Precast Box Culvert Erection|| Delhi Mumbai Expressway.

Поділитися
Вставка
  • Опубліковано 18 вер 2024
  • The Delhi-Mumbai Expressway is an under-construction 1,250 km long controlled-access highway connecting the national capital Delhi with India's commercial capital Mumbai. Foundation stone of the project laid by union ministers Nitin Gadkari, Sushma Swaraj and Arun Jaitley on 8 March 2019.
    Length: 1,250 km.
    My Work Location is MadhyaPradesh Jhabua Dist.,Package-25 Section-1
    Major cities: Mumbai, Delhi, Vadodara, Faridabad, Ratlam, Kota, Alwar
    #Civil_Design
    #Delhi_Mumbai_Expressway
    #Mumbai_Delhi_Expressway
    #Highway_Construction
    #Civil_Construction
    #Desh ka vikash
    #Dream Project
    #Box Culvert Erection

КОМЕНТАРІ • 13

  • @CivilDesign538
    @CivilDesign538  3 роки тому

    Please Like Share & Subscribe🙏🙏

  • @mehtapramod23
    @mehtapramod23 3 роки тому +2

    WE NEED MINIMUM 1 LAKH KM MULTIMODAL MULTILATERAL EXPRESS WAY IN NEXT 5 YEAR IF WE WANT TO BE SUPER POWER UPTO 2050

  • @anupbhau91
    @anupbhau91 3 роки тому +1

    पैदल यात्रियों के लिए है क्या ये ?

  • @mrnabamatto7036
    @mrnabamatto7036 2 роки тому +1

    I need formwork details specification.

  • @AnasKhan-sb2md
    @AnasKhan-sb2md Рік тому

    Box culvert erection ka labour rate kitna rehta hai

  • @gsiniyan4147
    @gsiniyan4147 3 роки тому

    Cost of a culvert

  • @aankithbidhan703
    @aankithbidhan703 2 роки тому

    10 km road me kitna lgta h

    • @CivilDesign538
      @CivilDesign538  2 роки тому

      its depending upon the topographical conditions of the road