Розмір відео: 1280 X 720853 X 480640 X 360
Показувати елементи керування програвачем
Автоматичне відтворення
Автоповтор
My train at Sydney had to stop at a red light for a very long time cause the doors on the train that was going to Tallawong wouldn’t lock so they had to drive the train with the doors open so my train could pull into the platform😮
Thank for the hart
B set
What speed is train doing as the final carriage leaves the platform.?
About 80 - 100kph
@@Jyetravels thank you
My train at Sydney had to stop at a red light for a very long time cause the doors on the train that was going to Tallawong wouldn’t lock so they had to drive the train with the doors open so my train could pull into the platform😮
Thank for the hart
B set
What speed is train doing as the final carriage leaves the platform.?
About 80 - 100kph
@@Jyetravels thank you