Dried In! 1 Floor and 7 Doors, Mini Split Rough, and HRV ducting

Поділитися
Вставка
  • Опубліковано 16 жов 2024
  • We are finally dried in! We installed all the doors except the front door (which has not arrived yet). As all the windows are in and the doors installed, we can lock the barn up! Dried in!
    Other things: I installed a subfloor in the storage loft, and roughed in all the HVAC mini split lines, including the HRV ducting (Heat Recovery Ventilation).
    BaseCamp Barn Project Episode 33: 1 Floor and 7 Doors