    In this session, we are explaining the test performed on the Pile foundation
    The following tests are important to conduct on Pile foundation :
    1. Static Load Test ( Initial Load Test ) IS CODE 2911: Part 4
    2. Dynamic Load Test IS CODE 2911: Part 4
    3. Non- Destructive Integrity Test ( Sonic Logging Measurement Test )
    IS CODE 14893: 2001
    Why testing is important or required?
    1. Client ensure for the safety and quality purpose
    2. To revise the working drawings
    3. For quality control and assurance.
    Static Load Test: This test is to be performed on the Test pile after 14 days or 28 days of completion of concreting of a particular pile. This Hydraulic jack is fitted with and mounted on the pile on which the bearing plate will be get placed both at the top and bottom of the hydraulic jack.
    The test load which will be 2.5 times of Design safe load will get impressed and get compressed upon the bearing plate which is mounted on a Hydraulic jack through Hydraulic Jack, The acting load will be transferred to the pile, how much the displacement/settlement will get visual with the device connected through pressure gauge with pile through the wire.
    This test is to be carried to find out the load-bearing capacity of the pile. This procedure will be get repeated multiple times until a desirable result is achieved.
    Less settlement means the pile is safe, which allows going for regular pile work.
    If high range settlement means to design and specification of the pile should be changed and testing will be repeated again.
    Dynamic Load Test: This test is also to be performed on the Test pile after 14 days or 28 days of completion of concreting of a particular pile. In this test the dead load ( kinematic )which will be 2.5 times of design safe load will be hanged through a hydraulic crane with rope at a certain measured calculated height, later allow to free fall of dead load on the Test pile and settlement will be get measured by the device called PDA ( Pile Deflection Analyser ) through which different graphs will be get noted through if high deflection shows the settlement of pile is maximum, the pile is not safe.
    Deflection graphs show and signify the settlement of the pile and the bearing capacity of the pile.
    Static and dynamic load test is to be carried out on test pile and Non-destructive integrity ( Sonic Logging Test ) is non-destructive to be carried out during the driven of the pile.
    Non-destructive integrity ( Sonic Logging Test ) signifies the internal performance of concrete in the pile.
    SONIC LOGGING MEASUREMENT TEST: Through this test we identify whether the concreting in the pile is proceeding smoothly or not, to ensure the diameter of the pile should not get disturbed through the depth of the pile.
    High ultrasonic frequency wire will get inserted in the boring hole which is in touch with 2- 3 steel bars in the reinforcement case and during concreting transducer and receiver will activate in following to attached with the device which shows the actual performance and workability of concrete.
    Related Videos:
    1. How to Calculate Shuttering Area of Pier and Pier Cap in Bridges: • How to Calculate Shutt...
    2. How to Calculate Quantity of Backfilling: • How to Calculate Quant...
    3. How to Calculate Backfilling Quantity: • How to Calculate Backf...
    4. Earthwork Excavation of Building Foundation as per CPWD: • Earthwork Excavation o...
    5. Earthwork Excavation For Building Foundation as per CPWD: • Earthwork Excavation F...
    6. Earthwork Excavation and its Types: • Earthwork Excavation a...
    7. Description of Earthwork Excavation work -CPWD In Online: • Description of Earthwo...
    #Bridge
    #constructionbridge
    #pilefoundation
    #pile
    #pier
    #pilecap
    #pilecapbbs
    #piercap
    #deckslb
    #girder
    #civilengineeringvideos
    #civilengineer
    #siteengineer
    #augerboringmachine
    #bentonite
    #ploymermix
    #concretemixture
    #formwork
    #boxgirder
    #precastgirder
    #casing
    #sonicloggingtest
    #staticloadtest
    #dynamicloadtest
    #lateralloadtest
    #verticalloadtest
    #testpilefoundation
    #structuraldrawing
    #layout
    #minorbridge
    #majorbridge
    #flyover
    #fob
    #civilengineeringvideos
    #onlinecivilengineering
    #civilengineerstraininginstitute
    #quantitysurveyorcourse
    #quantitysurveyinginstitute
    #estimation
    #pilecapbbs
    #pilebbs
    #pierbbs
    Download NOW: Reinforce Civil Engineers Learning App
    👉🏻Android App Version: play.google.com/store/apps/de...
    👉🏻IOS Version: apps.apple.com/in/app/myinsti...
    Org code : avywj
    👉🏻Web Version: https:web.reinforceqst.com/
    For assistance and Queries you may call or whatsapp at +919711155585 , 9958731610
    For more updates join us
    Telegram Channel: t.me/joinchat/F-LY5s4olDw2MjVl
    Call or WhatsApp at +919711155585
    Follow Us on; Facebook : / reinforceqstpl
    Instagram : / reinforce_qst
    Twitter : / reinforce_qstpl

КОМЕНТАРІ • 160

  • @muhhammadarif5241
    @muhhammadarif5241 17 днів тому +1

    good job bro thanks for sharing knowledge with us

  • @GauravKumar-ez8pp
    @GauravKumar-ez8pp 3 роки тому +9

    Best coaching for civil engineer..

  • @suyashtripathicivil1289
    @suyashtripathicivil1289 2 роки тому +1

    Again a very knowledgeable video for civil engineers

  • @sanjeetrajan1432
    @sanjeetrajan1432 2 роки тому +1

    Best knowledge of civil engineering

  • @adityachaubey7478
    @adityachaubey7478 2 роки тому +1

    Thank you sir. your way of teaching is great.

  • @freemotionbykhanshaheb
    @freemotionbykhanshaheb 27 днів тому +1

    great Sir..........

  • @jamalshah9873
    @jamalshah9873 Рік тому

    I don't watch videos longer than 5minutes but in your videos 30 minutes pass like 3 minutes thank you well explained sir

  • @pankajrawat1685
    @pankajrawat1685 2 роки тому +2

    Sir, Very very informative for who interested & involved in civil egg and allied works.. thanks you very much.

  • @ramniwaschauhan4355
    @ramniwaschauhan4355 Рік тому

    Very Good Training.God Bless U

  • @shubhambunty7163
    @shubhambunty7163 3 роки тому +2

    sir ap bahut accha se samghate hai......mughe apka video sabse jyada accha lgta hai......isi tarah ka contant dete rahiyega sir..... 👍
    next video on girdar pe...

  • @piyushchauhan4381
    @piyushchauhan4381 3 роки тому +7

    Dear Respect Nishant Sir, You are Best Faculty of Civil Engineering Students.
    Great Work.
    Thanks a lot!

    • @MuhammadAkram-de3pv
      @MuhammadAkram-de3pv Рік тому

      I hope you will give very useful feedback to the Engineers brothers thanks a lot

  • @priyankatrivedi1820
    @priyankatrivedi1820 3 роки тому +3

    Great job 👍

  • @Khadeer-tz8se
    @Khadeer-tz8se Рік тому

    appreciable explanations

  • @MuhammadAkram-de3pv
    @MuhammadAkram-de3pv Рік тому

    Very good explanation for the pile tests

  • @lalit9062
    @lalit9062 2 роки тому +1

    Nice explained sir .
    Thank you so much 🙏.

  • @rishijha4209
    @rishijha4209 3 роки тому +3

    Marvelous sir. Waiting

  • @muralijanu
    @muralijanu 9 місяців тому

    Good information & u r teaching is verygood.

  • @amazingcivilengineering
    @amazingcivilengineering Рік тому

    Thanks for your valuable information

  • @khanfahad93
    @khanfahad93 2 роки тому +1

    Good lecture
    Thank you Sir💯💯

  • @amritranjan2035
    @amritranjan2035 2 роки тому +1

    Pls continue it sir it is awesome video 🙏🙏

  • @MithileshKumar-ls2pg
    @MithileshKumar-ls2pg Рік тому

    Very good help ful video
    Thanks

  • @YogendraSingh-qt5kd
    @YogendraSingh-qt5kd 2 роки тому +1

    Very nice video.
    Keep on.

  • @dipnarayanmandal3761
    @dipnarayanmandal3761 2 роки тому +1

    Thank you sir, aap ka video bahut achha lagta hai.

  • @santosh_raut_777
    @santosh_raut_777 2 роки тому +1

    Nice information sirji 👍👍

  • @priyankatrivedi1820
    @priyankatrivedi1820 3 роки тому +3

    Very nice video 👍

  • @vaishalin29
    @vaishalin29 4 місяці тому

    Good information.. thanks sir

  • @rajendrajaisawal8693
    @rajendrajaisawal8693 3 роки тому +2

    Best class
    Thanks sir

  • @motivationalmorning2023
    @motivationalmorning2023 8 місяців тому

    Aapka video dekhke bohot help hua
    thank you sir

  • @erkundanyadav
    @erkundanyadav 3 роки тому +2

    Very good informative video sir

  • @rajdayma6410
    @rajdayma6410 2 роки тому +1

    You are rock 👍

  • @archconstructionbuilding5409
    @archconstructionbuilding5409 3 роки тому +3

    Waiting!🙏

  • @zohaibmangat7826
    @zohaibmangat7826 Рік тому

    Excellent

  • @komaljatav8011
    @komaljatav8011 2 роки тому +1

    Very nice information

  • @SIKANDARKUMAR-my4zk
    @SIKANDARKUMAR-my4zk 2 роки тому +1

    Congratulations sir

  • @user-hy3ke8ow8l
    @user-hy3ke8ow8l 6 місяців тому

    Sir .good lecture ❤

  • @satyendrakumaryadav3048
    @satyendrakumaryadav3048 2 роки тому

    Your all video very good

  • @Bellbottom.
    @Bellbottom. 2 роки тому +1

    Thank you sir

  • @nirmal3214
    @nirmal3214 2 роки тому +1

    Please make a video on concrete pouring procedure in pile while underground water table is very very high

  • @rohit1205
    @rohit1205 3 роки тому +3

    Sir lecture is very useful... thanks

  • @civilengineeringfromgoldme3074

    Appreciated

  • @skmoni455
    @skmoni455 Рік тому

    Awesome

  • @adityachaubey7478
    @adityachaubey7478 2 роки тому +1

    Superb sir

  • @ajoykumar8476
    @ajoykumar8476 2 роки тому +1

    Good idea

  • @sauravgarg31
    @sauravgarg31 3 роки тому +6

    Nishant sir always rock

  • @manishkumar-vx1ke
    @manishkumar-vx1ke 2 роки тому

    Very important

  • @MDARSHAD-uc7iu
    @MDARSHAD-uc7iu 2 роки тому +2

    You should mention permesible settlement & displacement in video

  • @rajsaini5187
    @rajsaini5187 Рік тому

    Thousands times thanks sir

  • @globalnews5462
    @globalnews5462 Рік тому

    Yr maza aa gya ap ka lecture sun k dekh k. Bht behtreen. Tha yr.Allah ap ko kqmyab kray. Bht detail sy btaya ap ny..
    1 chiz miss ki ap ny. Ap bta rhy thy k settlement check krty hain. U should also tell. How much settlement allowed. In both static and dynamic load test.

  • @erkundanyadav
    @erkundanyadav 3 роки тому +2

    Some Residential Building video also sir

  • @rahulGamer-cp8nk
    @rahulGamer-cp8nk 10 місяців тому

    Thanks sir

  • @kalpajverma9605
    @kalpajverma9605 2 роки тому

    Nice video

  • @ranjansahoo8904
    @ranjansahoo8904 2 роки тому +1

    Please give one class on load bearing pile.

  • @riyazshah4915
    @riyazshah4915 3 роки тому +3

    Sir app bridge ma all drawing ka video kariye bbs ka.. Reinforce kaa details kaa pill pier girder. Psc pill cap

  • @rajakumarvernekar8574
    @rajakumarvernekar8574 2 роки тому

    Very nice 👌 vedio

  • @anshugupta2215
    @anshugupta2215 3 роки тому +2

    Plz make more video sir

  • @SONUCHAUHAN-xx8hd
    @SONUCHAUHAN-xx8hd 2 роки тому +1

    Nice

  • @dineshgehlot3134
    @dineshgehlot3134 Рік тому

    very nice

  • @deepakkumarpandey6696
    @deepakkumarpandey6696 3 роки тому +2

    nice

  • @Its.CivilEngineering9
    @Its.CivilEngineering9 6 місяців тому

    ❤❤

  • @naimatalam9844
    @naimatalam9844 2 роки тому +1

    good

  • @rohitkushwaha3031
    @rohitkushwaha3031 Рік тому

    Sir bahut achha samjhaaya aapne plz provide me quality master plan you showed me in this video

  • @jitenkalita9866
    @jitenkalita9866 2 місяці тому

    nice sir

  • @motivationalmorning2023
    @motivationalmorning2023 8 місяців тому

  • @deepakkumarpandey6696
    @deepakkumarpandey6696 3 роки тому +1

    Sheathing pipe high density polyethylene pipe and tensening wire

  • @DeepakSaini-ck5uj
    @DeepakSaini-ck5uj Рік тому +1

    Very knowledgeable can u make analysising Rates all those work in complete bridge & can give the PDF of master quality plaa pdf

  • @ravallaxman8224
    @ravallaxman8224 2 роки тому

    Thank you sir for giving best infromation and please sir send link master quality control plan

  • @ranjanseal6054
    @ranjanseal6054 2 роки тому +1

    Pls share detail calculation of static loadtest with graph

  • @nirmalSiddharth9547
    @nirmalSiddharth9547 Рік тому

    Make video for pile,pile cap, abutment reinforcement BBS

  • @irfanullah3515
    @irfanullah3515 2 роки тому +1

    Sir pls define different between sonic logic and pile intregety test pls

  • @RandhirKumar-pi2rw
    @RandhirKumar-pi2rw 11 місяців тому

    Friction test pile

  • @anilsen7366
    @anilsen7366 Рік тому

    Many types of various types oftest

  • @ajaygiri1117
    @ajaygiri1117 3 роки тому +3

    Very nice vidio

  • @kasturiraju172
    @kasturiraju172 2 роки тому

    Pls explain about Special Bridges i e Creek and Extra dose Bridges

  • @shahupatel5086
    @shahupatel5086 2 роки тому +1

    Pls share bride construction link

  • @manishranjan4524
    @manishranjan4524 2 роки тому +1

    Please send video Steel girder fabrication

  • @atulmishra3063
    @atulmishra3063 2 роки тому +2

    Yea baala chart humkoo chayea sir

  • @abdulrehmancivilengineer1385
    @abdulrehmancivilengineer1385 2 роки тому

    Hello sir
    Sir please skew bridge k pedestal ta bearing pad k layout pe aik video bnao k kesy kia jata hy
    Or autocad me isko kesydraw kren or isky coordinate kesy find kren ge

  • @haqueciviltech
    @haqueciviltech Рік тому

    Segment launching in bridge construction 🚧 make the video sir

  • @salimahmed5661
    @salimahmed5661 2 роки тому

    using release hook is more safe for dynamic load test

  • @vinaynagaraj5163
    @vinaynagaraj5163 2 роки тому

    Please share the Various bridge test data in the link to have basic knowledge

  • @sunilkumar-jf7dq
    @sunilkumar-jf7dq Рік тому

    good sir

  • @Umerislam48ii
    @Umerislam48ii 8 днів тому

    Nice job plz send me all vedios

  • @RajveerSinghCivil
    @RajveerSinghCivil Рік тому

    Sir, what's lateral load test?

  • @naimatullah5337
    @naimatullah5337 Рік тому

    sir please mention permissible displacement or sentiment

  • @goutamkarmakar5608
    @goutamkarmakar5608 2 роки тому

    Plz shown a vedio,how I understand that how long distance to be gone a pile

  • @mohdmofiz8037
    @mohdmofiz8037 Місяць тому

    Okay

  • @adeebkamil8203
    @adeebkamil8203 2 роки тому +1

    Best quality provide but with is code pdf link attach in description

  • @rajdayma6410
    @rajdayma6410 2 роки тому

    It is requested to you kindly share the link of various tests

  • @abdullahmughal5506
    @abdullahmughal5506 Рік тому

    Dear , In dynamic the load is not 2.5 times of the safe, it could be 15 to 30 tons , and accordingly you decide the height of drop. kindly correct it, many people will be misleading this ..

  • @amitsahu2756
    @amitsahu2756 2 роки тому +1

    Site test ka result formats bhi btaiega

  • @markandaygiri9553
    @markandaygiri9553 2 роки тому +1

    Sir can you share pdf file of all types of testing perform in pile and soil.?

  • @surajbhatt6407
    @surajbhatt6407 Рік тому

    Sir what is CHSL test on pile... Cross hole sonic logging test can u explain sir

  • @rajajani5494
    @rajajani5494 3 роки тому +1

    sir ji can you prepare rate analysis also for different activities like Concreting/plastering/roof truss/steel structure?

  • @dhirajmishra2961
    @dhirajmishra2961 Рік тому

    Sir total station machine kaise kaam karti hai or iska use kaise kar sakte hai sath hi ek isthan se reading ko doosre isthan pe kaise transfer karte hai plz sir it's my humble request to you.plz make a animated clip. Thank you

  • @mohdmuzeeb5717
    @mohdmuzeeb5717 2 роки тому

    Sir proof coring test pr video banaiye

  • @shahupatel5086
    @shahupatel5086 2 роки тому

    Well foundation pls share

  • @rohit1205
    @rohit1205 3 роки тому +5

    Sir if pile fails after plate load test then what should we do?

  • @debjitbanerjee9538
    @debjitbanerjee9538 Рік тому

    please share bidirectional test

  • @vaibhavpawar1500
    @vaibhavpawar1500 11 місяців тому

    Anchor pile ka Bhi Batao Static Load Test Mye Load Impliment Mye Uskaa Main Function Hai

  • @ankitkaware0.1
    @ankitkaware0.1 10 місяців тому

    Sir permissible displacement kitna rhna chahiye aur reference