HO Scale Shelf Layout Build CSCO

Поділитися
Вставка
  • Опубліковано 9 січ 2025

КОМЕНТАРІ •

  • @tracksidemike
    @tracksidemike 2 роки тому +3

    Fantastic Chessie System your switching to HO Scale 😂😂 great video buddy looking forward to the updates and progress 👍🏻🔔🇨🇦🚂🥓

    • @chessiesystemcanadianopera2143
      @chessiesystemcanadianopera2143  2 роки тому +1

      Hahaha thanks very much glad to have you following along, looking forward to the transition down the road forsure

  • @MMRails
    @MMRails 2 роки тому +2

    Talk about eye level. That’s awesome. I look forward to seeing your progress.

  • @4everdc302
    @4everdc302 2 роки тому +2

    Very cool. Looking forward to your construction👷I need a shelf gig but I'll wait till I get the Rapido GP9&slug.

  • @mattschaum4872
    @mattschaum4872 2 роки тому +2

    Looks like a great start! Hope to see lots of covered hoppers!

  • @davidchaplin7839
    @davidchaplin7839 2 роки тому +1

    Great track plan loads of operational fun looks good to me

  • @cpwhiskycreek
    @cpwhiskycreek 2 роки тому +3

    Very exciting, have to be honest I’ve considered doing the same so looking forward to watching your progress

    • @chessiesystemcanadianopera2143
      @chessiesystemcanadianopera2143  2 роки тому

      Thanks very much, it should be a lot of fun. Looking forward to working in a different scale and adapting my techniques

    • @tracksidemike
      @tracksidemike 2 роки тому

      CP Whiskey Creek in N Scale
      Oh you are thinking about it too. Don’t tell Tim TheyMakeItLikeThat 😂😂

  • @the_BRD_sub_byDonHennessy
    @the_BRD_sub_byDonHennessy 2 роки тому +1

    I’m liking your thoughts behind the track design, the industry above your workbench sounds like a good place for staging. Cheers

  • @davestrains6816
    @davestrains6816 2 роки тому +1

    Looking great!!

  • @johnarthur6302
    @johnarthur6302 2 роки тому +3

    I think you’re going to like switching and operations in HO scale - as for the rail, have you considered code 70? Might be a good compromise - both lighter rail and also reliable.

    • @chessiesystemcanadianopera2143
      @chessiesystemcanadianopera2143  2 роки тому

      I had not, I will need to do some research and better understand what is available! Thanks for the input and for following along

  • @camaschris4196
    @camaschris4196 2 роки тому +1

    Awesome start. I can't wait for updates. Instead of code 55, why not code 70? Post progress on the Second Section. I'm on there all the time, CamasChris.

    • @chessiesystemcanadianopera2143
      @chessiesystemcanadianopera2143  2 роки тому +1

      Will do my friend thank you for following along! I will definitely be diving into the different codes available

  • @rogereldridge8233
    @rogereldridge8233 2 роки тому +1

    Interesting concept, if you going to do operations on the single module would you not need a runaround on that module as you have a combination of trailing and facing point switches ?

  • @darenhamill9881
    @darenhamill9881 Рік тому +1

    Hi