(Cab Ride 022 ) Allington to Strood, A Freight Rambler Production.

Поділитися
Вставка
  • Опубліковано 14 гру 2024

КОМЕНТАРІ • 6

  • @3018john
    @3018john Рік тому

    Great video. Takes me back to 1984 as a 25 year old starting work on the Railway and based at Paddock Wood. I’ve walked this route many times,checking and repairing DC cables and identifying con rail pots needing replacing. Thanks for bringing these memories back. 👍

  • @peckelhaze6934
    @peckelhaze6934 6 років тому +2

    Good one.

  • @bernardholcroft5138
    @bernardholcroft5138 2 роки тому

    must note most of your posts ,not many signals changes since the early 70s,lot less whistle posts probably due less crossings.

  • @IrishMusicCountry
    @IrishMusicCountry 3 роки тому

    Looks like Brookgate is not used anymore and Rugby sidings looks over grown.

  • @barboror
    @barboror 6 років тому +1

    If you have a long train. and you have a speed restriction say over a 30mph bridge going into a 60mph restriction. How do you know when the last wagon has cleared the bridge to open up the Throttle
    Also have you noticed if you like i , speed up the videos. Your much more aware of when you throttle up and throttle down sound wise anyone noticed that.

    • @freightrambler7199
      @freightrambler7199  6 років тому +5

      We have a train length indicator in the cab, that tells us when restrictions are passed...