TUV Building 10 Solar Installation

Поділитися
Вставка
  • Опубліковано 27 тра 2024
  • EES Group installed a 64.18 kWp solar array on the roof of Building 10, reducing TUV's CO2 emissions by 11,500 KgCO2e annually-equivalent to planting 528 trees. This installation is projected to save £505,993 over 20 years, with a payback period of just 3.2 years.
  • Наука та технологія

КОМЕНТАРІ •