I'm shocked no one wanted to point out the plates were put in the wrong spot in over half the scenes, both per Carlisle specification and ANSI/SPRI. Plates are never supposed to be within 3" of edges of the insulation (or rather, when they are that close they don't provide the proper uplift resistance and another plate must be added in those area) They even mention the fastener should be at least 6" back then not 4 scenes later show plates along the edge.
I'm shocked no one wanted to point out the plates were put in the wrong spot in over half the scenes, both per Carlisle specification and ANSI/SPRI.
Plates are never supposed to be within 3" of edges of the insulation (or rather, when they are that close they don't provide the proper uplift resistance and another plate must be added in those area)
They even mention the fastener should be at least 6" back then not 4 scenes later show plates along the edge.
well i do install in bouth sides of the joints if not they lift,thats basic
"Allow the membrane for 30 minutes before bonding. Good one, lol.
😂
🤦🏽♂️😅😂😂
can I install the underlayment on top of existing asphalt shingles or must they be removed first?
Mancanitley fixed
you can do whatever you want to... your mom gave you a permission slip apparently.
No vapor barrier
Don't need it... The EPDM is waterproof lol