  • @thomasmurphy9350
    @thomasmurphy9350 Рік тому

    Nice work thanks especially for showing how to work it down that makes a big difference in the way the corners last. In the winter we do a lot of temporary repairs for upcoming customers and projects. And you really can tell the difference in how they are installed 😂😂😂

  • @Carl-yu6uw
    @Carl-yu6uw 3 роки тому +1

    Watched this today, applied 4 decent corner patches, no issues whatsoever. Very useful content for a DIY roofer. Thank you.

    • @MrJaberrell
      @MrJaberrell 2 роки тому

      Where did you get the corner patches?

  • @rdy4trvl
    @rdy4trvl 4 роки тому

    EPDM looks like a great way to flash a skylight curb system. Any suggestions on how to transition the EPDM to an existing mineral-surfaced rolled roofing material on an almost flat roof?

    • @LaMostraVia
      @LaMostraVia 3 роки тому

      Yes and it’s quite simple… 2 options, either tear off the existing roof down to the plywood. Use caution here as the self adhered base layer is very time consuming to get off.
      You can install a 1/2” recovery board over top of the granulated roof, make sure the tasters going into the plates down go through the ceiling below the roof. Next, roll out and cut your EPDM to fit the roof with enough overhang to cover the exhausting roof and extend 3-4” below the old roof line. Now you can adhere the EPDM with bonding adhesive. The final step would be to attach edge metal to the perimeter of the roof along with cover tape covering the top of the metal and extending on the roof roughly 4”.
      Note: the roof may require seaming areas as well as flashing to chimneys/walls etc.

  • @EIRONA
    @EIRONA 4 роки тому

    Wish I'd known where to apply the pressure before attempting this.

  • @tbh30168
    @tbh30168 6 років тому

    Is there any situation where you would add 2 pieces of flashing to cover 1 90° corner?

    • @budbubbler420
      @budbubbler420 5 років тому

      6" under 12" usually for more difficult internal risings such as corners and ridges

    • @LaMostraVia
      @LaMostraVia 3 роки тому

      If you’re following spec, some manufactures require a 6” and 9 or 12” patch. If you’re not going after a manufactures warranty you don’t have to but those are sensitive areas commonly associated with leaks so it’s best to double up!

  • @PeakyBlinder
    @PeakyBlinder 5 років тому

    External corner not outside
    External and internal fyi
    And that primer is actually bonding agent.
    Apex is the top , you actually mean walk it down to your substrate membrane.
    Neat job though just need to learn the correct wordings.
    And the only bad thing about EPDM is the bonding agent isn't waterproof so you are relying on mastic to prevent ingress.
    That's why EPDM sucks.
    The roofs longevity is only as good as that mastic joint unless you have your corners fused to your field sheet .

    • @LaMostraVia
      @LaMostraVia 3 роки тому

      EPDM when installed correctly is actually a nice roof system.
      Just too many missed steps when installing EPDM leads to early failure

  • @thomasmurphy9350
    @thomasmurphy9350 Рік тому

    He he he said black cox😂😂😂