22ft Polytunnel | Timber & Screen Base Rails | M2223

Поділитися
Вставка
  • Опубліковано 31 лип 2024
  • Are you following the process of our 22ft Polytunnel Building? In which case, for those with timber side rails, this video is essential for learning about screen ventilation.
    The process starts with Timber Base Rails Fitting in 22ft Polytunnel. These base rails lay the foundation for your polytunnel's structure, providing essential stability and longevity. Through detailed instructions, we lead you through the selection and fitting of these base rails, establishing the groundwork for a stable and reliable polytunnel.
    A key component of our guide is the installation of a Ventilation Screen for 22ft Polytunnel. Proper ventilation is crucial for maintaining an optimal growing environment, enabling effective control over temperature and humidity. We delve into the specifics of setting up a ventilation screen, ensuring your plants receive ideal air circulation.
    Furthermore, we focus on the Side Rail Installation in 22ft Polytunnel. Correctly installed side rails are vital for the structural integrity of your polytunnel and support the overall ventilation system. We provide expert guidance on installing side rails, enhancing the stability within your polytunnel.
    Another significant aspect covered is the Gearbox Winding Installation for 22ft Polytunnel. This segment introduces an advanced technique for managing ventilation. The gearbox winding system offers precise airflow control, allowing for easy adjustments to meet the specific needs of your commercial polytunnel.
    Key steps must be met throughout a 22ft Polytunnel Assembly, from the fitting of timber base rails to the implementation of advanced ventilation techniques with the gearbox winding system. By following our detailed guide, you'll be equipped to construct a 22ft Polytunnel perfect for your crops that withstands various weather conditions in the UK. For further insights, check out our construction services team and how they can aid your construction.
    Chapters:
    0:00-0:13 - Introduction
    0:14-0:21 - Timber Base Rail Measurements
    0:22-2:15 - Measuring, Marking, and Adding Q Clips Around Corner Clamp
    1:58-2:25 - Securing Side Rail
    2:25-3:00 - Adding Another Section
    3:01-4:14 - How To Fit Side Rail From Door Post to Corner Hoop
    4:15-5:23 - Install Side Ventilation and Screen Ventilation
    5:24-6:05 - Fit Corner Polythene Panels
    6:06-6:40 - Important Info About Fitting Cover To A Timber Rail
    6:40-7:10 - Timber Post Measurements
    7:11-10:15 - Assemble Gearbox Winding System
    10:16-11:31 - Fix Ventilation Net and Corner Polythene Panels
    11:32-12:10 - Secure Ventilation Net to Base Rail
    12:11-13:00- Fixing Corner Polythene Panel to Doorpost and Corner Base Rail
    13:01-13:22 - Construction Services and Outro
  • Навчання та стиль

КОМЕНТАРІ •