Was the Customer PISSED or Trying to get FREEBIE's

Поділитися
Вставка
  • Опубліковано 5 гру 2024

КОМЕНТАРІ • 801

  • @jasonreist2528
    @jasonreist2528 2 роки тому +97

    I had a very similar experience with a customer. We were installing a new furnace and a/c and the customer was in ourback pocket all day talking and pestering us. As we were finishing up he comes from out of the blue and tells us that he wanted the whole unit moved like 4" to the right even though the new was in the same place as the old. We ultimately moved it but it cost most of the next day and they turned out to be the customer that no matter what you did it was never enough. They turned out to be the only customers that we actually told them never to call us again.

    • @Dirtmonkey
      @Dirtmonkey  2 роки тому +23

      Haha those customers are always a learning curve especially regarding your own boundaries / how much BS you'll put up with. Actually teaches us a lot..in its own skewed kinda way lol

    • @jasonreist2528
      @jasonreist2528 2 роки тому +8

      It sure does. I was doing basically the very same thing as your 20 minute rule. I did it as a way to diffuse calls that were feeling tense. I learned that I could almost always find something that I had in common with the customer. Common ground goes a long way to building a good relationship with the customer.
      Love your videos!

    • @truckstotractorsrepair
      @truckstotractorsrepair 2 роки тому +2

      Was working for my dad doing fence one time and someone’s wife made the pool guys move the brand new in ground 6 inches over. They paid for it though

    • @maryglasser404
      @maryglasser404 2 роки тому

      @@jasonreist2528 iui

    • @saulduke9377
      @saulduke9377 2 роки тому +4

      Well dont take me wrong but some times, they think same as you..they pretend be your friend then. Their expect to have a hold discont at and of the job.., so what I do is I'm going to pull inspection..system should be a up code and up manufactures recommendations...Done.

  • @ohanailo7743
    @ohanailo7743 2 роки тому +51

    LOL!!! As a Special Inspector seen both sides of the disputes. Seen contractors fail to meet the contract specifications and Owners interfere and try to change things to late in the middle of the job, in both private and government work. Your one of the few that does a pretty good job in your broadcasts as a contractor. Thank you, and keep up the good work in my observations.

    • @Dirtmonkey
      @Dirtmonkey  2 роки тому +14

      Thank you! I'm trying to be as transparent as possible, it tends to help everything work out best in the end 👌

    • @yknowiknow5937
      @yknowiknow5937 2 роки тому +1

      @@Dirtmonkey do ya think it would be possible, to use some type, of mortar or concrete mix, to repair, those chips or do they make, something, for retaining walls, to repair facial chips, in the wall??🤔, I guess, I could Google it.🤔🤣✌️

  • @chargerfan5513
    @chargerfan5513 2 роки тому +1

    Did plumbing service work for 29 years. Got real smart showing customers chips, tears, burns , or scratches on floors or countertops before starting a job. Used towels, drops, or cardboard to cover their stuff, but still had the shysters try to get freebies (which sometimes the boss caved in to the whining) for damage that was not either me or a helpers fault. It's sad that there are people like that, and professional contractors/service people have to grin and bear it occasionally. Now days your cell phone or camera is a great way to document before, during, and after. Great videos, great looking and professionally done projects! This plumbing guy has learned a lot from your vids...Thanks!

  • @howlandexcavating
    @howlandexcavating 2 роки тому +110

    Sadly, being in the excavation business for 27 years I have had a few bad customers. The most memorable was a satisfied customer that just didn't want to make the last payment. They admittedly had no problem with the work, they just didn't want to pay the balance. So a few days after a failed attempt to collect I did something that put me in the back of a sheriff's car. We went back to the job with the smooth face bucket on the excavator and 2 dump trucks. I was able to reclaim the rubble for about 3/4 of the total length of the driveway. The driveway install was the last part of the many things we did at this customers home. That driveway cost me labor hours to put down, labor hours to remove, and a few hours in county lock up. In the end it was very satisfying to me. Also in this small town it made more people aware that didn't already know me, don't f#(k with me. I'm proud to have a solid reputation in the community, both for my business and position in local government. But 12 years later people still talk about this in my sleepy little town lol!

    • @gordowg1wg145
      @gordowg1wg145 2 роки тому +10

      It wasn't a recently fired senior politicin was it? He made that a normal business practice, even making NO payments, telling those he owed to "sue me" for the money, knowing full well it'd often cost more than the debt and, even if they did go ahead, they wouldn't see a result for years. He put a lot of smaller businesses out of business, and in at least one instance the lawyers that WON a case for him had to sue for payment.

    • @howlandexcavating
      @howlandexcavating 2 роки тому

      @@gordowg1wg145 No, he wasn’t. Just a typical @$$h0!£. The day after he refused to pay I talked to his sister that happens to live next door to me. She said he will never pay, I will be added to the bottom of a long list of people that have judgements against him. Apparently every job he has ever held was off the books. I wish she had said something before I even started his job. On the following day I got my revenge. Although it created a buzz on the town Planning Board I serve on, the revenge was well worth it. I wasn’t removed from the board, but I would have been fine with it either way. It is a non paying position and the revenge would have been worth it. As far as I am concerned I provided a public service to everyone he’s ever screwed.

    • @gordowg1wg145
      @gordowg1wg145 2 роки тому +3

      @@howlandexcavating
      Is the revenge something I'd read on Reddit?
      Regardless, if it was "well worth it" I would hope others who were similarly ripped off made some sort of "well done" comment to you?
      Hopefully, if he's like that, he's going to have defaults against people he really doesn't want to mess with, like the bank or local authorities, who can force a house sale to recover outstanding debts.
      Heck, if he was working "off the books" he would be MOST unlikely to have been paying his income taxes, so the IRS could REALLY f*ck him up with back-taxes, penalties and accrued interest. One would hope at least one of his creditors gave them a call.

    • @howlandexcavating
      @howlandexcavating 2 роки тому +6

      @@gordowg1wg145 the revenge was removing the 12” thick layer of rubble I installed in his driveway. I was able to remove 3/4 the length of his driveway starting at his house. Then the sheriffs showed up and the rest was history.

    • @gordowg1wg145
      @gordowg1wg145 2 роки тому

      @@howlandexcavating
      😎👍😊
      IMO, that's perfectly fair, leave the percentage that he paid for with his deposit and take the rest - doesn't cover the labour time, but he would have what he paid for...
      Going to depend on the circumstances, but perhaps those reading may start at the road, removing a couple of feet, first so he won't have the access to the driveway remains to park his car until it's filled in if the police turn up - and if word about his refusal to pay 'somehow' spreads through the other business in the area, he may have problems sorting that out.

  • @flightographist
    @flightographist 2 роки тому +39

    I have only done about a dozen walls when I ran a garden center in BC, all engineered, high end repeat multiple project customers. I made a point of pointing out the manufacturing defects in the blocks to clients before hand and informing them they could pay more for the extra handling ( inevitable) if they wanted a no blem wall but also told them it was pointless because they would exfoliate with weathering anyway.

    • @Dirtmonkey
      @Dirtmonkey  2 роки тому +15

      Honesty is the best policy 👍

    • @flightographist
      @flightographist 2 роки тому

      @@Dirtmonkey Yup, upfront so there are no crossed wires, Sad your lead couldn't go eyeballs to eyeballs with that wall owner before that huge pain in everyones ass.

    • @kristenvincent3622
      @kristenvincent3622 2 роки тому

      Lol… West Vancouver!

    • @flightographist
      @flightographist 2 роки тому +1

      @@kristenvincent3622 No, big one on Bowen though.

    • @kristenvincent3622
      @kristenvincent3622 2 роки тому +1

      @@flightographist and that is close enough! 😂 could’ve been Pender Island too… FB has been taunting me with “8 years ago” patio build pictures of my last house… just a few more years and I can start on my landscaping and retaining walls here on Saturna. 🇨🇦 thinking about stepping up my game too for this one into more decorative finishes, there is an awesome mason retired here.

  • @robsdeviceunknown
    @robsdeviceunknown 2 роки тому +153

    Problems with clients are increasing in today's entitlement mentality world.

    • @howardgrant4254
      @howardgrant4254 2 роки тому +13

      Well said. This is exactly what I was thinking. Maybe not so much a scam as a person expecting perfection where perfection is not really possible.

    • @Dirtmonkey
      @Dirtmonkey  2 роки тому +12

      Can't argue there

    • @kevinjustice5102
      @kevinjustice5102 2 роки тому +7

      Been working since I was old enough to hold a shovel and been out on my old for 5 years I do concrete paving and excavating demolition clearing you’ll never get a project completely 100%. You can only keep improving and tighten up here and there but still will never get 100%. My issue is other contractors and clients who want the cheap price with absolute perfection in a imperfect world. I always want the client happy in the end just have a few that will avoid you and complain at the end.

    • @jupitercyclops6521
      @jupitercyclops6521 2 роки тому +5

      8 yrs lawn mts
      I would normally bill at the end of each month so I had to trust them to pay or I'd be out a month plus the couple weeks grace period.
      Had a realtor literally cry trying to get out of paying. He was Iranian. They are shrewd.
      I already gave him a great deal so I wouldn't budge
      Then I had 1 guy stiff me on his home account & business account.
      He was stiffing all his vendors too.
      Offered to settle it man to man after 5 months.
      He wrote me a check then stopped payment.
      Took him to small claims & won.
      Other than that everyone paid no problems no questions.
      I tried to do a a1 job everytime .
      Threw in little freebies like 1 free fertilizing per year.
      Loved it!
      Gas prices makes me happy I'm not still in it

    • @yknowiknow5937
      @yknowiknow5937 2 роки тому +1

      Yeah, that and a lot, expect, too much, for THEIR money.🤔🤷

  • @buzzsaw301
    @buzzsaw301 2 роки тому +28

    Been a contractor for years. Everything is great until it's time to get paid

    • @ayamanif3799
      @ayamanif3799 2 роки тому

      Right, always wanting a reassessment or breakdown of cost again. Lol

  • @nocoolname32
    @nocoolname32 2 роки тому +16

    being a small time landlord and being neighbors with my tenants has led to me never having to evict anyone. when they have gotten behind they know i work same as they do for a living and if they don't pay, it comes out of my blue collar paycheck. i ask them to leave and they leave. this 20 minute rule is for sure a thing.

  • @charleswise5570
    @charleswise5570 2 роки тому +31

    Stan, you and your whole crew have tons of integrity, but in this day and age, be careful, many consumers and contractors don't. It's becoming scary, how many people just have no morals, boundaries or care for anyone but themselves. We define these people as sociopathic. Only getting what they want, no matter what they have to do to get it.
    Cudos to your company!
    As we go in to bad economic downturn, only great companies like yours, are going to survive. You can take this to the bank!
    Great video Stan!

  • @TheHonestPeanut
    @TheHonestPeanut 2 роки тому +5

    This is a small one, I just did some repair and maintenance on a commercial mower for a customer who's always VERY finicky. Before I started I said "just to reiterate, [said back what they said they wanted done], anything else we'll have to revisit with diagnosis another time right?" They said YUP and I did the work. This is at their house BTW. Parts and tools brought on site so they didn't have to leave home or have it hauled. After, they checked the mower and something they didn't tell me about wasn't fixed... "why isn't this fixed?" You didn't tell me about it. "Ok but I wanted this fixed too. What am I paying you for?" You're paying me for the work you asked for and now you'll be paying someone else for future work. Wasn't the 1st time with them "not understanding" what had been talked about before a job started but it was the last time!

  • @kellyminnesota
    @kellyminnesota Рік тому +1

    Absolutely love this man's videos.
    Btw, I have it stated in my warrant clause attached to the contract that "chips" are a part of the general make up and manufacturing procedure of segmental retaining wall block and will not be covered under warranty unless they fall under "unacceptable compliance per the manufacturer's assessment of "within spec". Please see manufacturer's specification details or their representative for interpretation of "within spec" I also have an entire paragraph devoted to no warranty vulnerability to efflorescence (aka:eflo) and block/paver color variations..

  • @magic.marmot
    @magic.marmot 2 роки тому

    I love that you use these videos to teach others, it inspires me to do the same.
    There are some people that look upon service folk as Beneath them. IMHO, they tend to not like to get their hands dirty.

  • @thebeans804
    @thebeans804 2 роки тому +1

    I am not a contractor, but I appreciate the advice on how customers need to work with the contractor. Mutual respect. Thanks so much. ☺🙏

    • @Dirtmonkey
      @Dirtmonkey  2 роки тому

      And I super appreciate the care 😊

  • @KeeverConstruction
    @KeeverConstruction 2 роки тому +10

    The bad customers, in my experience, have all waited til the last second on finishing the project, and they come with their lies to try not to pay. The entire project they continually complement everything, until it about to be done and they have to pay. But again, we have contracts, and take pictures or videos daily. So they are still up against the wall of contractural law and will regret lying and trying to steal money for the work that was performed.

  • @letsdothis9063
    @letsdothis9063 2 роки тому +7

    One more comment. Doesn't it seem like it's usually the really rich people that try not to pay? I have done several different types of work, but mostly landscape, hardscape, and irrigation.
    More than once, we had to go back to a job site and reclaim all of our materials. Luckily my boss was a solid guy, and the law always took his side. He was well connected because he is just a great guy, and everyone likes him. He is also a beast, so not scared of anybody.
    We even pulled up a big shot lawyers fence in broad daylight, ripped everything out of the ground and left the place destroyed. But hey, we gave the guy more than a year to pay.
    The county declined to prosecute. Lol

    • @cuivre2004
      @cuivre2004 Рік тому

      That may be true- but go to a restaurant and it is often the lowest grade people who complain the most about minor things with service, food, or anything else. That is the only time they are in a "power position" in their lives, so they tend to abuse the wait staff the worst.

    • @davidlindgren7605
      @davidlindgren7605 Рік тому

      NICE! BASTARD DEADBEAT LAWYER!!

  • @drumset09
    @drumset09 2 роки тому +1

    Plowing snow, we had a driveway with very little snow storage, and the neighbor being down a retaining wall about 3 feet. I did my pushes, was on my way to another property, and the neighbor calls the company to complain we put snow in their driveway. I go back, take a couple pictures and send 'em to the owner (my direct boss) and there were two snowballs, maybe 1/2 inch in diameter, and a third even smaller that had gone over the top of the wall. This was on a 4-5inch snowfall.
    The neighbor was trying to say we needed to plow their driveway for free because of what we did.
    We did not plow their driveway.

  • @gurueddy
    @gurueddy 2 роки тому +2

    A good mate was pestered by one his tenants to put air conditioning in her apartment bedroom.
    My mate was reluctant, but as it was a long term tenant in good standing, he had a split system installed at huge cost (because of location in a multi-storey apartment bldg). A week later the tenant calls and says “it’s too cold, take it out again”!

  • @michaelstampfer1321
    @michaelstampfer1321 2 роки тому +11

    I am a retired tile contractor. If the customer complained about all of the previous work they had done. I would ask them how their issues were resolved and if they were satisfied. At that point you know if you want to work on their project.

    • @jamiejeffries430
      @jamiejeffries430 2 роки тому

      the owner of the company always makes the final decision on everything not your foreman. the foreman doesn't lose any money if the wrong decision is made he still gets paid the owner loses the money.

    • @stevenlavallee3833
      @stevenlavallee3833 2 роки тому

      I'm a flooring contractor out of greater KC and now a firm believer in 20 min rule . I had let 2 finished jobs go unpaid with a new builder I took on thinking we would just pull all the jobs on one check and when I was finished with the 3rd job and went to get paid I couldn't find him anywhere and that's been 5 yrs ago and I'm out 5 grand and still had to pay help .

  • @Jimmermahomoney
    @Jimmermahomoney 2 роки тому +1

    Damn Alex is jacked! Haven’t watched in awhile saving them so I can binge watch. Nice work Stan!

  • @paulpurves484
    @paulpurves484 2 роки тому

    Really enjoyed this I’ve seen many shows over here in the uk on so called cowboy contractors but have often wondered why I haven’t seen many on cowboy customers, in the world we live in now so many people are looking for ways to get money off not many seem to have any integrity any more, well done guys for flagging this up!!!!

  • @ryanorr346
    @ryanorr346 2 роки тому +1

    I hate customers like that. I try like hell yo talk to customers n show them progress as the job goes for the exact reasons you stated. Great video n glad you make ppl aware of how jobs can go

  • @dereksmith1803
    @dereksmith1803 2 роки тому +19

    Those little chips aren't enough to worry about. The one big chip you pointed out on the first wall, if there was a bunch of those, would be a legitimate complaint. If someone is bitching about the little ones, I would say they're just looking for something to complain about in order to try to get a discount.

    • @Dirtmonkey
      @Dirtmonkey  2 роки тому +5

      Well. Said.

    • @Cherrycola14
      @Cherrycola14 2 роки тому

      Or they're a virgo, my parents, boss and son are like that drives me crazy. My mom was talking to the rug installer about nothing and didn't tell him what she wanted , I was putting the baby down for a nap. Just happened to not be downstairs. So then I had to change the doorway for her but she's complaining about the staples. I said to her I'm not buying a rug stapler for 30 staples your gonna have to live with it. Learn when you hire someone to communicate about what you want if it's not cut and dried.

    • @MrChristopoop
      @MrChristopoop 2 роки тому +2

      There are “some” people who are wired to automatically look for those flaws and defects after a job or project is complete. I know because I am married to one. She is a pain in the ass about it. Our Versa Lok retaining wall has about 6 small chips in it. She immediately pointed em out when she got home. It is what it is I told her, that crew would not be coming back to take down and re lay the blocks, and there was no way in hell I was going to do it. I said if she wanted to help I would give it a go (I knew she would not). Her whole side of a family I believe get off on looking for flaws, like they get an award for locating em! I just brush it off and ignore her when I do stuff around the house now. Some customers you never can please

  • @bobcarley827
    @bobcarley827 2 роки тому

    Love your work and videos. For 20 years I had a janitorial company here in Southern California. Obviously noting like you do but the bottom line issue is customers and in my case getting them to pay for a job well done. Had a customer call to say they needed a very quick construction cleanup of a penthouse and adjacent condos behind an ocean view home. Open house in a few days. I took a crew in and almost worked 24 hour days to complete before open house and we were successful to the satisfaction of the customer. I submitted my bill which was as I had bid, no remuneration. I sent another, no response so then I visited the ocean front residence with no response. As this is an area of beautiful homes, I then parked in front of their home with a big sign on my vehicle " Resident Does Not Pay For Work Performed". Within 60 minutes I got a call from the real estate firm handling the open house and I was paid in full!
    A 2nd case was a contractor that hired me to do a construction cleanup, again at the last minute. Took a crew in and again we had it cleaned thoroughly before the deadline. Several attempts to get paid, then finally I parked in front of their office with a similar sign on the public street and soon I got called and was immediately paid.
    In both cases, of course there was the option of small claims court or other legal remedies but I knew I would never deal with either party again, so why not try another remedy? Good luck to all hardworking contractors out there!

  • @jackmasters9953
    @jackmasters9953 2 роки тому +6

    Had a customer stop my work about half way done. They wanted all (20) of their overgrown burning bushes cut down to 5 feet, which I started to do. The look on her face was priceless when she looked out the window at her leafless BBs. She came out screaming, STOP,STOP!!! I said. don’t you remember our conversation yesterday about what they were going to look like??? I specifically said that there would be little to no leaves on a hard pruned BB. It was even spelled out on the contract. I trimmed the rest and they honored the bill. Like you said Stan, it’s hard for some people to visualize the finished bush/wall, whatever. This was three years ago. I drove by the job site a couple weeks ago and the “hacked” bushes are really nice looking now!!😃😃. The couple are probably wishing that I had done all of them. Oh well. Great pay day 🌳. Thanks for all you do DM!!!

    • @gordowg1wg145
      @gordowg1wg145 2 роки тому +3

      hahaha, reminds me of my student days.
      Earning some money doing garden work for a woman and she told me she had some shrubs that had white flowers, that she liked, and to leave those, but pull out the rest - so that's what I was doing when she came out yelling. Turned out her shrubs with the 'white flowers' hadn't come into bloom yet, and it was the shrubs that had early blooming white flowers she wanted pulled out...

  • @Handyman247llc
    @Handyman247llc 2 роки тому +2

    Very good information everyone should be aware of, when working with customers. I have been very Fortinet that most of my customers have been available for me to talk with and ask their opinion on the project progression.
    Great content and extremally worthwhile information thanks Stanley!

  • @stanhensley3082
    @stanhensley3082 2 роки тому +1

    People be so much fun. Worked with alot of builders 👷‍♂️ over the years. If I miss something I 'm the one who did it not them.Only had one bad one. Nails not put in all the way on shingles. Was a year of come and see what was wrong.Well it pays to keep your cool and not be a dope. The contractor was just super behind. He came,I thanked him for coming and he fixed it right.I would have him back. Good video about working with people. Thanks 😊.

  • @ethanslawncare6798
    @ethanslawncare6798 2 роки тому +4

    Only two I can think of off hand is when I first started my business a lady asked me to wash her windows. I showed up with my supplies start cleaning. She stops me tells me she wants me to use her supplies because,”Windex streaks too much.” I obliged. Cleaned her windows gave her the invoice she didn’t pay me because they looked dirty and too streaky. The other I gave a price to do leaves and told them specifically that there’s a haul away/disposal fee. They said how much if you don’t because we dump them in the swamp across the street. Everyone does. I picked them up and dumped them and the owner of the “swamp” got in my face and said to pick them up and take them away or we’ll have a big problem. The customer got a discounted price and I almost got a trespassing ticket from the sheriff because they didn’t want to pay the extra amount.

    • @Dirtmonkey
      @Dirtmonkey  2 роки тому +2

      LOL wow. Sounds like they need to screw some loose knobs in their head together 🤪

  • @mikeseguin6443
    @mikeseguin6443 2 роки тому +1

    Stan.An honest contractor.If I was to pick a contractor you and your crew would be #1.👏🏼👏🏼👍🇨🇦🇺🇸

  • @diesel46809
    @diesel46809 2 роки тому +1

    Another awesome video and how it should be done with dealing with customers. I know your job with dealing with customers is hair pulling, and there are alot of dishonest people out there. I'm glad you have the skills and brains to discover the truth and facts. Great job. Keep up the great work. Keep safe

  • @ohiofarmer254
    @ohiofarmer254 2 роки тому +1

    I do industrial hvac, but when I started out I was a residential service tech. I got blamed for tripping a breaker for a freezer that I sware never existed. The people waited 2 weeks then called the shop to say I ruined an entire freezer of beef and The company was forced to buy them a whole cow. When my boss took the meat out I went with him and they wouldn’t show us the freezer. Neither of us think it was ever there

  • @simonthebroken9691
    @simonthebroken9691 2 роки тому +3

    Love the stories. Keep 'em coming.

  • @jdfarm1
    @jdfarm1 2 роки тому +2

    The 20 minute rule is also important for before you bid the job. I have bid jobs WAY high and asked for way more money down before starting after getting a bad vibe from the potential customer. I was thankful when I did not got some of those jobs.

  • @CZAnthonyX
    @CZAnthonyX 2 роки тому +4

    Im sure most customers are decent people, but over years, you will encounter bad apples. Its inevitable. Its all in how you deal with it in my opinion! Keep up the great work! I hope you have a great weekend!

    • @Dirtmonkey
      @Dirtmonkey  2 роки тому +1

      You got it! Just keep swimming 😁

  • @thecleanoutcrew497
    @thecleanoutcrew497 2 роки тому +2

    I mean the wall was damaged. As the contractor that should be checked as it's put in. And if they are defective you need to take it up with your manufacturer. Customers pay alot of money for these jobs.

  • @FredD63
    @FredD63 2 роки тому +1

    Kitchen and bath cabinets sometimes I always ask my customers to inspect and sign off on cabinets since 2013.. I asked a customer to look at all the cabinets after one of my guys unboxed all of them approximately 38 cabinets and the customer said that they didn’t have time that they’re sure that the cabinets are what they looked at and ordered I was just the installer so after I installed their hickory cabinets they waited until all the cabinets were up and said that those were not hickory cabinets and they were not the same wood pattern as the one they looked at at the kitchen store I told them Hickory has all kinds of patterns in them and not two cabinets are the same… they wanted me to take them all out until they talk to the kitchen shop where they purchased them from and found out what I was telling them was the absolute truth

  • @michaelferrin2688
    @michaelferrin2688 2 роки тому +4

    I don't work in landscaping, but that method you're talking about is nearly identical to what I do in the software industry. We demo and talk with our end users as frequently as possible. That way we can get their input and make shifts as soon as possible if necessary (also nice to get the thumbs up that things are good too).

    • @Dirtmonkey
      @Dirtmonkey  2 роки тому +1

      Awesome. I think it's probably a pretty universal thing to communicate as much as possible for lack of potential issues 👍

  • @stevenpitera8978
    @stevenpitera8978 2 роки тому +1

    As a specifier for lighting fixtures, if I saw a product that continues to piss off clients with a visual esthetic issue, I would never specify the product again until they fixed the issue. I had issues on jobs where lighting products started to bend due to heat, and while the manufacturer says it is within specified limits, the cost rolls downhill; clients will argue the defect is not the lighting they were promised (rightfully so), the contractor will either change it (cost hours) or argue they installed it right (kicks back to the client/specifier). So as a specifier/designer, products have to excel in function AND form. And getting a mock-up installed or a photos of previous projects is very important. If these blocks are the most inexpensive blocks produced and clients love the cost, it should be mentioned to them that they have corners that chip, and are designed to have those happen. Then let them decide during planning if they want to switch materials, and of course get them some samples! As a homeowner I think those chips look mechanical and purposeful even though it sounds like the chips happen outside the manufacturing process (and adds some real material identity to the block). But having the owner come out during lunchtime like was mentioned is kind of a way that resembles that communication mentioned above.
    Related to the 20min rule, as a client myself I had a house renovation that resulted in an increase in the budget by 60k. And alot of it could have been tackled had the 20 min rule included updated pricing for things like covid induced supply issues, potential cost savings to reach the original budget number, reducing scope of the project (we had a garage converted to a master bedroom/bath/closet/laundry room), etc. Now we paid the cost (had to borrow more than we wanted to front), but towards the middle of the project we raised all sorts of hell to get our contractor to understand budgets can flex with emergency issues, but not the original scope of work and asked for ways to bring it back to the original number. He would burn through the money, then call about issues. He also promised the number would remain, mentioned cost saving areas, and still we saw unexpected costs rise. Like we had a wood floor in half the home, and he promised that the floor budget would get cheaper because the flooring vendor mentioned we could reuse the old flooring with the new flooring. But we get the bill and the floor vendor wanted more money than what was budgeted. Or the cost for the electrician was more than the budget cost and more than the estimated cost our contractor thought would be to finish the last month of work. And then there was an issue where our contractor switched lumberyards and scammed the lumber owner to the point the lumber owner arrived on my doorstep telling me the situation (but I had told him the cost according to my budget sheet provided by the contractor was signed off as completed and all money allocated) and almost put a lien on my house (though I suspected that as a scam as well). Towards the end of the whole ordeal, the conversation switched to "we can do it" to "you'll find a way to get the money" eventually to downright combative towards me.
    Makes me furious as a specifier/designer because our budgets are set in stone, and we always give the client options to reduce cost or come up with specialized value engineering design right after construction documents. And then if there are issues not related to the original design, someone has to front the bill because a change order gets generated and at that point the client can legitimately complain or sue to get one of the trades to front the cost. But that is why we have submittal processes and schematic/design development/construction document phases so there are multiple avenues to push the communication back to clients and extend the life of the 20min rule that might not exist in a simple 30 min break during lunchtime. Hell even my plumber recently when he replaced my 20yo water heater (which was mentioned to be "like new" by my shitty contractor before he put it back in), gave me the tank cost and tankless cost and gave me the price that included labor/parts so I can see the breakdown.
    I don't know what I would do if I had to redo the whole process over because I think most of it would have turned out differently with another contractor.

  • @markbivens277
    @markbivens277 2 роки тому +2

    Another good one Stan, if hit the lottery I'd want you to be on my job of building my home.

  • @jakehccc1
    @jakehccc1 Рік тому

    I was a contractor for 11 years and totally understand you customer concerns creating negotiation issues. Every customer got a contract and a page I discussed the necessity for a customer to participate during the project to identify anything that is of any concern. It is critical because everyone has a perspective on what looks Great and what isn't. To inspect things at the end makes it highly unlikely if not impossible for us to change something. The satisfaction of the customer is paramount and what looks good to one may not look quite so good to another. You get my point. At the end of a project there is no negotiation possible. A paragraph on what minor defects there may be is acceptable.

  • @danceufo9256
    @danceufo9256 2 роки тому +1

    I had a contract split into 3 payments. I got ahead on the job and completed 95% before collecting the 2nd payment. For no reason the customer tells me to leave and that I would be trespassing if I return. A month of back and forth on the phone and an anxiety attack later (complete with ambulance ride because I thought it was a heart attack), I was finally able to collect the 2nd payment. Never got a penny for the rest of my work. The customer liked my work and her tactics were a total scam

  • @kammelryder
    @kammelryder 2 роки тому

    My grandson came in as your guy was explaining the 20 minute rule and yelled "It's Stretch Armstrong!!" good video as well.

  • @jackaffeldt
    @jackaffeldt 2 роки тому +1

    I’m currently dealing with a customer not paying because the dirt gets muddy when it’s wet. He told me he wanted 40 yards of black dirt spread out in his front yard and that’s exactly what we did. Some people are just out of their minds!

  • @StuArts-Kustoms
    @StuArts-Kustoms 2 роки тому +2

    I was a plasterer for 15 yrs and when you knew you Customer was like that we would put something noticeably that was easy to fix. So they could find something to pick on which made them happy (to tryto negotiate price) but we would fix the issue straight away.
    That customer with those blocks there was totally unreasonable and looking to save some money if possible, I personally would then go out of my way to solve there issue 2 or the 3 times. Must record the issues and your remedies though to use in court if need be so the judge can see your enthusiasm to solve any issues

  • @1farmer608
    @1farmer608 2 роки тому +8

    Hey Stan. This week has been a blast. I love my new job. Monday through Wednesday I was mowing on brand new mowers then yesterday and today I was cutting down a massive elm tree for one of our schools. I got to run the wood chipper (them things are loud and imitating) I also got to drive one of the case wheel loader and most of the city’s one ton dump truck pickups. Loved the wheel loader and the trucks. I got one hell of a farmers tan going lol.
    Got to go to my girlfriends grad party tonight which should be interesting. (Yes I did get her a gift).
    Have a great weekend Stan!

    • @Dirtmonkey
      @Dirtmonkey  2 роки тому +3

      Wow you go little man!! Proud of you and the work you're doing. Keep at it, God Bless, and go get emmm 😁👍

  • @James-blond007
    @James-blond007 Рік тому

    Gotta love those honest thankful customers!! 😮

  • @mitchdenner9743
    @mitchdenner9743 2 роки тому

    I love how your parrot is meowing.

  • @sofiadragon6520
    @sofiadragon6520 2 роки тому +1

    Knowing people who had similar things happen to their businesses by Trump in NJ is why I could never vote for him no matter who else was on the ticket. He had the money to pay, the work was done to spec, he just "wasn't happy" and wanted a deal after the job was over. Not honest, not good business.
    Not saying this to be political. I'm saying this because it doesn't matter how well off or respectable a customer is, they can still try to shaft you.

  • @KYMOUNTAIN
    @KYMOUNTAIN 2 роки тому

    This is the way! Brother God bless

  • @mikhail2400
    @mikhail2400 2 роки тому +5

    I recently had a slab poured for a small 30' x 20' shop and the first day I met the guy who ran the small company doing the work he almost felt like an old friend. I spent 25+ years fitting and welding pipe so I know what its like to have someone bird dogging you while you work. So I told this guy to just do the job and I wouldnt be hanging around nitpicking everything they did but if he did need me just give me a call. He and his guys did a quick, accurate, level and square slab for me, they also shoved some brush and other natural growth back making it much easier to get around the area.

    • @MikeGillett58
      @MikeGillett58 2 роки тому +2

      A year ago had a 20' X 20' slab with a stem wall "placed" for a small garage. The concrete fellow came over and talked for the 20 minutes, had a good idea of what I was talking about, kept communications open through text messaging, he took photos as he went, I felt he wasn't charging enough for his time (the prices of the material I knew, a neighbor was the supplier of the concrete)... when he was completedafter the placing of the concrete I gave him the final payment, plus $100 for each of th eworkers on the job. It was his business and his choice as to what he did with the money. The next year I needed some more concrete work done and experienced the same excellent service. If I need more in the future I will not hesitate to call this fellow, and recommend him to my neighbors. Having a neighbor in the concrete business did help, he was checking the concrete mix coming off his truck, the concrete guy didn't know this was a neighbor of mine and was surprised to see him at the job site when the concrete was delivered. I believe this hard working concrete man provides this type of service for everyone he does business with.

  • @MattyDardani
    @MattyDardani 2 роки тому +1

    I had a new customer for mowing a few years back. They gave us a verbal approval but due to people being scummy in the past I require a written approval (i.e. signed paper or an email or text that has the job description and price with them replying they accept please begin.) So we were still waiting for this client to send the written authorization the day we were supposed to start servicing their property. since I didn't have it we didn't go. the next day I got a text from this person saying how they are not happy at all.they said we blew clippings everywhere on walks the driveway deck cars it was a huge mess we hit the house a few times ripped up the yard etc. I told them we never went there because they didn't approve the work in writing. still have not heard back🤔.

  • @whitenoise546
    @whitenoise546 2 роки тому

    Y'all do a good job, Stanley! I enjoy your blogs and Victory Concrete in Wisconsin, though I'm toiling here in the crappy, yearly, Summer heat here in DFW.
    Some cool info and knowledge to take away when dealing with contractors. I always treat contractors as equals and gauge them on their ability to communicate and be open to my needs and at times, minor concerns. Hard work and I for one appreciate it what you guys put into it.

  • @frcconstruction
    @frcconstruction 2 роки тому +2

    Great video and Awesome 👏 insight. I definitely like your 20 minute rule and I also do something very similar with my customers on my job sites.

  • @osagejon8972
    @osagejon8972 2 роки тому +3

    I've had my share of clients that tried to nit pick and not pay. Fortunately my tree work and excavation work generally doesn't have a lot of material expenses so the few times I've gotten stung anymore more or less is just lost time, still don't like it but easier to let it go. I'm a person who loves what I do and enjoys interaction with clients about the project to the point I've had people say I just want you to do the work because I like you. Once that relationship is built the job is always fun and a client for life, sometimes friends for life. People like that know people like that and want you to work for them as well. On the other hand when your gut doesn't like something and you can't put your finger on why graciously decline the project. Never be afraid to walk away at any point but always exhaust your reasonable options to finish the job.

    • @Dirtmonkey
      @Dirtmonkey  2 роки тому

      Beautifully said. Be as friendly as you are and *always listen to your gut 👌

  • @duaneayers6117
    @duaneayers6117 2 роки тому +5

    I would highly recommend that you never ever do any types of big jobs for someone in your family. Unless you want to do it for free.

  • @mandelaeffect1111
    @mandelaeffect1111 2 роки тому +6

    Hard to bring it up right away if they need time to look for any tiny imperfections to try to use to their advantage. Karen’s go deep when they get desperate.

  • @functionalvanconversion4284
    @functionalvanconversion4284 2 роки тому

    Great discussion! This is a must and it's great you welcome feedback. Lack of communication leads to most of our societies problems (peoples perspectives of each other's position is almost impossible to understand). Thx

  • @CDPS
    @CDPS Рік тому

    Sadly, there are so many customers out there that you can go above and beyond for even do a bunch of free work and they still don’t appreciate it. We are very fortunate. We have a batch of repeat customers that love our work.

  • @johnnythediggerman684
    @johnnythediggerman684 2 роки тому +5

    I topsoiled a new lawn for a lady, moved heaven and earth to get there before spring break, 3 months later she wanted me to come back and retopsoil for free because the irrigation company had dug trenches and brought up stones

    • @Boomhauer333
      @Boomhauer333 2 роки тому +5

      She must've been smoking that hunter biden mozarella 🧀 cheeze

    • @Dirtmonkey
      @Dirtmonkey  2 роки тому

      People these days..

    • @darksu6947
      @darksu6947 2 роки тому

      @@Boomhauer333 Smoking actual crack would probably be better for you than smoking moldy cheese.

  • @boohoo4962
    @boohoo4962 2 роки тому

    I do flooring. I had a lady I knew was going to be a problem so I tacked an extra grand to the estimate. I would get home and see that she emailed me about flooring technics. Weird thing is she sent the emails while I was on the job and she was there. She paid without a problem but I'm so glad I added a little extra for having to deal with her.

  • @gregorymacneil2836
    @gregorymacneil2836 2 роки тому

    So on a retaining wall you should consider building a sample wall section and get it approved. Leave it in place until the job is finished and signed off. If the sample wall has defects then that is the standard. Use the block straight off the pallet so the colour is approved. Architects regularly ask for sample walls so a standard is established and everyone understands what the expectation is.
    One of the problems today is every customer thinks they are the only customer. We probably cater to customers more than we should for our own good!

  • @harrislandscapingpa
    @harrislandscapingpa 2 роки тому +1

    With all the business review sites out there, there's a real need for a review site where businesses review the customers.

  • @travisthompson292
    @travisthompson292 2 роки тому +4

    I'm only 3 minutes into this video and I already have to say I get it. I do flooring for a very high end company.. 90% of our customers are legit but some of our customers are crazy. What I do is craftsmanship. But if they can get a freebie they will... My goal is to never have call backs.... And I do beyond the 20 minute rule... If you let people know that you actually care usually they back off... But every now and then you have the one that will absolutely milk anything for a discount or free job

    • @Heb101922
      @Heb101922 2 роки тому

      I am a flooring contractor, and you speak the truth.

  • @thomaslockemy7187
    @thomaslockemy7187 2 роки тому

    That sideways ceiling mount light though 😂

  • @user990077
    @user990077 2 роки тому +1

    There was this lady I had done several jobs for in the past, no problem. She had this old 1950s mobile home she wanted to fix up (she was renting it out but had the couple evicted because they drank a lot and were trashing the place). Anyway, I started working on stuff but she stared whining about all sorts of things. The original wood doors in the kitchen had a satin finish. So when I repaired them and refinished them in satin she blew her stack .She said she wanted gloss. Anyway, she goobered gloss all over them and it looked like the fire department had hosed the kitchen down. Over the course of a couple of weeks I had several phone calls where we were both reduced to yelling at each other. I told her I quit. I ate several weeks of labor and a little under a thousand in materials but I am done with her for good. I have not ever yelled at anyone on a phone in the past, well, sixty plus years.

  • @davidmiller4594
    @davidmiller4594 2 роки тому +5

    I was a gc for 25 years in Hawaii. We do that 20 minute rule, actually just feeling out the customer, Before I even drop a bid. The bid is adjusted depending on how hard it's going to be to work with that customer. A big part of contracting is dealing with the customer. The work is the easy part.

  • @adamgray8333
    @adamgray8333 2 роки тому

    I've done lawncare for over 8 years.
    And only had 3 people not pay (70$/60$/60$)
    The last client.. ended up having grass dumped on their lawn for 2 weeks.
    When police were called, I showed them the contract for grass seeding and fertilizing THEY(client) signed for as well as weekly mowing.
    Told the officers they hadn't paid, but their lawn was so patchy, I gave them the free treatment for seed&feed.
    Cops laughed really hard.
    No changes laid
    We warned all the other companies in town to not deal with them ✌️
    Their lawn did come in pretty lush 🤷‍♂️🤭

  • @rodmorris3672
    @rodmorris3672 2 роки тому +1

    About 5 years ago we did a job for a lady in town that started as hauling some appliances to the scrap yard. Turned into a bigger more lucrative job which is always great we did a bunch of outside work and did some free work to make what we did look better. Got a call after the guys left complaining about the free work. I wasn't sure what to say

  • @skiprydoo
    @skiprydoo 2 роки тому

    You have Thor running your jobs? I'm impressed.

  • @davidrussell3353
    @davidrussell3353 2 роки тому +2

    I've been a plumber for fourteen years and people come up with some crazy stuff to try and get out of paying or get a discount I learned early on to take pictures before and after anything I touch also if they are interested in me doing the job I have them sign the estimate before I start

  • @perky5874
    @perky5874 2 роки тому

    I understand being a paint contractor I hear you 1000% they like it till you load the truck then it doesn’t look right not all the time just a couple a year maybe . Good luck and hope you have some clients that communicate makes jobs go so much easier. They don’t understand that we don’t make mine on call backs.

  • @concretedude4273
    @concretedude4273 2 роки тому

    Such an top notch, excellent channel, well done from San Antonio!

  • @classact9557
    @classact9557 2 роки тому

    Wow!!! That is a NICE looking Kubota skid steer. Looks like you guys just picked it off the lot the SAME DAY and took it straight to the job sight.

  • @markadler8968
    @markadler8968 2 роки тому +1

    The best thing you can do in that situation is leave IMEDIATELY, do not stay for one more minute. Take all of your tools, equipment and crew and move them to another site right away. Do not continue to work if a situation arises where you and the client are in disagreement. You are wasting your time trying to satisfy difficult clients anyways and more than likely will not get paid for the work. Nothing motivates people to resolve any issues they have than an unfinished project sitting there for months. No reputable contractor will even look at completing an unfinished project as it is a huge red flag.

  • @Quarry4x4
    @Quarry4x4 2 роки тому +2

    The one I get witch is often solved when you pull out before photos is things already broken that we are blamed for.

  • @robertnelson4755
    @robertnelson4755 2 роки тому +2

    I see a lot of problems with contracts. You need to put it in writing that the customer SHALL INSPECT ALL WORK, at this level, then again at this level, and again and again IN ORDER TO NAKE ANY CHANGES. Then say no changes will be allowed after each inspection. If they opt to not inspect then NO CHANGES are allowed at any time. Next, you need to put in writing that all, blocks, rocks, pavers, etc will have chips in them and that will not inhibit the structural integrity of the work.
    It took me years to fine-tune my contracts to place all the responsibility on the customer. One time a customer ordered something RED, when it was delivered it was the wrong "shade" of RED. After that I put in my contract "WHEN ORDERING ANYTHING WITH COLOR PLEASE SUBMIT A PMS COLOR CODE" From then on I never had a problem with "colors".
    Every time there is a problem change your contract to reflect it. I even put in my contracts WE WILL NOT UNLOAD OUR TRUCKS OR BEGIN WORK UNLESS WE ARE 100% PAID UP FRONT. That cured all negotiations for a lower price after the fact.

  • @serblackfish
    @serblackfish 2 роки тому +1

    I've had really good clients this year and last year. But 2 years ago, I had a sub-contractor hit the ease trough on on a project we we're completing. I immediately went to the client to break down the process(this is back when I didn't have well written contracts yet) and I talked to a another contractor to come and fix it. They ended up charging me for the whole house's ease tough after they brought their own guy, and replaced it before they let me fix it myself.
    Not a good situation. They deducted off my quote for the amount they spent, which was about 4 times as much as the one I had lined up. I learned that deposits, client profiling, and more importantly the terms and conditions are really important. I write in that I have the first right to fix what I've done wrong, and replace/fix anything that's broken.

  • @TreadwellJay
    @TreadwellJay 2 роки тому +5

    There used to be a site called "clients from hell" with similar horror stories. It was mostly about graphic designers, but people tried to pull the same kind of crap. Mission creep, endless revisions, happy until the last second for a discount. Gotta watch out for these folks no matter what ya do!

  • @jasonlytle319
    @jasonlytle319 2 роки тому +1

    First story about a company trying to cheat me; 10 years ago when I became a first time home owner my HVAC went out on July 4th weekend mind you I live in Arizona so it's over 100 degrees everyday and the only company that could make it out to the house had told me that my control board needed to be replaced before the AC could turn on and that it would take 5 days to get a control board shipped out. Luckily a friend of mine had shown up right as I was being told I'd be without AC, his dad was an electrician and callled a buddy of his who worked in HVAC to come take a quick look at the AC and when he arrived he informed me that the control board was only needed to run the heater not the AC and he had my AC back up and running before the first company had even left my house. Second story about a great company; I was getting my house repainted last year and from start to finish it was supposed to take 2 days, well after they had finished the owner came by to see how everything turned out and as we were talking he had pointed out he thought the colors looked off and after he made a phone call to his wife back at the office we found out that the wrong paint color was sent over with the guys who did the work, mind you the difference between the colors was unnoticable to me but the owner insisted that he have his guys come out the next day with the correct color I had originally picked out and repaint the house which to me is a sign of a buisness ran with honesty and integrity and when asked by a few people in the neighborhood on who painted my house I felt I had to tell them about the company I used and that even though they weren't the cheapest quote I had gotten that it was worth it in the long run seeing as how they could have said nothing in regards to the color issue and I would have never known.

  • @andybrooke1961
    @andybrooke1961 2 роки тому +3

    When I worked in Portland Oregon I ran into some people that always seemed to try to find fault. But talking to other contractors I started heating the same names of people who would do the same to other contractors. I had thought that it would be useful if contractors could have a website to list these problem customers so that we all could avoid them. A lawyer said this would not be a good idea.

    • @cuivre2004
      @cuivre2004 Рік тому

      I thought I had heard of a list like that- it was kind of a "reverse Angie's list".

  • @aaronward4790
    @aaronward4790 2 роки тому +1

    Hey stan thanks for the video. Finally got 4 hours of sleep so I was able to watch your video without falling asleep lol. Have a blessed day!!!

    • @Dirtmonkey
      @Dirtmonkey  2 роки тому

      4 hours is a lot for you? Lol geez

    • @aaronward4790
      @aaronward4790 2 роки тому

      @@Dirtmonkey it is with a new baby lol!

  • @J90-t4o
    @J90-t4o 2 роки тому +3

    I've been in the same position with walls! Here's my advice. Like stans points, they are manufacturing faults, simple as that. Yes big chips are no bueno...but if they want them replaced they pay for the time to go get the new material, also the overall project scope's square face feet goes up accordingly, and they have to pay for the time and material for reconstruction...this usually gets them quiet again....also! my ace in the hole is astonishingly good at knocking off scrap corners and then using your favorite adhesive, glue um right in that seam! The karens will never know!

  • @really2345
    @really2345 2 роки тому +1

    Those customers convinced me to leave the construction industry. The last customer signed off at each stage of the project, but at the end when we went to get our last 10% they said that they were not happy, refused to pay us the balance, and laughed at us saying that we could sue if we wanted. We put a lien on the house and sold the business.

  • @MommaARA
    @MommaARA 2 роки тому

    It's true about mental visualization. Dyscalculia is like being Dyslexic with shapes and numbers and the vision in your head. One of my daughters is an artist and self-taught. Brilliant work but if you ask her to visualize an apple in her head, she can't see it. Even though she as seen and eaten apples all her life she cannot see it in her head at all. Different forms of communication keeps you flexible and open to new ideas and ways of thinking.

  • @ftevids1715
    @ftevids1715 Рік тому

    Drawings and communication are key to understanding what a customer wants or needs.
    What I hate is having to fix someone else's screwups before you can even start your project.

  • @MC-dj7ri
    @MC-dj7ri 2 роки тому +1

    This is great stuff. Kudos for trying to implement a quality customer experience. And this is beneficial for customers to watch. As a customer, I wouldn’t want the crew or team to feel like they’re being micromanaged. But at the same time, customers need to engage for those potential, at the moment adjustments or corrections.

  • @foonus406
    @foonus406 2 роки тому +11

    One special customer, a doctor, greeted us when we arrived in the morning to do the job with "you're going to f something up, and I am getting this job for free"... needless to say we loaded the toolboxes back up and, unfortunately for someone else it became their problem.

    • @petesland8276
      @petesland8276 2 роки тому +1

      If you mention the words I’m a Doctor or Lawyer, we are 2 years before we can schedule you in.

  • @jasonhansen6632
    @jasonhansen6632 2 роки тому

    I have found that the more you bend to help someone, the more they are unhappy or the more they want. Favors equal headaches. I usually end up doing work for friends and family for free because i want to keep them friends and family. I work construction for big name faceless corporations and that is how i make my money. When i do a job for my mother/brother/in laws, I just say, " I don't make my money from friends and family, if i choose to do something for someone I chalk it up to relationship equity and it usually balances out to what I get from them. It can't be lop sided because it just breeds resentment.

  • @sk00t3r8
    @sk00t3r8 2 роки тому +2

    customer interaction and building relationships with customers is key to success, good vid, prevents bad word of mouth, increases repeat business 👍

  • @JaneDoe-ve5lr
    @JaneDoe-ve5lr Рік тому

    I love your log cabin. It's beautiful.

  • @DrFrankenschtein
    @DrFrankenschtein 2 роки тому

    I really like the idea of the 20min rule. Good stuff, I'm going to apply that to my own work. Thank you!

  • @alexfortune8545
    @alexfortune8545 2 роки тому

    I work for a landscape outfit here in Canada. Were small but we do big jobs,just sod soil and hyrdoseed no mowing. We were doing street restoration,just sodding and soiling shoulders of road to what was re paved and there were a few houses who's yards they had to cut into. We get to this one yard and the front was a drop off slope into a ditch pretty much,he tried saying that he used to be able to ride a ride on mower down and up it,and fought with us to get soil and sod to his degree,after he cried to the town to come out the engineers told him what he wanted was 1 impossible and 2 if he wanted anything outside of what we were doing already he's gunna be the one paying. He went back inside to never bug us again and never herd a damn thing about his yard,people will try to get anything for free if they find the open window

  • @danlarry7020
    @danlarry7020 2 роки тому +1

    It's also one of the strange benefits to trying to get your pricing to be above the average market value. When I first started out as a handyman I was charging the lowest hourly rate for my market, and in that short period of time had more problematic/rude/nickel and diming customers than I've ever had since. I actually laughed when I increased my hourly rate by $20 and then eventually $30 and consequently started to get higher quality customers, far fewer headaches in general. Anyone else have this experience?

  • @joedurkin8953
    @joedurkin8953 2 роки тому +1

    As a custom painter we were clearing a room moving a 8 foot tall glass giraffe 4 men and me supervising with the customer present as the 4 men gently lifted the giraffe the bottom of one of the legs fell off and laid on the carpet the customer says "you broke it you bought it". I told her "no way that we are taking responsibility for that and set the giraffe back into place set the broken leg back under it and packed up and left. Ate the cost of the morning and paint that was purchased. I have many more stories like this and was super cautious of these kind of things.

  • @TheTidobanditto
    @TheTidobanditto 2 роки тому +16

    Could being upfront about these chipping concerns eliminate pushback in the middle or end of a project? Mentioning that chipping is expected to a certain degree could be part of the CYA protocol.

    • @mikhaelshadow
      @mikhaelshadow 2 роки тому +1

      I agree with you to further eliminate issues like this he could have a few of those blocks in the pick-up truck to show the customer before installation that way they can't turn around and say well that's not what we want.

    • @N0xiety
      @N0xiety 2 роки тому

      An option for extra care and only using the undamaged blocks in a batch to build an immaculate wall could be the solution. Just give the customers options, have some pics ready for them to be able to visualize what the end product will look like, then let them decide. I don't see a reason for them to not be able to build a perfect wall if they really want to, but it would also obviously cost more for the premium care and wasted blocks.
      Then again, i guess the chipped blocks don't have to be wasted, could be used in other jobs, maybe also have a slightly cheaper option for other customers to make use of these leftover chipped blocks. I'm sure there would be someone who doesn't care about the aesthetics in such detail and can accept all the blocks being slightly chipped, like for example me, i care more about function and i would take a cheaper deal if all i had to put up with is slightly corner chipped blocks.

  • @kevinwalas619
    @kevinwalas619 2 роки тому +1

    Great video as usual, I maintain about 86 mowing accounts. I'm not the owner but everyone of my customers knows my name and I know there's and I speak with them on a regular basis!!! We like to call it " lip service " lol. Again great video

    • @concretedude4273
      @concretedude4273 2 роки тому

      I am always interested at the 'mowing' business model. 86 accounts, at that number you must really need to be good at logistics, repairs, and managing your workers. What does an average mowing account pay every month in the industry? I pay my homeyard guy 190 a month in San Antonio and he is in and outin 30 minutes. Very interesting stuff, stay safe!

  • @williamlance6132
    @williamlance6132 2 роки тому +2

    I was starting my own carpentry business and the guy acting as the general contractor kept adding extras that they refused to pay for or requesting I move a floating floor 1.5 inches or rotate the whole floor. I ended up just taking the loss. Packed my tools and left the keys to the place with a never contact me again for anything (not as polite as I just wrote here).

    • @Dirtmonkey
      @Dirtmonkey  2 роки тому +2

      Sometimes ya just do what ya gotta do. The customer is NOT always right

  • @hertmybrane8896
    @hertmybrane8896 2 роки тому

    Alex is one of the most Thor-looking dudes I've ever seen

  • @1mean1
    @1mean1 Рік тому

    I am not a contractor but wanted to tell you about a job we once did. I and another partner owned a higher end garage and body shop. We specialized in rust repair with guarantee and custom paint. After our first year, my partner and I agreed to give a random customer a free tune-up, brakes, tires and paint job to celebrate our 1st year in this city. After we decided on the 3rd car that came into the shop, they would get this freebie. He didn't seem all that happy about it and then he said he wanted another color on the car than what it came with. We hadn't anticipated this. After some discussion, we agreed but then he insisted on painting the door jams on a 4 door vehicle because he wanted them to match. OUCH! There's more work in sanding and painting the jams than painting the whole outside of the car. I asked him about the color he wanted and it would go from blueish green to red. So he thought. He chose the color from one of our paint books and those reference chips are only 3/4"x3/4" and if you aren't a painter, you won't be happy because the chips are very misleading. The paint chips are not an exact color match and are only intended to give body shops an idea of the color information. After some arguement, we painted the car "his" chosen color and after it was finished he complained to anyone in the garage how terrible the color looked. He really wanted fire engine red, but the color he chose was more like red oxide primer. I told him this is what it would look like but he demeaned me like I didn't know anything about paint! He never once said thank you. After new tires, tune--up, brakes and over-all paint job, we told him to leave and not come back! We never did a freebie again.

  • @fi77er
    @fi77er 2 роки тому

    Here in Australia you have to be a licensed builder then you join the Master Builders in your state. If that situation happened here the builder would refer it to them (the client could also). If the work was to specification they would inform of this and tell to pay up, the client has no legal re-coarse from there.
    The client can also contact Master Builders if the work done was a nightmare once finished and they pay for another builder to fix it. They are affectingly insurance.

  • @dougsmith7757
    @dougsmith7757 2 роки тому

    This is 100% spot on. 20 minute rule full on thumbs up!