - *15W* / *15E* junction, eh ?
Yes!!
Please get this fuckin’ shit done. So sick of this traffic.
After phase two, how are you supposed to exit French Valley going North Bound...
When is this project going to start..
Any updates on this???
Genius
Is this still happening?
2024 and phase 2 isn’t even close to being finished. Just a few years behind schedule.
Trucks staying on the 15 will still have to make their way over to the left lanes which adds to the cluster of madness and so far everything done on the southbound side hasn’t helped at all… But great! At least something is being attempted. Should’ve been done soooo many years ago.
They didn’t have to pay for a study they could’ve just asked or drove that area
What's the update?.... I see nothing yet. They haven't even started
They haven’t even finished lol
So you’ll have northbound 15 traffic entering from Winchester now merging onto the 15 at the same area where northbound 15 drivers are merging over to exit Murrieta Hot Springs. Sounds like you’re just creating a new bottle net up river.
What’s a bottle net?
😂😂