Well Foundation Construction Process | Deep Foundation | Step By Step Bridge Construction

Поділитися
Вставка
  • Опубліковано 12 тра 2021
  • Well Foundation Civil Construction Process | Deep Foundation Bridge Construction | Civil Engineering
    In this video you will learn about the process involved in the construction of well foundations, well foundations has following components
    1. Cutting Edge : it is the lower most component of the foundation, it is provided to facilitate sinking operation of the well, when we start sinking procedure it helps in providing us proper space for sinking to keep is smooth process. it is made up of either steel plate of concrete, in case of steel we provide two 12 mm thick plates placed back to back and welded.
    2 . Curb : it is concrete structure just above the cutting edge, it helps in transferring the load of the well to the cutting edge.
    3. Steining : It is the most important part of the well, it is the main wall of the structure, it is the structure which is considered in the design as it serves the main purpose of load transfer.
    4. Bottom Plug : It is a closure component of the well in the bottom, after completion of the sinking operation, excessive excavation can cause damage to the main structure, in other words complete stability will not be achieved, to serve this purpose we close the bottom portion of the well by placing concrete upto curb height, at greater depth, we cant see the actual level of concreting so we always keep is assumed.
    5. Top Plug : After filling the hollow portion in the well with suitable material like sand, we close the upper portion with concrete, and this concreted portion is called as top plug.
    6. Well Cap : It is a final structure of the well which transfer the load of the bridge to steining by means of pier or abutment, means to transfer the load of the bridge to well foundation this well cap is constructed..
    Construction Steps of Well Foundation :
    1. Preparation of Cutting Edge : It is prepared with the help of the fabricators on site at the position where we foundation is to be constructed.
    2. Construction of Curb : We start shuttering work just after we place the cutting edge in position and all the process of reinforcement work and concrete casting work is completed and after setting of concrete the shuttering is removed and curing and guage marking are done.
    3. Sinking of Well : After this process we can start the sinking of well is started, for this purpose we use grabbers, which excavates the earth inside the well and sinking operation proceeds.
    4. Steining Construction : After the sinking process get started we construct the further steining lifts and the process of sinking continues in same manner.
    5. Bottom Plug Concrete : After we complete the sinking operation, we start the bottom plug concrete operation with the help of tremmie pipe arrangement.
    6. Sand Filling : the hollow portion above the bottom plug is filled by sand of the similar material upto bottom level of top plug. during filling of sand compaction of sand is also done.
    7. After filling the sand we close the well with the help of top plug concrete.
    8. And in the final stage we construct a RCC Well cap on the top of bottom plug, and finally we can start the construction of sub structure.
    Join Our Channel if You Want to Support Us
    Join Here : / @civilgyaan
    DISCLAIMER
    All the videos, songs, images, and graphics used in the video belong to their respective owners and I or this channel does not claim any right over them.
    Copyright Disclaimer under section 107 of the Copyright Act of 1976, allowance is made for “fair use” for purposes such as criticism, comment, news reporting, teaching, scholarship, education and research. Fair use is a use permitted by copyright statute that might otherwise be infringing.
    kua kese khoda jaata hai, well construction, well foundation, well below bridge, pier on well, bridge construction on river, gaav me kua, khet par kua, well foundation construction, well foundation size, well foundation construction process, kue ka paani kese nikale, well excavation, well foundation excavation, Well foundation,conventional method of well digging,well construction,bridge in river,highway construction,bridge construction,well curb,कुआं,cutting edge,sinking of well,major bridge,major bridge span,deep foundation type,well excavation,check water with coconut,construction training civil engineer,site training civil,civil site internship,site training course,civil engineering,civil engineer,civil site training,training for fresher civil, Well foundation,conventional method of well digging,well construction,bridge in river,highway construction,bridge construction,well curb,कुआं,cutting edge,sinking of well,major bridge,major bridge span,deep foundation type,well excavation,check water with coconut,construction training civil engineer,site training civil,civil site internship,site training course,civil engineering,civil engineer,training for fresher civil,#well foundation
    #civilgyaan #WellFoundation #deepfoundation

КОМЕНТАРІ • 82

  • @CivilGyaan
    @CivilGyaan  2 роки тому +2

    Pile Foundation Construction - ua-cam.com/video/pEj3qO489cE/v-deo.html

  • @suyashtripathicivil1289
    @suyashtripathicivil1289 3 роки тому +6

    I m working on well foundation... so I can understand how much effort take this process... very time taking work.

  • @ravikanthsri-
    @ravikanthsri- Рік тому +1

    I appreciate the clear explanations and visuals that made it easy to understand. Keep up the great work in sharing educational content like this.

  • @kishordas7130
    @kishordas7130 3 роки тому +3

    I am an engineer. It is very helpful and knowledgeable for bro construction engineer.

  • @abdulwaris_kenue
    @abdulwaris_kenue 2 роки тому

    Absolutely amazing video. Thanks.

  • @ChandanYadav-op1pl
    @ChandanYadav-op1pl 3 роки тому +2

    Bhai kamal ka explanation hai

  • @shriramspatil7866
    @shriramspatil7866 2 роки тому

    Very good, step by step discriptive explained.

  • @Nabanyash_Sarmah1
    @Nabanyash_Sarmah1 Місяць тому

    Very well explanation 🙏🏻

  • @bsvarshney4001
    @bsvarshney4001 11 місяців тому

    Well explained well foundation . Thanks

  • @neelankusekhar9949
    @neelankusekhar9949 11 місяців тому

    Thanks a lot.

  • @vgkshorts
    @vgkshorts 3 роки тому +1

    Very knowledgeable

  • @jayranjanyadav530
    @jayranjanyadav530 Рік тому

    Amazing presentation brother 👍🏻👍🏻👍🏻

  • @bestvideos8844
    @bestvideos8844 Рік тому

    best video bro..

  • @priyankapal3549
    @priyankapal3549 8 місяців тому

    This video Is useful for us thank u sir

  • @5-minsgk101
    @5-minsgk101 3 роки тому

    Very useful video sir 👏👏

  • @ChallHatt
    @ChallHatt 8 місяців тому

    great.

  • @seemakolhe7904
    @seemakolhe7904 Рік тому

    Excellent explaination

  • @IndrajeetKumar-bd3vs
    @IndrajeetKumar-bd3vs 3 роки тому +6

    For prevent excessive sinking just check the sump regularly
    Perhaps sump should not be more than 3 mtr.

    • @manuyadav6316
      @manuyadav6316 2 роки тому

      Can you give your phone no...
      We need well sinking bridge contractor or skilled person

  • @lokeshchaturvedi5418
    @lokeshchaturvedi5418 Рік тому

    Very useful information for which person those not working in well foundation in his carrier

  • @sandeepkumarshukla20
    @sandeepkumarshukla20 3 роки тому

    Great!

  • @hemhaka2642
    @hemhaka2642 2 роки тому

    Bohot barhiya

  • @nawarajneupane674
    @nawarajneupane674 2 роки тому

    Very informative

  • @SandeepKumar-xl5oo
    @SandeepKumar-xl5oo 2 роки тому +1

    Bahut badiya

  • @sajalbiswas4781
    @sajalbiswas4781 3 роки тому

    Very well explanation Sir ji

  • @rajsaini5187
    @rajsaini5187 Рік тому

    Thank you very much sir 🙏

  • @animatemaps
    @animatemaps 6 місяців тому

    thank you bhaiya

  • @Dremy_Date
    @Dremy_Date 3 роки тому +4

    Best Explanation 👌

    • @Dremy_Date
      @Dremy_Date 3 роки тому

      Can you Do a video on Well foundation tilt shift calculation, How to calculate?

  • @civilmedia8320
    @civilmedia8320 3 роки тому

    Nice..

  • @Ajay_ojha872
    @Ajay_ojha872 3 роки тому

    Unique video like sir nice video, can u make like this video on pilling step by step which things should be remembere like this.

  • @rajsaini5187
    @rajsaini5187 Рік тому

    Nice explanation sir

  • @ghulamhassan311
    @ghulamhassan311 2 роки тому

    Thanks

  • @dronachaudhary
    @dronachaudhary 2 роки тому +1

    What I actually searching I get here !

  • @erkamleshprajapati8368
    @erkamleshprajapati8368 2 роки тому

    Thanks sir

  • @abhishekfaridvar3321
    @abhishekfaridvar3321 2 роки тому

    Thanku sir 🙏🏻🙏🏻🙏🏻🙏🏻🙏🏻🙏🏻🙏🏻

  • @ashutoshgupta9250
    @ashutoshgupta9250 3 роки тому +2

    Sir please provide how to calculate reinforcement in the well

  • @naveenragi7581
    @naveenragi7581 2 роки тому

    equipments to be set up to check tilt & shift of well foundation please inform

  • @hariomchandra9048
    @hariomchandra9048 2 роки тому

    For concrete casting in well stening what should be its slump value

  • @biswa3646
    @biswa3646 3 роки тому +1

    Sir best site video

  • @soumyapattanayek9902
    @soumyapattanayek9902 2 роки тому +2

    Sir I need a more knowledge about well foundation. About all process and failures also of well foundation. So please make a long only about well foundation in river with a huge briefly details as well as possible. Please

  • @g.sunilnaikg.sunilnai7996
    @g.sunilnaikg.sunilnai7996 2 роки тому

    Bhai im fan of you now

  • @supragyaa
    @supragyaa Рік тому

    gr8

  • @mahalingamkarthick1506
    @mahalingamkarthick1506 11 місяців тому

    Practical Explanation

  • @karansaroj7766
    @karansaroj7766 2 роки тому +1

    Good information,sir please give me any vendor for intake well by sinking method

  • @chamangupta4624
    @chamangupta4624 2 роки тому

    Bhut shi

  • @ramjeetverma8369
    @ramjeetverma8369 Місяць тому

  • @harshaggarwal1960
    @harshaggarwal1960 2 роки тому

    ❤️❤️❤️❤️

  • @SANTOSHYADAV-pm8iy
    @SANTOSHYADAV-pm8iy 3 роки тому

    👍👍👍

  • @barsanayak7093
    @barsanayak7093 Рік тому

    ✔️

  • @sumanmaiti9097
    @sumanmaiti9097 3 роки тому +1

    Sir please Make a video on cutting length and compare IS CODE 2502-1963 vs normal bend deduction method (45° =1D ,90° =2D) , which method is right , please explain in easy language . Please sir also prove 45°= 1D as per IS CODE in written with page no and clause no

  • @CIVILENGINEERINGCLASSES-hi8bh
    @CIVILENGINEERINGCLASSES-hi8bh 3 роки тому

    🙏🏾🙏🏾🙏🏾

  • @devanandjr5084
    @devanandjr5084 Рік тому

    Nii yarrrr thambiii😃

  • @MustafaAli-lz8ih
    @MustafaAli-lz8ih 2 роки тому

    Agar well kisi site ko sift ho to sifting kaise sahi kare

  • @ashu9744
    @ashu9744 2 роки тому

    Very nice but I had to watch it at 1.5x❣️

  • @GRIIM._.REAPER
    @GRIIM._.REAPER 2 роки тому

    Sir kitne width rakhne cahiye?

  • @Ajay_ojha872
    @Ajay_ojha872 3 роки тому

    Sheet pile mein kitne offset per lanaga chhaiye actual layout se

    • @CivilGyaan
      @CivilGyaan  3 роки тому +1

      Depends on area required for the work, like space for the vehicle movement, crane working area etc.

  • @ananyagupta789
    @ananyagupta789 3 роки тому

    Could u please share a video which was shoot at site- physically

    • @CivilGyaan
      @CivilGyaan  3 роки тому

      If I will be doing it next time on site, definitely I will share that..🙏

  • @sukeshsingh4140
    @sukeshsingh4140 7 місяців тому

    Sukesh singh cood❤

  • @akbob6466
    @akbob6466 2 роки тому +1

    Good video.. pronunciation is important… island is not pronounced as iec-land it is pronounced i-land

    • @CivilGyaan
      @CivilGyaan  2 роки тому

      I know, but sometimes it happens with me..😂 I was sure that someone will comment about it, and see! Here is the first..

  • @partha1538
    @partha1538 3 роки тому +1

    Sir nice video. One doubt sir. Dredging karne ke baad beech mein toh sirf paani rahega. Usmein bottom plug ka concreting kaise karte hai ? Matlab paani ke presence mein concreting karne se kuch bhi effect nahi hoga kya sir ?

    • @CivilGyaan
      @CivilGyaan  3 роки тому +1

      Uske liye tremie pipe use hota hai, jaise boom placer ka rubber wala pipe hota hai waisa hota hai tremie pipe, usko paani ke andar daalkar, phir upr se hopper me concrete daala jaata hai, usse seggregation nahi hota aur concrete ki quality maintain rehti hai.

    • @partha1538
      @partha1538 3 роки тому

      @@CivilGyaan Ok sir got it. Thank you.

  • @milonbairagya7282
    @milonbairagya7282 2 роки тому

    Sir ji pura excavation karne ka bad structure ka Kum q start nehi karte .....???

  • @SoniyaAwasthi-i8t
    @SoniyaAwasthi-i8t 24 дні тому

    sir interviews m kon se question hote hai tntake well me

    • @CivilGyaan
      @CivilGyaan  20 днів тому

      Interviewer kuch bhi puch sakta hai. Ek wo hi hai jinka koi bharosa nahi hota 😃. Iske liye aapko experience lena padega site par jakar.

  • @user-yy2kl9xj8t
    @user-yy2kl9xj8t 5 місяців тому

    7:50

  • @structuraldrawingsforfresh9437
    @structuraldrawingsforfresh9437 3 роки тому

    Sir well k bbs ka ek video banaiye iska sara details mere pass hai 12 m dia k well ka lekin iska bbs nahi hai
    Mere pass iska design documents and estimate and structural design ka v file v hai lekin iska bbs nahi hai

  • @structuraldrawingsforfresh9437
    @structuraldrawingsforfresh9437 3 роки тому

    Ak or engineer ne iska video upload kiya hai usme
    Cutting edge se well tak ka video hai ak hi video me

  • @civilwithD
    @civilwithD 2 роки тому

    Sir first excavation hi q nhi kr lete h then structure kya possible h

    • @CivilGyaan
      @CivilGyaan  2 роки тому

      Wo bhi possible hai par, kyu ki well foundation ek deep foundation ka type hai isliye hum jyada deep manually excavate nahi kar paate, machinary utaarna costly padta hai, uske alawa aap river me ya deep level me paani aane par manually excavate nahi kar sakte

  • @kishordas7130
    @kishordas7130 3 роки тому +1

    Sir please make a video on bend deduction as per is code 2502 1963

  • @pushkarkumar6658
    @pushkarkumar6658 3 роки тому +1

    Sir mera naam Pushkar kumar hai.hum fresher engineer hain sir .sir site pe bahut hi problem face kerna par raha hai.sir mera wattesep number 9608595635 hai.sir aap apna wattesep number dijiye taki jo bhi problem ho raha hai aap se help maang sakun.

    • @CivilGyaan
      @CivilGyaan  3 роки тому

      Itna stress mat lo bhai, sab thik ho jayega, or kuch bhi problem ho bindas youtube me comment kr ke pucho, mujhe aap sab ke comments milte hai.