    Thanks for shering, !!!!!!!!!!!!!!!!!!!!!
    are you required by code to have raoid shutdown in the very pannel on the roof or one one wall sufice to complice with the code? thanks

    • @gerrypineau
      @gerrypineau  4 місяці тому +2

      Check your local codes. I live in the boonies and was not required to permit this installation. At the house it is easily to shut off power by simply moving the transfer switch to the center-off position but there is still power at the solar room. I thought it prudent to have rapid shutdown available at ground level incase responders needed to quickly shut off the power to everything.