Aapne bahut acchha video banaya hai,drone ke najare bhi kafi achha behtrin khubsurati se upyog dhikhaya hai,aap iss se aage Deori border tak bhi vedio banaye taki pata chal sake kab tak 4 lanes cam pura hoga,very nice informative blog vedio 👌👍
Bahut Accha hai Sir.... Bhandara City Cross Karne me kafi Samay Lag jata Tha Aur Trafic bhi Bahut Jyada rehta hai Ye Kafi Accha Hai ... Lag bhag 6-8 Mahine me Ready Hoga Shayad
Not the highest but yes, In short time this video got the highest views. And yes I am planning for Ambhora bridge. Long time i haven't seen that bridge.
Work speed ko dekhte hue lag raha hai it will take. 1 more year to complete the project. Other wise option hai ek side se run Kiya Jaye due to heavy traffic in bhandara at we will save our 1 to 2 hrs from this jham.
Absolutely, But ek side se open kar denge to koi rukega nahi, Aur jyada problem ho jaega, I guess next 6 months me maximum work complete ho jaega. Aur jaldi hi Public ke lie open kiya jaega isko.
@@LifeOnWheelsBSP Video meaning drone video nahi, video including project route, graphics, how it will look in future. better than this one ua-cam.com/video/ztzS3GUw1wA/v-deo.htmlsi=iDeAJvqBMa1NOo9f
हां मुझे भी लगता है जून महीने तक के काम कंप्लीट हो जाएगा रोज ही मेरा आना-जाना रहता है बहुत तकलीफ होती है काम के वजह से बरसात हो या गर्मी हो या सर्दी हो काम सुरू ही रहेता है पर काम की गती धिमी है नही तो अभी तक काम पुरा हो गया होता बोहोत कठिनाई होती है आने जाने मे काम के वजहसे पिछले डाई तिन साल से
Kitna slow motion me ban raha hai, na jane kitna waqt aur lega , there should be a timeline to complete the work? It is most important as there is too much traffic in bhandara that it takes 1 hour to pass 10 km
इस काम की वजह से हमें भंडारा निवासियों को हर रोज ट्रैफिक की तकलीफ झेलनी पड़ती है ट्रैफिक में घुसने के बाद बहुत देर हो जाती है रास्ता ही नहीं मिलता कहां से जाए सरकार ने इस और ध्यान देकर जल्द ही काम कंप्लीट कर देना चाहिए चाहिए
Bridge work near Bhilewada village is big trouble for daily commuters. Daily traffic jam. Bhilwara to Bhandara distance can be covered in 10min, but due to this bypass thing sometimes it take 1hr to reach Bhandara. Pathetic work planned by NHAI. Within 6 months ye kam complete nai huwa to rainy season me fir kam ruk jayega last year ki tarah
U should do a trip from Raipur To Surat on this highway. Mr Gadkari said he wants to increase avg speed on NH from 47 km/hr to 80 km/hr. So we will know, this west to east highway, what's the avg speed gains now??? U can take the trip when at least one of the up or down lanes gets operationalized on this project (Bhandara bypass). Because many of the projects on this NH6 are coming to fruition.
Condition itni bhi achi nahi hai. Wainganga bridge k aage road kharab hai. Traffic bhi rehta hai. Movement slow rehta hai. In day time due to heavy vehicle. Local traffic bhi rehta hai.
Excellent, use of Drone/Graphics/Information/Voiceover/BGM and Editing
Glad you enjoyed it
Awesome ,, covered whole road .. very soon one side lane will be opened
Hope So 😂
Aapne bahut acchha video banaya hai,drone ke najare bhi kafi achha behtrin khubsurati se upyog dhikhaya hai,aap iss se aage Deori border tak bhi vedio banaye taki pata chal sake kab tak 4 lanes cam pura hoga,very nice informative blog vedio 👌👍
❤ achha laga ji🎉🎉🎉🎉
Thank You ☺️ Dear
Best Road
Absolutely 💯
Superb vedio
Thank You ☺️
Excellent information
Thank You ☺️
Good work keep it up brother 🙏🙏
Thank You ☺️ Dear
बहुत बढ़िया इनफार्मेशन 👍🏼👍🏼👍🏼
Thank You ☺️
Aap bahut mast kaam karta hai bhai❤
Thank You ☺️ Dear
Salute to your hard work and drone shoot. Keep it up Bro...
🙏 Well wisher from Jawahar Nagar...
Thank you so much dear..
Very good video.👌👍
Thank You ☺️ Dear
I think next 6 months mein complete ho jayga
Excellent covering start to end part of the project
Thanks
I Hope the same 😁
Very nice informative videos.....
Thank You ☺️ Dear
Good work sir❤
Thank You ☺️ Dear
Bahut Accha hai Sir.... Bhandara City Cross Karne me kafi Samay Lag jata Tha Aur Trafic bhi Bahut Jyada rehta hai
Ye Kafi Accha Hai ... Lag bhag 6-8 Mahine me Ready Hoga Shayad
Ummid to puri hai 2025 me ready ho jana chahiye.
I think highest views on this 🎉
Ambhora bridge bhi ek bar banta hai
Not the highest but yes, In short time this video got the highest views. And yes I am planning for Ambhora bridge. Long time i haven't seen that bridge.
Congratulations for 1lakhs view bhai
Thank You ☺️ Dear
Nice coverage once again Mr Life on wheels. Hopefully this project will be completed by end of next year. Thanks for update. 👍
Thank you..Hopefully it will be completed soon.
मुझे ऐसा लगता है कि अगले मानसुन तक पूरा हो जाएगा।
Nice video 👍
Thank You 😊
Nice 👌👌👌👌
Thanks 😊
Good job
Thanks ☺️
Very nice
Thanks
Nice 👍 Sir
Thank You 😊 Dear
Maximum aur 1yr lagega complete Nagpur Bhandara Gondia tak ready hone me...
Bilkul ye pura area well settled hone me time to aur lagega.
Nice 👍
Thanks ✌
Good was very fedup with bhandara traffic while going to nagpur from bhilai
Thank sir ji
Hiro of this work is ex - M.
P. Shri sunil mendhe who had enagrated this plan earlier when he was in power.
Thanks to our ex mp sunilji mendhe
भाई इस काम की वजह से ट्राफिक बहोत ज्यादा रहता है हर दिन और अभी काम आधा ही हुआ है बहोत परेशानी झेलनी पड़ती है हमको मैं भंडारा में ही रहता हूं
नाना पटोले खूप भंडारा करत राहते,त्याचे भंडा-यात कामं कोणी सांगेल.
सब बन गया है अब देख लीजिये
itni jaldi ban gaya, Abhi to 1 month hua hai mudhe shoot kie. Anyway fir se shoot karenge next month.
👍👍
Nice Information
Thank You ☺️
Gondia to Nagpur, samrudhri mahamarg (extensions )ki information dekhao
Jarur information milte hi share karunga..
Okay 🆗❤
can you please tell the name of soundtrack you used in video
Sure brother, Added the link in the Video description. Please Check..
Work speed ko dekhte hue lag raha hai it will take. 1 more year to complete the project. Other wise option hai ek side se run Kiya Jaye due to heavy traffic in bhandara at we will save our 1 to 2 hrs from this jham.
Absolutely, But ek side se open kar denge to koi rukega nahi, Aur jyada problem ho jaega, I guess next 6 months me maximum work complete ho jaega. Aur jaldi hi Public ke lie open kiya jaega isko.
Ek side se shayad hi chalu ho.. Existing road ka bhi expansion pass hua tha same time, uska bhi 4 lane ka kaam shru hona hai so pahle ye complete hoga
2025 ke ending me ho jaega hopefully 🙌
Possibly chance to pura hai.
Great progress ! Which company is executing this ?
SSS Engineers. And yes they are doing a great job.
They should extend Mumbai Nagpur expressway till Kolkata just like Mumbai Delhi expressway.
Nagpur - Chandrapur expressway
Wo alag project hai bhai.. Abhi uska land acquisition start hua hai..
@irfanwarsi8079 Video to बन सकता है ना भाई, start to end of project
Bilkul ban sakta hai brother, But ground pe kuch to hona chahiye dikhane ke lie. Jaise hi kaam start hoga main jarur video banaunga.
@@LifeOnWheelsBSP Video meaning drone video nahi, video including project route, graphics, how it will look in future. better than this one ua-cam.com/video/ztzS3GUw1wA/v-deo.htmlsi=iDeAJvqBMa1NOo9f
Then possibly you are looking for something like this. ua-cam.com/video/hZDLtv9KjuQ/v-deo.html
हां मुझे भी लगता है जून महीने तक के काम कंप्लीट हो जाएगा रोज ही मेरा आना-जाना रहता है बहुत तकलीफ होती है काम के वजह से बरसात हो या गर्मी हो या सर्दी हो काम सुरू ही रहेता है पर काम की गती धिमी है नही तो अभी तक काम पुरा हो गया होता बोहोत कठिनाई होती है आने जाने मे काम के वजहसे पिछले डाई तिन साल से
Kitna slow motion me ban raha hai, na jane kitna waqt aur lega , there should be a timeline to complete the work? It is most important as there is too much traffic in bhandara that it takes 1 hour to pass 10 km
Haan, bahut der lag raha hai, lekin yeh project jaldi hi complete ho jayega.
पुल भी दुसरा बनाना होगा न
Jab project complete ho jaye to ek bar jarur project ka update dikhaye
Bilkul
Raipur-Dhamtari railway line update??
Sure 👍 Coming Soon
भैया चेन्नई बेंगलुरु एक्सप्रेसवे अपडेट 🙂
इस काम की वजह से हमें भंडारा निवासियों को हर रोज ट्रैफिक की तकलीफ झेलनी पड़ती है ट्रैफिक में घुसने के बाद बहुत देर हो जाती है रास्ता ही नहीं मिलता कहां से जाए सरकार ने इस और ध्यान देकर जल्द ही काम कंप्लीट कर देना चाहिए चाहिए
❤
Raipur se delhi via rajegaon balaghat lakhnadon ke bich new green field highway ki manjuri mil chuki hai iska video banao
Jarur, Manjuri to mil chuki hai lakin koi kaam start nahi hu hai abhi tak.
Bhandara to balaghat national highway ka project kab shuru hoga NH543K
Information milti hai to jarur share karunga.
Kam bahut slow चल रहा है, roj trafic जाम होता है, , hum लोग रोज pareshan होते है, लगता है और 1sal लगेगा .
Only 6 to 7 manth
Background music is very irritated
Bridge work near Bhilewada village is big trouble for daily commuters. Daily traffic jam. Bhilwara to Bhandara distance can be covered in 10min, but due to this bypass thing sometimes it take 1hr to reach Bhandara. Pathetic work planned by NHAI. Within 6 months ye kam complete nai huwa to rainy season me fir kam ruk jayega last year ki tarah
I understand the frustration. The NHAI should have planned better. I hope this work gets completed quickly.
Aaj Mera dimag kharab huwa wahi traffic "Paladi Bridge" me Bhilewada ke aage
Plz Gondia new ring Road updates
Sure, I will try..
Bhai ngp ring road new update kariye
Koradi to pardi by pass not completed
भईया आपके पास कार है ? 😁😝
Samrudhi update video Kab mile gaa..
Koshish karunga brother Jan me update de saku. New year k wajah se tickets nahi mil pa raha hai travel karne ke lie 😢
❤ ok bro...
Bro
Aur 1.5 years lagege to start
There is very bad traffic in Bhandara
Very much true
कब pura होगा सर
Contractor kon hai bhai
SSS Engineering Ltd.
@@LifeOnWheelsBSP thnks bhai, kuch contact no hai kya inka, quality walo ka
Because mai construction materials testing karta hu
@ Sorry to say, But contacts to nahi hai dear.
@ Ohhh. Ye to achi baat Hai. But aapko contact karna hoga agency se
Bhot ghatiya city hai bhandara 😂😂
U should do a trip from Raipur To Surat on this highway.
Mr Gadkari said he wants to increase avg speed on NH from 47 km/hr to 80 km/hr.
So we will know, this west to east highway, what's the avg speed gains now???
U can take the trip when at least one of the up or down lanes gets operationalized on this project (Bhandara bypass).
Because many of the projects on this NH6 are coming to fruition.
For sure. I will do a road trip on this highway in 2025.
Bhandara town ka jo road hai, uska position kya hai. Waha traffic ka, planning to go nagpur
Condition itni bhi achi nahi hai. Wainganga bridge k aage road kharab hai. Traffic bhi rehta hai. Movement slow rehta hai. In day time due to heavy vehicle. Local traffic bhi rehta hai.
@@DeepakVerma-1 mai abhi vahi fasa hu 6:12 pm 23/12/2024. Bohot bekar hal hai 7km lamba jam tha aaj
@@sahilbhagat5648 ohh bhai, sad for you... this chokers only want tools
Ohhh, Bahut bura haal hai sach me.
Concrete crash barrier are wobbly, twisting and turning . Poor construction work.
I'm planning to go nagpur, can i use this express way
As of now. You can't use this dear.
@LifeOnWheelsBSP thankyou sir
Ye BJP ka raaj hai .........jyada samay nahi lagta ❤.........congress hoti toh rahul baba 80 saal ke ho jate toh bhi nahi banta
@@nikhil20122012 haa bhai paisaa bolta hai bass kitna jeb me kitna bahar