Chesterton Training: Pump Packing Installation - Part 5

Поділитися
Вставка
  • Опубліковано 10 лип 2024
  • Crucial steps for starting the pump after packing installation. For more information, visit our website at: Chesterton.com

КОМЕНТАРІ • 3

  • @bigpappaface1
    @bigpappaface1 3 місяці тому

    What is a good time out period, between adjustment?

  • @GemmyHeart
    @GemmyHeart Рік тому

    Main products: sealing gasket,gland packing,PTFE/graphite/asbestos products, ceramic fiber products, high temperature heat insulation and fireproof material.
    Free technical support (sealing, heat preservation, heat insulation, fire prevention problems)
    All products 1 piece can also be customized, 30 years of service experience, fast and safe shipping anywhere.

  • @sidds2004
    @sidds2004 3 роки тому

    I want to know what should be the orientation of the packings. For example while placing the first packing should the cut portion face the downside so as to allow cooling water in.
    Then we can stagger the remaining packing cut pirtions 90 degrees apart.
    Is that correct?