The engineers working on the road should be out there on location looking at what is happening to see how the drains are to be aligned to prevent flooding in the future.
Send the water in the direction of the bridge with a properly constructed drain that won’t erode the side of the bridge when the water is flowing heavily.
No representation. James Robertson can't be allowed back in St. Thomas. Does nothing for his constituency. Get millions per year for doing nothing. Glad not even the thieving JLP party, which is what most people voted for' can give him another term. Can't wait to vote them out. They shouldn't even be the opposition...they all just go...vanish...crooks!
Slackness dat bredda, all that is needed is a proper drain going to the bridge. That water is supposed to be coming from up Red Hills road and other places.
Build Rite don’t have the technical ability to deal with this road but the government refuse to take it from them , it’s gonna take another 5yrs for this tiad to be done bcuz of the politics onvolved
The engineers working on the road should be out there on location looking at what is happening to see how the drains are to be aligned to prevent flooding in the future.
Send the water in the direction of the bridge with a properly constructed drain that won’t erode the side of the bridge when the water is flowing heavily.
Welcome to jamrock, because of no accountability things get done when ever and however.
Ui from Barbados 🇧🇧, please be safe brothers and sisters.
Blessings
Hey you a work eno boss 🤣🤣 dat is it love the update them
Total shame
No one is accountable
When will we have some kind of representation
Only in St Thomas
No representation. James Robertson can't be allowed back in St. Thomas. Does nothing for his constituency. Get millions per year for doing nothing. Glad not even the thieving JLP party, which is what most people voted for' can give him another term. Can't wait to vote them out. They shouldn't even be the opposition...they all just go...vanish...crooks!
I would not be surprised that those who are doing the road works, piled a lot of gravel and dirt at the mouth of the drains .
Is this a pool or something????
Good job klarity,keep them honest
the road need a serious high up
Jah know road need to get higher
It is lack of drainage . Once the drains are fixed that problem should be solved .
Maybe is a good thing so the engineers see the problem areas before them.collect and gone
Slackness dat bredda, all that is needed is a proper drain going to the bridge. That water is supposed to be coming from up Red Hills road and other places.
Authorities the road need to lift. No proper drains.
Only thing them can do good a Jamaica a Thief😁😁😁😁😁
I past there abt 10am this morning and it wasn’t flooded so I’m happy I made it before it got this bad
Just hope CHEC hurry complete Mandeville so them can reach this side
Oh my😳water more than flour.
This is un-acceptable ..
a the hurricane season we inna we a get a hurricane this year
Build Rite don’t have the technical ability to deal with this road but the government refuse to take it from them , it’s gonna take another 5yrs for this tiad to be done bcuz of the politics onvolved
mussi own by a politician
That's what happened when u give people work to do that don't know what they are doing hast make waste