The instructions included with HY-270 say that for multi-wythe brick, you should fill the screen tube outside the bore hole, which is not what was demonstrated here @ 5:00
Hi, So what size/length screen tube was used here? also, whats size threaded road? I am trying to anker a 2 x 8 ledger board into an exterior brick wall per my city code requirement. Any ideas?
The instructions included with HY-270 say that for multi-wythe brick, you should fill the screen tube outside the bore hole, which is not what was demonstrated here @ 5:00
Hi, So what size/length screen tube was used here? also, whats size threaded road? I am trying to anker a 2 x 8 ledger board into an exterior brick wall per my city code requirement. Any ideas?
Do you have to pierce the tube to get the adhesive out? Or just put in the gun and squeeze? Need to know NOW !!
You must just put it in the gun, as I remember
I believe this is the HY 200, not the HY 270
где очки чувак?!?